Topic |
Rule |
Plot Level |
Plot Area |
The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
|
Plot Width |
The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
|
Plot Depth |
The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
|
Access Width |
The minimum width of abutting road for Primary/Upper Primary school category shall be 9.0 mt. {As per Rule No. 35.1, Table 7}
|
Plot Frontage |
The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
|
FAR Area |
(1)
For Educational, Institutional and Assembly building above 1000 sq.mt. Plot area, the Floor Area Ratio-FAR shall be 2.25 {As per Rule No. 39.3}
(2)
No Rule Define.
|
Consumed FAR |
(1)
For Educational, Institutional and Assembly building above 1000 sq.mt. Plot area, the Floor Area Ratio-FAR shall be 2.25 {As per Rule No. 39.3}
(2)
No Rule Define.
|
Common Plot Area |
In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
|
Common Plot |
(1)
In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
(2)
;
|
Tree Number |
Mini. 8 Trees shall be required for the Plot area above 1000.0 sq.mt. (As per Rule No. 20.1.6)
|
Margin Rule |
For Educational Building, Margin required in Front shall be 9.0 mt., Rear 6.0 mt. and 6.0 mt. shall be provided on both side. {As per Rule No. 38.2.1}
|
Building Level |
Building Height |
For old area, on Road width 12.20-18.30 mt., Permissible height shall in no case exceed(1.5 times the width oftheroadonwhichtheplot abuts) + Road widening + the front setback or 30.0 mt. {As per Rule No. 39.1 Table 15}
|
Floor Height |
(1)
For Educational Bulding, The height of all rooms shall not be less than 3.3 m measured from the surface of the floor to the lowest point of the ceiling
(2)
For Educational Bulding, The height of all rooms shall not be less than 3.3 m measured from the surface of the floor to the lowest point of the ceiling
(3)
The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
|
Parapet Height |
Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
|
Floor Number |
For old area location,on Road width 12.20-18.30 mt., Maximum Height 30 meter shall be allowed. {As per Rule No. 39.1 Table 15}
|
Passage |
No exit doorway shall be less than 1.00 m. in width. {As per Rule No.43.4.2} ;
|
StairCase |
(1)
Width of Winding staircase shall be mini. 0.90 mt.,Maximum rise 0.20 mt. & Minimum tread 0.25 mt. & Cabin Height 2.1 mt. {As per Rule No. 83.18}
(2)
; No Rule Defined
(3)
No Rule Defined
(4)
; No Rule Defined
|
Plot / Building Level |
Accessory Use |
(1)
The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(2)
No need to check distance from Building RAIN WATER HARVESTING
(3)
No need to check distance from Building ENT.GATE
(4)
-
(5)
No need to check distance from Building EXISTING BUILDING
(6)
-
(7)
No need to check distance from Building SOLAR HEATING SYSTEM
|
Accessory Use Number |
(1)
Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
(2)
In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premise shall not be less than 5 (five) meters i n width in order to allow easy access to fire engine Entrance Gate
|
Building Level (Rooms) |