General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictEAST SINGHBHUM
AuthorityMANGO MUNICIPAL CORPORATION
Inward_NoMNAC/BP/0009/W10/2019
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaOld Area
City Area/TPScheme NoNA
VillageMango
Taluka16
Architect Details
Architect NameL K Suman
License No.MNAC/ENG/0008/2016
Architect Address2nd Floor, Basant Talkies Complex, Sankchi, Jamshedpur
Architect EmailIDlksumanoffice@gmail.com
Architect Mobile No9835131161
Plot Details
Plot Use Residential
Plot SubUse Residential Bldg/Apartment
PlotNearbyReligiousStructure NA
Plot/SubPlot No2273, 2272
NorthPlot No. - 2271
SouthPlot No. - 2273
EastPlot No. - 2268
WestRoad Width - 6.05
Owner's Details
NameSmt. Manjulika Chakrabarty and Smt.Sushama Pandey, POA Mr. Saurav Agarwal, Director of City Residency India Pvt. Ltd.
AddressKhata No.-678,202, Plot No.-2273,2272 Ward-10, Mango
Email IDbalajijsr@yahoo.com
Mobile No9308622244
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 530.10
2 Plot area as per Document by Applicant 529.62
3 Physical area measured at site 529.62
4 Area as per Site Visit (Site Visit Report) 529.62
5Area as per Drawing 529.42

Area of Plot Considered : 529.42

[-] Table 2b
Proposal Detail :
UnitMeters
Development Detail :
PlotPROPOSED RESIDENTIAL
Plot OccupancyResidential
Plot SubUse Residential Bldg/Apartment
Building StructureNon-Highrise
Building TypeSingle Detached House
Gross Plot Area 529.42
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 529.42
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 470.53
Deductions for Balance Plot Area (from Gross Plot Area)
- Common Plot 58.89
58.89
Balance Plot Area 470.53

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 60.00 % ) 317.65
Proposed Coverage Area ( 48.75 % ) 258.10
Total Prop. Coverage Area ( 48.75 % ) 258.10
Balance coverage area ( 11.25 % ) 59.55
FAR CHECK
Perm. FAR Area ( 2.50 ) 1323.55
Total Perm. FAR area 1323.55
Residential FAR 1129.65
Proposed FAR Area 1141.62
Total Proposed FAR Area 1141.62
Consumed FAR (Factor) 2.16
Balance FAR Area 181.93
BUA CHECK
Total Proposed BuiltUp Area 1410.44


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Exceeding 50 meter and upto 100 meter -
Existing Road Width 6.1 6.10
Proposed Road Width as per Master Plan 6.1 -
Road Widening Width 0.05 -
Plot size (as per measurement) 529.62 529.42
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK


[-] Plot Level Checking (Table 3)
   
[-] Common Plot Checks (Table 3b)
Name Total Area Status
Reqd Prop
Common Plot 52.94 58.89 OK


[-] Common Plot Checks (Table 3b)
Name Minimum Area Coverage Area Width Angle Access Status
Reqd Prop Perm Prop Reqd Prop Reqd Prop
Tree Cover (Plantation) - 58.89 0.00 0.00 - 2.88 - 78.54 No Access Provided OK


   
   
[-] Tree Details (Table 3g)
Name Nos Of Trees Status
Reqd Prop
Tree 4 5 OK
   
   
   
   
   


[-] Building Details (Table 4)
   
[-] Building USE/SUBUSE Details Building USE/SUBUSE Details
Building Name Building Use Building SubUse Building Structure
A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) Residential Bungalow/ Dwelling / Non Apartment Non-Highrise
   
   
   
[-] Height Details (4a)



[-] Total Height (Table 4a-1)
Building Height Height (From GL) Height (From Street LVL) Status
Perm Prop
A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) 15.44 14.01 14.11 14.01 OK


   
   
[-] Floor Height Check (Table 4a-2)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) Fourth Floor 2.75 - 2.90 2.75 - 2.79 2.40 - 2.60 OK
Third Floor 2.75 - 2.90 2.75 - 2.79 2.40 - 2.60 OK
Second Floor 2.75 - 2.90 2.75 - 2.79 2.40 - 2.60 OK
First Floor 2.75 - 2.90 2.75 - 2.79 2.40 - 2.60 OK
Parking Floor - - 2.51 2.40 - 2.41 2.10 - 2.21 OK


[-] Parapet Height Check (Table 4a-2.1)
Building Name Floor Name Height Status
Reqd Perm Prop
A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) Terrace Floor 1.00 1.20 1.10 OK
   
   
   
[-] Floor Number Check (Table 4a-4)
Building Name No. of Floors No. of Tenements Status
Perm Prop Perm Prop
A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) P + 4 5 - 4 OK

 
   
    [-] Coverage Check (Table 4b)
Permissible Proposed Status
317.65 258.10 OK
60% 48.75%

[-] Individual Coverage Check
Coverage Area Perm. Prop.
  A-1 (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) - 258.10
  Total Prop. Coverage Area - 258.10
  Total Coverage Area 317.65 258.10

[-] FAR & Tenement Details (Table 4c-1)
Building No. of Same Bldg Total Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Add Area In FAR (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Lift Void Parking Resi. Stair
A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) 1 1410.44 12.92 9.76 246.13 1129.66 8.74 1141.63 1141.63 04
Grand Total : 1 1410.44 12.92 9.76 246.13 1129.66 8.74 1141.63 1141.63 04


[-] Buildingwise Floor FAR Details
Floor Name Building Name Total
A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD)
Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total Proposed Built Up Area (Sq.mt.) Total FAR Area (Sq.mt.)
Parking Floor 258.10 11.97 258.10 11.97
First Floor 288.16 282.49 288.16 282.49
Second Floor 288.06 282.39 288.06 282.39
Third Floor 288.06 282.39 288.06 282.39
Fourth Floor 288.06 282.39 288.06 282.39
Terrace Floor 0.00 0.00 0.00 0.00
Total : 1410.44 1141.63 1410.44 1141.63


[-] UnitBUA Table for Building :A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
FIRST FLOOR PLAN A FLAT 277.45 262.80 33 1
TYPICAL - 2, 3& 4 FLOOR PLAN B FLAT 277.35 267.21 33 3
Total: - - 1109.49 1064.42 132 4


[-] Building :A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD)
Floor Name Total Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Add Area In FAR (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Lift Void Parking Resi. Stair
Parking Floor 258.10 0.00 0.00 246.13 0.00 8.74 11.97 11.97 00
First Floor 288.16 3.23 2.44 0.00 282.49 0.00 282.49 282.49 01
Second Floor 288.06 3.23 2.44 0.00 282.39 0.00 282.39 282.39 01
Third Floor 288.06 3.23 2.44 0.00 282.39 0.00 282.39 282.39 01
Fourth Floor 288.06 3.23 2.44 0.00 282.39 0.00 282.39 282.39 01
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 00
Total : 1410.44 12.92 9.76 246.13 1129.66 8.74 1141.63 1141.63 04
Total Number of Same Buildings : 1
Total : 1410.44 12.92 9.76 246.13 1129.66 8.74 1141.63 1141.63 04
[-] Table 4c-2

  FAR Area
Building FAR Area:1141.62
Existing FAR Area :0.00
Perm.
1323.55
Prop.
1141.62
Status
OK




[-] Margin Checks (Table 5)
   
[-] Plot Margin (Table 5a)
Building / Wing Road Name Front Side Rear Side Side1 Side2 Status
Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop.
A-1 (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) 6.1 M WIDE ROAD 3.50 5.13 2.50 2.51 2.00 2.05 2.00 2.04 OK






[-] Inner Building Details (Table 6)
   
   
[-] Lift Details (Table 6d)
Building Name Height Number Of Lift(s) Status
Prop Reqd Prop
A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) 14.01 1 1 OK

[-] Lift Check Table

[-] For Building :A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD)
Floor Name Lift Name Width Depth Status
Reqd Prop Reqd Prop
PARKING FLOOR PLAN Lift 1.70 1.70 1.90 1.90 OK
FIRST FLOOR PLAN Lift 1.70 1.70 1.90 1.90 OK
TYPICAL - 2, 3& 4 FLOOR PLAN Lift 1.70 1.70 1.90 1.90 OK
TERRACE FLOOR PLAN Lift Machine Room 1.70 1.70 1.90 1.90 OK

   


[-] Parking Details (Table 7)
   
[-] Required Parking(Table 7a)
Building Name Type SubUse Area (Sq.mt.) Units Car Visitors Car TwoWheeler
Reqd. Prop. Reqd./Unit Reqd. Prop. Reqd./Unit Reqd. Prop. Reqd./Unit Reqd. Prop.
A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) Residential Bungalow/ Dwelling / Non Apartment > 0 1 4.00 1.00 4 - - - - - - -
> 0 1 4.00 - - - 1 1 - - - -
Total : - - - - 4 11 - 1 1 - 0 4

[-] Parking Check (Table 7b)
Vehicle Type Reqd. Prop. Status
No. Area No. Area
Car - - 11 137.50 OK
Total Car 4 50.00 11 137.50 OK
Visitor's Car Parking - - 1 12.50 OK
Total Visitor Parking 1 12.50 1 12.50 OK
TwoWheeler - - 4 8.00 OK
Total TwoWheeler - - 4 8.00 OK
Other Parking - - - 129.63 OK
Total 62.50 308.13 OK

Individual Parking Checks (Table 7c)
Dimensions and Area for all Vehicle(s) are as per the Rules

Driveway Parking Checks (Table 7d)
Plot Level Parking Driveway is as per the Rules
Floor Level Parking Driveway is as per the Rules
   


[-] Exemption Details (Table 8)
   


Not Required to Check StairCase Number Rule.


[-] Staircase Checks (Table 8a-1)


[-] For Building :A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
PARKING FLOOR PLAN STAIRCASE 0.900 1.148 0.250 0.256 0.200 0.126 - 10 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.900 1.148 0.250 0.256 0.200 0.145 - 10 - - 0.000 OK
TYPICAL - 2, 3& 4 FLOOR PLAN STAIRCASE 0.900 1.148 0.250 0.256 0.200 0.145 - 10 - - 0.000 OK

   
   
   

[-] Ramp Checks(Table 8b)
Ramp Name Width Depth Slope Status
Reqd Prop Reqd Prop Reqd Perm Prop
0.70 mt. long 0.10 mt. High 4.50 mt. Wide Ramp 3.60 0.70 1.00 0.10 1.00 : 8.00 - 01 : 07 Failed


[-] Ramp Checks (Table 8b)
Building Name Floor Name No. Status
Reqd Prop
A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) PARKING FLOOR PLAN - 1 OK
FIRST FLOOR PLAN - 1 OK
TYPICAL - 2, 3& 4 FLOOR PLAN - 3 OK
TERRACE FLOOR PLAN - 1 OK

   
   
[-] Arch Projection Checks (Table 8c - a)

[-] For Building :A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD)
Floor Name Arch Proj Name Width Depth Area Status
Perm Prop Perm Prop Perm Prop
FIRST FLOOR PLAN C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
TYPICAL - 2, 3& 4 FLOOR PLAN C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
C.B. 0.60 0.60 - 1.20 - 0.72 OK
   
   
   
[-] Accessory Use Check (Table 8d)
Accessory Use Name Area Width Depth Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
RAIN WATER HARVESTING - - 4.50 - - 1.50 - - 3.00 - - 0.00 OK
ENT.GATE - - 0.47 - - 0.12 - - 4.00 - - 0.00 OK





[-] Accessory Use No. Checks
Building Name Accessory Use Name No Status
Reqd Perm Prop
A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD) Rain Water Harvesting 1 - 1 OK
Solar Water Heating System 1 - 0 Failed
Entrance Gate 1 - 1 OK
   
   


[-] Floor Details (Table 9)
   

[-] Building:A (SMT MANJULIKA CHAKRABARTY AND SMT SUSHAMA PANDEY POA MR SAURAV AGARWAL DIRECTOR OF CITY RESIDENCY INDIA PVT LTD)


[-] Floor:PARKING FLOOR PLAN



No Room Found.


[-] Floor:FIRST FLOOR PLAN



All Dimensions and Area of all the Rooms on this Floor are as per the Rules.

[-] Floor:TYPICAL - 2, 3& 4 FLOOR PLAN



All Dimensions and Area of all the Rooms on this Floor are as per the Rules.


   


[-] Summary (Table 10)
   
Name Perm./Reqd. Proposed Status
  Plot Area - 529.42 OK
  Plot Width - 20.48 OK
  Plot Depth - 25.85 OK
  Access Width 6.10 6.10 OK
  Plot Frontage - 4.00 OK
  Coverage Area 317.65 258.10 OK
  FAR Area
Bldg. FAR Area : 1141.62
Sanctioned FAR Area :0.00
1323.55 1141.62 OK





[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use
Plot Width No rule provided for Min. Plot size for proposed Use
Plot Depth No rule provided for Min. Plot size for proposed Use
Access Width The minimum width of abutting road for any Building more than 13.3 mt. ht. shall be 6.1 mt.{As per Rule no. 35.1 Note 4}
Plot Frontage No rule provided for Min. Plot size for proposed Use
FAR Area (1) In Old Area, for Residential Building on abutting roadwidth 6.10 (20 ft.) to 7.5 mt., the Floor Area Ratio-FAR shall be 2.5 {As per Rule No.39, Table 15 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
(2) For MANGO NAC, Max. 2.5 permissible FAR may be permitted for Residential Use {As per Annexure III}
Consumed FAR (1) In Old Area, for Residential Building on abutting roadwidth 6.10 (20 ft.) to 7.5 mt., the Floor Area Ratio-FAR shall be 2.5 {As per Rule No.39, Table 15 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
(2) For MANGO NAC, Max. 2.5 permissible FAR may be permitted for Residential Use {As per Annexure III}
Common Plot Area In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
Common Plot (1) In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
(2) ;
Tree Number 4-8 Trees shall be required for the Plot area above 250.0 and upto 1000.0 sq.mt. (As per Rule No. 20.1.6)
Margin Rule For Non-highrise Residential Building 13.3-16.4 mt. Ht. having Plot Depth 21-27 mt. and Plot width 15-21 mt., Margin required in Front shall be 3.5 mt., Rear 2.5 mt. and 2.0 mt. shall be provided on both side. {As per Rule No. 36 (Table 8 & 9)}
For parking spaces in basements and upper storey of parking floors, at least two ramps of minimum of 3.00m width if it is strait and 3.6 width if it is curved at any point, or one ramp of minimum 4.5 m width and with minimum slope gradient of 1:8 for depth up to 1.8m and 1:10 for more than 1.8m depth shall be provided. In the case of Hospitals, the slope of ramp shall not be greater than 1:20 {As per Rule No. 41.8} ;
Building Level
Building Height For old area, on Road width 6.10-7.50 mt., Permissible height shall in no case exceed(1.5 times the width oftheroadonwhichtheplot abuts) + Road widening + the front setback or 16.4 mt. {As per Rule No. 39.1 Table 15}
Floor Height (1) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(2) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(3) Stilt floor is of minimum height of 2.4 meter. From floor to ceiling and not less than 2.10 mt. from the soffit of beams
Parapet Height Parapet walls and handrails provided on the edges of roof terraces, balcony, verandah, etc shall not be less than 1.0 m and not more than 1.2 m in height from the finished floor level {As per Rule No. 42.5}
Floor Number For old area location,on Road width 6.1-7.5 mt. only Stilt + 4 floors shall be allowed {As per Rule No. 39.1 Table 15}
Lift Count (1) The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
(2) For Residential Building height 12.0 mt. or above, upto G+4 floors or if the number of flats is upto 16, provision of lift will be compulsory. {As per Rule No. 49.1.2}
Lift (1) The area of lift well at one floor only (not the sum of total area of lift well at every floor) shall be counted for F.A.R calculation)
(2) The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
(3) The area of lift well shall not be counted for F.A.R calculation)
(4) The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
(5) -
StairCase (1) Width of Winding staircase shall be mini. 0.90 mt.,Maximum rise 0.20 mt. & Minimum tread 0.25 mt. & Cabin Height 2.1 mt. {As per Rule No. 83.18}
(2) ; No Rule Defined
Ramp For parking spaces in basements and upper storey of parking floors, at least two ramps of minimum of 3.00m width if it is strait and 3.6 width if it is curved at any point, or one ramp of minimum 4.5 m width and with minimum slope gradient of 1:8 for depth up to 1.8m and 1:10 for more than 1.8m depth shall be provided. In the case of Hospitals, the slope of ramp shall not be greater than 1:20 {As per Rule No. 41.8} ;
Ramp No. -
Arch Projection (1) No need to check
(2) Cupboard up to 0.60 mt. in width shall be permitted. {As per Rule 6.26.1 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Plot / Building Level
Accessory Use (1) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(2) No need to check distance from Building RAIN WATER HARVESTING
(3) No need to check distance from Building ENT.GATE
Accessory Use Number (1) Provision of rainwater harvesting shall be mandatory for 300 sqm. and above size of plots-The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area Rain Water Harvesting
(2) For Individual residential buildings having more than 150 sq m. plinth area, Provisions of Solar Water Heating System shall be done Solar Water Heating System
(3) In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premise shall not be less than 5 (five) meters i n width in order to allow easy access to fire engine Entrance Gate
Building Level (Rooms)