No Image Found   

Detail Scrutiny Report

Mango Municipal Corporation

Version Number: 1.0.62  
Version Date: 16/10/2020 
Report Generated On: 16-03-2022 
 
[-] Collapse All


General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictEAST SINGHBHUM
AuthorityMANGO MUNICIPAL CORPORATION
Inward_NoMNAC/BP/0070/W8/2021
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaNew Area
City Area/TPScheme NoNA
VillageMango
Taluka16
Architect Details
Architect NameMOHAMMAD BELAL NASIR
License No.MNAC/ENG/0007/2016
Architect AddressHOLDING No: 02, CROSS ROAD No:1/D, AZAD NAGAR, MANGO
Architect EmailIDdreamdesign.jsr.bn@gmail.com
Architect Mobile No9835307058
Plot Details
Plot Use Residential
Plot SubUse Bungalow/ Dwelling / Non Apartment
PlotNearbyReligiousStructure NA
Plot/SubPlot No3148
North -
South -
East -
West -
Owner's Details
NameMR. MOHAMMAD MOINUDDIN
AddressROAD NO. 16 JAWAHAR NAGAR, MANGO JAMSHEDPUR
Email IDtariq-azam@rediffmail.com
Mobile No7870968930
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 267.59
2 Plot area as per Document by Applicant 267.28
3 Physical area measured at site 267.28
4 Area as per Site Visit (Site Visit Report) 267.28
5Area as per Drawing 267.28

Area of Plot Considered : 267.28

[-] Table 2b
Proposal Detail :
UnitMeters
Development Detail :
PlotPLOT
Plot OccupancyResidential
Plot SubUse Bungalow/ Dwelling / Non Apartment
Building StructureNon-Highrise
Building TypeSingle Detached House
Gross Plot Area 267.28
Deduction from Gross Plot area
- Surrender Free of Cost 6.25
6.25
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 261.02
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 235.23
Deductions for Balance Plot Area (from Gross Plot Area)
- Surrender Free of Cost 6.25
- Common Plot 25.80
32.05
Balance Plot Area 235.23

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 60.00 % ) 156.61
Proposed Coverage Area ( 58.44 % ) 152.53
Total Prop. Coverage Area ( 58.44 % ) 152.53
Balance coverage area ( 1.56 % ) 4.08
FAR CHECK
Perm. FAR Area ( 2.00 ) 534.56
Total Perm. FAR area 534.56
Residential FAR 517.38
Proposed FAR Area 530.38
Total Proposed FAR Area 530.38
Consumed FAR (Factor) 1.98
Balance FAR Area 4.18
BUA CHECK
Total Proposed BuiltUp Area 737.37


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Up to 50 meter -
Existing Road Width 6.1 6.10
Proposed Road Width as per Master Plan 6.1 -
Road Widening Width 0 0.55
Plot size (as per measurement) 267.28 267.28
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK


[-] Plot Level Checking (Table 3)
   
[-] Common Plot Checks (Table 3b)
Name Total Area Status
Reqd Prop
Common Plot 13.05 25.80 OK


[-] Common Plot Checks (Table 3b)
Name Minimum Area Coverage Area Width Angle Access Status
Reqd Prop Perm Prop Reqd Prop Reqd Prop
Tree Cover (Plantation) - 25.80 0.00 0.00 - 1.68 - 88.22 No Access Provided OK


   
   
[-] Tree Details (Table 3g)
Name Nos Of Trees Status
Reqd Prop
Tree 4 19 OK
   
   
   
   
   


[-] Building Details (Table 4)
   
[-] Building USE/SUBUSE Details Building USE/SUBUSE Details
Building Name Building Use Building SubUse Building Structure
A (MOHAMMAD MOINUDDIN) Residential Residential Bldg/Apartment Non-Highrise
   
   
   
[-] Height Details (4a)



[-] Total Height (Table 4a-1)
Building Height Height (From GL) Height (From Street LVL) Status
Perm Prop
A (MOHAMMAD MOINUDDIN) 12.79 11.52 11.52 11.52 OK


   
   
[-] Floor Height Check (Table 4a-2)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
A (MOHAMMAD MOINUDDIN) Third Floor 2.75 - 2.88 2.75 - 2.77 2.40 - 2.50 OK
Second Floor 2.75 - 2.88 2.75 - 2.76 2.40 - 2.50 OK
First Floor 2.75 - 2.88 2.75 - 2.77 2.40 - 2.50 OK
Ground Floor 2.75 - 2.88 2.75 - 2.77 2.40 - 2.50 OK
Plinth 0.45 - 0.45 - - 0.45 - - 0.45 OK


[-] Parapet Height Check (Table 4a-2.1)
Building Name Floor Name Height Status
Reqd Perm Prop
A (MOHAMMAD MOINUDDIN) Terrace Floor - - 1.00 OK
   
   
   
[-] Floor Number Check (Table 4a-4)
Building Name No. of Floors No. of Tenements Status
Perm Prop Perm Prop
A (MOHAMMAD MOINUDDIN) G + 4 4 - 1 OK

 
   
    [-] Coverage Check (Table 4b)
Permissible Proposed Status
156.61 152.53 OK
60% 58.44%

[-] Individual Coverage Check
Coverage Area Perm. Prop.
  A-1 (MOHAMMAD MOINUDDIN) - 152.53
  Total Prop. Coverage Area - 152.53
  Total Coverage Area 156.61 152.53

[-] FAR & Tenement Details (Table 4c-1)
Building No. of Same Bldg Total Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Add Area In FAR (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Lift Lift Machine Parking Resi. Stair
A (MOHAMMAD MOINUDDIN) 1 737.37 9.78 3.23 193.98 517.38 13.00 530.38 530.38 01
Grand Total : 1 737.37 9.78 3.23 193.98 517.38 13.00 530.38 530.38 01


[-] Buildingwise Floor FAR Details
Floor Name Building Name Total
A (MOHAMMAD MOINUDDIN)
Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total Proposed Built Up Area (Sq.mt.) Total FAR Area (Sq.mt.)
Ground Floor 210.21 13.00 210.21 13.00
First Floor 175.72 172.46 175.72 172.46
Second Floor 175.72 172.46 175.72 172.46
Third Floor 175.72 172.46 175.72 172.46
Terrace Floor 0.00 0.00 0.00 0.00
Total : 737.37 530.38 737.37 530.38


[-] UnitBUA Table for Building :A (MOHAMMAD MOINUDDIN)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
FIRST FLOOR PLAN SPLIT A FLAT 517.38 457.68 17 1
SECOND FLOOR PLAN SPLIT A FLAT 0.00 0.00 17 0
THIRD FLOOR PLAN SPLIT A FLAT 0.00 0.00 17 0
Total: - - 517.38 457.68 51 1


[-] Building :A (MOHAMMAD MOINUDDIN)
Floor Name Total Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Add Area In FAR (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Lift Lift Machine Parking Resi. Stair
Ground Floor 210.21 0.00 3.23 193.98 0.00 13.00 13.00 13.00 00
First Floor 175.72 3.26 0.00 0.00 172.46 0.00 172.46 172.46 01
Second Floor 175.72 3.26 0.00 0.00 172.46 0.00 172.46 172.46 00
Third Floor 175.72 3.26 0.00 0.00 172.46 0.00 172.46 172.46 00
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 00
Total : 737.37 9.78 3.23 193.98 517.38 13.00 530.38 530.38 01
Total Number of Same Buildings : 1
Total : 737.37 9.78 3.23 193.98 517.38 13.00 530.38 530.38 01
[-] Table 4c-2

  FAR Area
Building FAR Area:530.38
Existing FAR Area :0.00
Perm.
534.56
Prop.
530.38
Status
OK




[-] Margin Checks (Table 5)
   
[-] Plot Margin (Table 5a)
Building / Wing Road Name Front Side Rear Side Side1 Side2 Status
Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop.
A-1 (MOHAMMAD MOINUDDIN) ROAD WIDENING AREA(SURRENDERED FREE OF COST) 3.00 3.09 2.25 2.51 0.90 0.92 0.90 1.26 OK






[-] Inner Building Details (Table 6)
   

No OTS/Duct/VShaft/Balcony/Passage/Lift/Tenements Found.
   


[-] Parking Details (Table 7)
   

NO PARKING CHECK REQUIRED FOR SINGLE DWELLING UNIT. Residential Bldg/Apartment, In Building: A (MOHAMMAD MOINUDDIN)
   


[-] Exemption Details (Table 8)
   


Not Required to Check StairCase Number Rule.


[-] Staircase Checks (Table 8a-1)


[-] For Building :A (MOHAMMAD MOINUDDIN)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN STAIRCASE 0.900 1.067 0.250 0.267 0.200 0.115 - 9 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.900 1.067 0.250 0.267 0.200 0.115 - 9 - - 0.000 OK
SECOND FLOOR PLAN STAIRCASE 0.900 1.067 0.250 0.267 0.200 0.115 - 9 - - 0.000 OK
THIRD FLOOR PLAN STAIRCASE 0.900 1.067 0.250 0.267 0.200 0.115 - 9 - - 0.000 OK
TERRACE FLOOR PLAN STAIRCASE - 1.067 - 0.267 - 0.000 - 0 - - 1.446 OK

   
   
   
[-] Accessory Use Check (Table 8d)
Accessory Use Name Area Width Depth Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
Sewage Treatment Plant - - 0.68 - - 0.62 - - 1.11 - - 0.00 OK
RAIN WATER HARVESTING - - 1.68 - - 1.46 - - 1.47 - - 0.00 OK
SOLAR HEATING SYSTEM - - 0.83 - - 0.62 - - 1.34 - - 0.00 OK





[-] Accessory Use No. Checks
Building Name Accessory Use Name No Status
Reqd Perm Prop
A (MOHAMMAD MOINUDDIN) Rain Water Harvesting 1 - 1 OK
Entrance Gate 1 - 0 Failed
   
   


[-] Floor Details (Table 9)
   

[-] Building:A (MOHAMMAD MOINUDDIN)


[-] Floor:GROUND FLOOR PLAN



No Room Found.


[-] Floor:FIRST FLOOR PLAN

[-] Misc Checks (Table 9a)
Tnmt No. Room Name Area Width Depth Ventilation Status
Reqd Prop Reqd Prop Reqd Prop Reqd Prop
SPLIT A TOILET 2.29X1.21 2.80 2.77 1.20 1.21 1.20 2.29 0.30 0.73 Failed
TOILET 2.29X1.21 2.80 2.77 1.20 1.21 1.20 2.29 0.30 0.73 Failed

[-] Floor:SECOND FLOOR PLAN

[-] Misc Checks (Table 9a)
Tnmt No. Room Name Area Width Depth Ventilation Status
Reqd Prop Reqd Prop Reqd Prop Reqd Prop
SPLIT A TOILET 2.29X1.21 2.80 2.77 1.20 1.21 1.20 2.29 0.30 0.73 Failed
TOILET 2.29X1.21 2.80 2.77 1.20 1.21 1.20 2.29 0.30 0.73 Failed

[-] Floor:THIRD FLOOR PLAN

[-] Misc Checks (Table 9a)
Tnmt No. Room Name Area Width Depth Ventilation Status
Reqd Prop Reqd Prop Reqd Prop Reqd Prop
SPLIT A TOILET 2.29X1.21 2.80 2.77 1.20 1.21 1.20 2.29 0.30 0.73 Failed
TOILET 2.29X1.21 2.80 2.77 1.20 1.21 1.20 2.29 0.30 0.73 Failed


   


[-] Summary (Table 10)
   
Name Perm./Reqd. Proposed Status
  Plot Area - 261.02 OK
  Plot Width - 10.97 OK
  Plot Depth - 23.79 OK
  Access Width - 6.10 OK
  Plot Frontage - 11.38 OK
  Coverage Area 156.61 152.53 OK
  FAR Area
Bldg. FAR Area : 530.38
Sanctioned FAR Area :0.00
534.56 530.38 OK





[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Width No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Depth No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Access Width The minimum width of abutting road for any Building shall be with respect to Length of Road {As per Rule No. 34 Table No.6}
Plot Frontage No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
FAR Area (1) In New Area, for Residential Building on abutting roadwidth 6.10 (20 ft.) to 7.5 mt., the Floor Area Ratio-FAR shall be 2.0 {As per Rule No.39, Table 15}
(2) For MANGO NAC, Max. 2.5 permissible FAR may be permitted for Residential Use {As per Annexure III}
Consumed FAR (1) In New Area, for Residential Building on abutting roadwidth 6.10 (20 ft.) to 7.5 mt., the Floor Area Ratio-FAR shall be 2.0 {As per Rule No.39, Table 15}
(2) For MANGO NAC, Max. 2.5 permissible FAR may be permitted for Residential Use {As per Annexure III}
Common Plot Area In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
Common Plot (1) In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
(2) ;
Tree Number 4-8 Trees shall be required for the Plot area above 250.0 and upto 1000.0 sq.mt. (As per Rule No. 20.1.6)
Margin Rule For Non-highrise Residential Building 10-13.3 mt. Ht. having Plot Depth 21-27 mt. and Plot width 10-15 mt., Margin required in Front shall be 3.0 mt., Rear 2.25 mt. and 0.9 mt. shall be provided on both side. {As per Rule No. 36 (Table 8 & 9 and updated as per 4th Amendment dated 2nd Jan, 2019}
Building Level
Building Height For new area, on Road width 6.1-7.5 mt., Permissible height shall in no case exceed(1.5 times the width oftheroadonwhichtheplot abuts) + Road widening + the front setback or 16.4 mt. {As per Rule No. 39.1 Table 16}
Floor Height (1) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(2) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(3) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
Parapet Height Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Floor Number For new area location,on Road width 6.1-7.5 mt. only G+4 floors shall be allowed {As per Rule No. 39.1 Table 16}
Lift (1) -
(2) The area of lift well shall not be counted for F.A.R calculation)
(3) The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
StairCase (1) Width of Winding staircase shall be mini. 0.90 mt.,Maximum rise 0.20 mt. & Minimum tread 0.25 mt. & Cabin Height 2.1 mt. {As per Rule No. 83.18}
(2) ; No Rule Defined
(3) No Rule Defined
(4) ; No Rule Defined
Plot / Building Level
Accessory Use (1) -
(2) No need to check distance from Building Sewage Treatment Plant
(3) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(4) No need to check distance from Building RAIN WATER HARVESTING
(5) -
(6) No need to check distance from Building SOLAR HEATING SYSTEM
Accessory Use Number (1) Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
(2) In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premise shall not be less than 5 (five) meters i n width in order to allow easy access to fire engine Entrance Gate
Building Level (Rooms)