No Image Found   

Detail Scrutiny Report

Mango Municipal Corporation

Version Number: 1.0.64  
Version Date: 16/10/2020 
Report Generated On: 27-09-2022 
 
[-] Collapse All


General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictEAST SINGHBHUM
AuthorityMANGO MUNICIPAL CORPORATION
Inward_NoMNAC/BP/0058/W10/2022
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaOld Area
City Area/TPScheme NoNA
VillageBaliguma
Taluka16
Architect Details
Architect NameChandrika Sharma
License No.MNAC/DFTMN/0017/2017
Architect AddressShop no-4, Geetanjali Madhusudan Complex, Dimna Road, Mango, Jamshedpur
Architect EmailIDcksharma6651@gmail.com
Architect Mobile No9504973852
Plot Details
Plot Use Residential
Plot SubUse Bungalow/ Dwelling / Non Apartment
PlotNearbyReligiousStructure NA
Plot/SubPlot No1578 (C)
NorthPlot No. - 1578
SouthPlot No. - 1578
EastPlot No. - 5.48
WestPlot No. - 1576
Owner's Details
NameMR. MANISH KUMAR and MR. SUNNY KUMAR BOTH SON OF MR. ARVIND CHOUDHARY
AddressBALIGUMA, BAGAN AREA, MANGO, JAMSHEDPUR
Email IDprabhatconsultant6651@gmail.com
Mobile No9798423545
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 200.93
2 Plot area as per Document by Applicant 199.50
3 Physical area measured at site 199.50
4 Area as per Site Visit (Site Visit Report) 199.50
5Area as per Drawing 199.50

Area of Plot Considered : 199.50

[-] Table 2b
Proposal Detail :
UnitMeters
Development Detail :
PlotPLOT
Plot OccupancyResidential
Plot SubUse Bungalow/ Dwelling / Non Apartment
Building StructureNon-Highrise
Building TypeSingle Detached House
Gross Plot Area 199.50
Deduction from Gross Plot area
- Surrender Free of Cost 5.70
5.70
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 193.80
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 171.95
Deductions for Balance Plot Area (from Gross Plot Area)
- Surrender Free of Cost 5.70
- Common Plot 21.85
27.55
Balance Plot Area 171.95

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 70.00 % ) 135.66
Proposed Coverage Area ( 61.38 % ) 118.96
Total Prop. Coverage Area ( 61.38 % ) 118.96
Balance coverage area ( 8.62 % ) 16.70
FAR CHECK
Perm. FAR Area ( 2.500 ) 498.75
Total Perm. FAR area 498.75
Residential FAR 308.04
Proposed FAR Area 308.04
Total Proposed FAR Area 308.04
Consumed FAR (Factor) 1.54
Balance FAR Area 190.71
BUA CHECK
Total Proposed BuiltUp Area 356.91


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Exceeding 50 meter and upto 100 meter -
Existing Road Width 6.2 6.20
Proposed Road Width as per Master Plan 6.2 -
Road Widening Width 0 0.60
Plot size (as per measurement) 199.5 199.50
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK


[-] Plot Level Checking (Table 3)
   
[-] Common Plot Checks (Table 3b)
Name Total Area Status
Reqd Prop
Common Plot 9.69 21.85 OK


[-] Common Plot Checks (Table 3b)
Name Minimum Area Coverage Area Width Angle Access Status
Reqd Prop Perm Prop Reqd Prop Reqd Prop
Tree Cover (Plantation) - 21.85 0.00 0.00 - 2.30 - 88.19 No Access Provided OK


   
   
[-] Tree Details (Table 3g)
Name Nos Of Trees Status
Reqd Prop
Tree 2 3 OK
   
   
   
   
   


[-] Building Details (Table 4)
   
[-] Building USE/SUBUSE Details Building USE/SUBUSE Details
Building Name Building Use Building SubUse Building Structure
A (RESIDENTIAL) Residential Residential Bldg/Apartment Non-Highrise
   
   
   
[-] Height Details (4a)



[-] Total Height (Table 4a-1)
Building Height Height (From GL) Height (From Street LVL) Status
Perm Prop
A (RESIDENTIAL) 12.55 9.00 9.00 9.00 OK


   
   
[-] Floor Height Check (Table 4a-2)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
A (RESIDENTIAL) Second Floor 2.75 - 3.00 2.75 - 2.89 2.40 - 2.75 OK
First Floor 2.75 - 3.00 2.75 - 2.89 2.40 - 2.75 OK
Ground Floor 2.75 - 3.00 2.75 - 2.89 2.40 - 2.75 OK
Plinth 0.45 - 0.60 - - 0.60 - - 0.60 OK


[-] Parapet Height Check (Table 4a-2.1)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
A (RESIDENTIAL) Terrace Floor - - 1.00 - - 1.00 - - 1.00 OK
   
   
   
[-] Floor Number Check (Table 4a-4)
Building Name No. of Floors No. of Tenements Status
Perm Prop Perm Prop
A (RESIDENTIAL) G + 4 3 - 1 OK

 
   
    [-] Coverage Check (Table 4b)
Permissible Proposed Status
135.66 118.96 OK
70% 61.38%

[-] Individual Coverage Check
Coverage Area Perm. Prop.
  A-1 (RESIDENTIAL) - 118.96
  Total Prop. Coverage Area - 118.96
  Total Coverage Area 135.66 118.96

[-] FAR & Tenement Details (Table 4c-1)
Building No. of Same Bldg Total Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Parking Resi.
A (RESIDENTIAL) 1 356.91 48.86 308.05 308.05 308.05 01
Grand Total : 1 356.91 48.86 308.05 308.05 308.05 01


[-] Buildingwise Floor FAR Details
Floor Name Building Name Total
A (RESIDENTIAL)
Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total Proposed Built Up Area (Sq.mt.) Total FAR Area (Sq.mt.)
Ground Floor 118.97 70.11 118.97 70.11
First Floor 118.97 118.97 118.97 118.97
Second Floor 118.97 118.97 118.97 118.97
Terrace Floor 0.00 0.00 0.00 0.00
Total : 356.91 308.05 356.91 308.05


[-] UnitBUA Table for Building :A (RESIDENTIAL)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN SPLIT A FLAT 244.14 233.43 6 1
TYPICAL - 1& 2 FLOOR PLAN SPLIT A FLAT 0.00 0.00 5 0
SPLIT A FLAT 0.00 0.00 5
Total: - - 244.14 233.43 26 1


[-] Building :A (RESIDENTIAL)
Floor Name Total Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Parking Resi.
Ground Floor 118.97 48.86 70.11 70.11 70.11 01
First Floor 118.97 0.00 118.97 118.97 118.97 00
Second Floor 118.97 0.00 118.97 118.97 118.97 00
Terrace Floor 0.00 0.00 0.00 0.00 0.00 00
Total : 356.91 48.86 308.05 308.05 308.05 01
Total Number of Same Buildings : 1
Total : 356.91 48.86 308.05 308.05 308.05 01
[-] Table 4c-2

  FAR Area
Building FAR Area:308.04
Existing FAR Area :0.00
Perm.
498.75
Prop.
308.04
Status
OK




[-] Margin Checks (Table 5)
   
[-] Plot Margin (Table 5a)
Building / Wing Road Name Front Side Rear Side Side1 Side2 Status
Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop.
A-1 (RESIDENTIAL) ROAD WIDENING AREA(SURRENDERED FREE OF COST) 2.50 2.65 1.50 2.18 0.90 0.90 - 0.90 OK






[-] Inner Building Details (Table 6)
   

No OTS/Duct/VShaft/Balcony/Passage/Lift/Tenements Found.
   


[-] Parking Details (Table 7)
   

NO PARKING CHECK REQUIRED FOR SINGLE DWELLING UNIT. Residential Bldg/Apartment, In Building: A (RESIDENTIAL)
   


[-] Exemption Details (Table 8)
   


Not Required to Check StairCase Number Rule.


[-] Staircase Checks (Table 8a-1)


[-] For Building :A (RESIDENTIAL)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN STAIRCASE 0.900 1.100 0.250 0.250 0.200 0.150 - 10 - - 0.000 OK
TYPICAL - 1& 2 FLOOR PLAN STAIRCASE 0.900 1.100 0.250 0.250 0.200 0.150 - 10 - - 0.000 OK
TERRACE FLOOR PLAN STAIRCASE - 1.100 - 0.250 - 0.000 - 0 - - 2.885 OK

   
   
   
[-] Accessory Use Check (Table 8d)
Accessory Use Name Area Width Depth Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
RWH - - 0.27 - - 0.59 - - 0.59 - - 0.00 OK
ENT.GATE - - 0.50 - - 0.15 - - 3.44 - - 0.00 OK
SOLAR HEATING SYSTEM - - 0.27 - - 0.59 - - 0.59 - - 0.00 OK





[-] Accessory Use No. Checks
Building Name Accessory Use Name No Status
Reqd Perm Prop
A (RESIDENTIAL) Rain Water Harvesting 1 - 1 OK
   
   


[-] Floor Details (Table 9)
   

[-] Building:A (RESIDENTIAL)


[-] Floor:GROUND FLOOR PLAN



All Dimensions and Area of all the Rooms on this Floor are as per the Rules.

[-] Floor:TYPICAL - 1& 2 FLOOR PLAN



All Dimensions and Area of all the Rooms on this Floor are as per the Rules.


   


[-] Summary (Table 10)
   
Name Perm./Reqd. Proposed Status
  Plot Area - 193.80 OK
  Plot Width - 9.50 OK
  Plot Depth - 20.39 OK
  Access Width - 6.20 OK
  Plot Frontage - 9.50 OK
  Coverage Area 135.66 118.96 OK
  FAR Area
Bldg. FAR Area : 308.04
Sanctioned FAR Area :0.00
498.75 308.04 OK





[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Width No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Depth No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Access Width The minimum width of abutting road for any Building shall be with respect to Length of Road {As per Rule No. 34 Table No.6}
Plot Frontage No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
FAR Area (1) In Old Area, for Residential Building on abutting roadwidth 6.10 (20 ft.) to 7.5 mt., the Floor Area Ratio-FAR shall be 2.5 {As per Rule No.39, Table 15 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
(2) For MANGO NAC, Max. 2.5 permissible FAR may be permitted for Residential Use {As per Annexure III}
Consumed FAR (1) In Old Area, for Residential Building on abutting roadwidth 6.10 (20 ft.) to 7.5 mt., the Floor Area Ratio-FAR shall be 2.5 {As per Rule No.39, Table 15 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
(2) For MANGO NAC, Max. 2.5 permissible FAR may be permitted for Residential Use {As per Annexure III}
Common Plot Area In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
Common Plot (1) In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
(2) ;
Tree Number 2-4 Trees shall be required for the Plot area upto 250.0 sq.mt. (As per Rule No. 20.1.6)
Margin Rule For Non-highrise Residential Building upto 10.0 mt. Ht. having Plot Depth 15-21 mt. and Plot width 15-21 mt., Margin required in Front shall be 2.5 mt., Rear 1.5 mt. and Atleast 0.9 mt. shall be provided at one side. {As per Rule No. 36 (Table 8 & 9)}
Building Level
Building Height For old area, on Road width 6.10-7.50 mt., Permissible height shall in no case exceed(1.5 times the width oftheroadonwhichtheplot abuts) + Road widening + the front setback or 16.4 mt. {As per Rule No. 39.1 Table 15}
Floor Height (1) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(2) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(3) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
Parapet Height (1) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(2) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(3) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Floor Number For old area location,on Road width 6.1-7.5 mt. only G+4 floors shall be allowed {As per Rule No. 39.1 Table 15}
StairCase (1) Width of Winding staircase shall be mini. 0.90 mt.,Maximum rise 0.20 mt. & Minimum tread 0.25 mt. & Cabin Height 2.1 mt. {As per Rule No. 83.18}
(2) ; No Rule Defined
(3) No Rule Defined
(4) ; No Rule Defined
Plot / Building Level
Accessory Use (1) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(2) No need to check distance from Building RWH
(3) No need to check distance from Building ENT.GATE
(4) -
(5) No need to check distance from Building SOLAR HEATING SYSTEM
Accessory Use Number Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting