General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictKODERMA
AuthorityJHUMRITILAIYA NAGAR PARISHAD
Inward_NoJNP/BP/0061/W22/2021
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaOld Area
City Area/TPScheme NoNA
VillageGomo
Taluka25
Architect Details
Architect NameKIRAN KUMARI
License No.JNP/ENG/0001/2019
Architect AddressIDEAL CONSTRUCTION, JHUMRI TELAIYA, KODERMA
Architect EmailIDIDEALCONSTRUCTION78@GMAIL.COM
Architect Mobile No7717750796
Plot Details
Plot Use Residential
Plot SubUse Bungalow/ Dwelling / Non Apartment
PlotNearbyReligiousStructure NA
Plot/SubPlot No171, 170, 1666
NorthRoad Width - 15.24
SouthPlot No. - WIFE OF SRI SACHIDA LOHANI
EastPlot No. - WIFE OF DR. SUNIL KUMAR
WestPlot No. - SRI KAILASH LAL BARNWAL
Owner's Details
NameSMT MANJU DEVI
Address105 BYE PASS ROAD NEAR GANESH LINE HOTEL WARD NO - 22 JHUMRI TELAIYA DIST - KODERMA JHARKHAND
Email IDnehabarnwalprt@gmail.com
Mobile No9304098147
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 138.16
2 Plot area as per Document by Applicant 138.16
3 Area as per Site Visit (Site Visit Report) 138.16
4Area as per Drawing 138.16

Area of Plot Considered : 138.16

[-] Table 2b
Proposal Detail :
UnitMeters
Development Detail :
PlotPLOT
Plot OccupancyResidential
Plot SubUse Bungalow/ Dwelling / Non Apartment
Building StructureNon-Highrise
Building TypeSingle Detached House
Gross Plot Area 138.16
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 138.16
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 126.56
Deductions for Balance Plot Area (from Gross Plot Area)
- Common Plot 11.60
11.60
Balance Plot Area 126.56

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 70.00 % ) 96.71
Proposed Coverage Area ( 43.26 % ) 59.77
Total Prop. Coverage Area ( 43.26 % ) 59.77
Balance coverage area ( 26.74 % ) 36.94
FAR CHECK
Perm. FAR Area ( 2.00 ) 276.32
Total Perm. FAR area 276.32
Residential FAR 136.52
Proposed FAR Area 136.52
Total Proposed FAR Area 136.52
Consumed FAR (Factor) 0.99
Balance FAR Area 139.80
BUA CHECK
Total Proposed BuiltUp Area 179.31


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Up to 50 meter -
Existing Road Width 15.24 15.24
Proposed Road Width as per Master Plan 15.24 -
Road Widening Width 0.1 -
Plot size (as per measurement) 138.16 138.16
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK


[-] Plot Level Checking (Table 3)
   
[-] Common Plot Checks (Table 3b)
Name Total Area Status
Reqd Prop
Common Plot 6.91 11.60 OK


[-] Common Plot Checks (Table 3b)
Name Minimum Area Coverage Area Width Angle Access Status
Reqd Prop Perm Prop Reqd Prop Reqd Prop
Tree Cover (Plantation) - 11.60 0.00 0.00 - 2.06 - 63.85 No Access Provided OK


   
   
[-] Tree Details (Table 3g)
Name Nos Of Trees Status
Reqd Prop
Tree 2 3 OK
   
   
   
   
   


[-] Building Details (Table 4)
   
[-] Building USE/SUBUSE Details Building USE/SUBUSE Details
Building Name Building Use Building SubUse Building Structure
A (RESIDENTIAL) Residential Bungalow/ Dwelling / Non Apartment Non-Highrise
   
   
   
[-] Height Details (4a)



[-] Total Height (Table 4a-1)
Building Height Height (From GL) Height (From Street LVL) Status
Perm Prop
A (RESIDENTIAL) 30.00 9.62 9.62 9.62 OK


   
   
[-] Floor Height Check (Table 4a-2)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
A (RESIDENTIAL) Second Floor 2.75 - 3.20 2.75 - 3.07 2.40 - 2.95 OK
First Floor 2.75 - 3.20 2.75 - 3.07 2.40 - 2.95 OK
Ground Floor 2.75 - 3.20 2.75 - 3.07 2.40 - 2.95 OK
Plinth 0.45 - 0.91 - - 0.91 - - 0.91 OK


[-] Parapet Height Check (Table 4a-2.1)
Building Name Floor Name Height Status
Reqd Perm Prop
A (RESIDENTIAL) Terrace Floor - - 1.07 OK
   
   
   
[-] Floor Number Check (Table 4a-4)
Building Name No. of Floors No. of Tenements Status
Perm Prop Perm Prop
A (RESIDENTIAL) - 3 - 1 OK

 
   
    [-] Coverage Check (Table 4b)
Permissible Proposed Status
96.71 59.77 OK
70% 43.26%

[-] Individual Coverage Check
Coverage Area Perm. Prop.
  A-1 (RESIDENTIAL) - 59.77
  Total Prop. Coverage Area - 59.77
  Total Coverage Area 96.71 59.77

[-] FAR & Tenement Details (Table 4c-1)
Building No. of Same Bldg Total Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Parking Resi.
A (RESIDENTIAL) 1 179.31 42.79 136.52 136.52 136.52 01
Grand Total : 1 179.31 42.79 136.52 136.52 136.52 01


[-] Buildingwise Floor FAR Details
Floor Name Building Name Total
A (RESIDENTIAL)
Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total Proposed Built Up Area (Sq.mt.) Total FAR Area (Sq.mt.)
Ground Floor 59.77 16.98 59.77 16.98
First Floor 59.77 59.77 59.77 59.77
Second Floor 59.77 59.77 59.77 59.77
Terrace Floor 0.00 0.00 0.00 0.00
Total : 179.31 136.52 179.31 136.52


[-] UnitBUA Table for Building :A (RESIDENTIAL)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
SECOND FLOOR PLAN SPLIT A FLAT 0.00 0.00 5 0
FIRST FLOOR PLAN SPLIT A FLAT 0.00 0.00 3 0
GROUND FLOOR PLAN SPLIT A FLAT 82.77 81.17 1 1
Total: - - 82.77 81.17 9 1


[-] Building :A (RESIDENTIAL)
Floor Name Total Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Parking Resi.
Ground Floor 59.77 42.79 16.98 16.98 16.98 01
First Floor 59.77 0.00 59.77 59.77 59.77 00
Second Floor 59.77 0.00 59.77 59.77 59.77 00
Terrace Floor 0.00 0.00 0.00 0.00 0.00 00
Total : 179.31 42.79 136.52 136.52 136.52 01
Total Number of Same Buildings : 1
Total : 179.31 42.79 136.52 136.52 136.52 01
[-] Table 4c-2

  FAR Area
Building FAR Area:136.52
Existing FAR Area :0.00
Perm.
276.32
Prop.
136.52
Status
OK




[-] Margin Checks (Table 5)
   
[-] Plot Margin (Table 5a)
Building / Wing Road Name Front Side Rear Side Side1 Side2 Status
Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop.
A-1 (RESIDENTIAL) 15.24 METER WIDE ROAD 2.50 7.62 1.50 1.83 - 0.00 0.90 1.02 OK






[-] Inner Building Details (Table 6)
   

No OTS/Duct/VShaft/Balcony/Passage/Lift/Tenements Found.
   


[-] Parking Details (Table 7)
   

NO PARKING CHECK REQUIRED FOR SINGLE DWELLING UNIT. Bungalow/ Dwelling / Non Apartment, In Building: A (RESIDENTIAL)
   


[-] Exemption Details (Table 8)
   


Not Required to Check StairCase Number Rule.


[-] Staircase Checks (Table 8a-1)


[-] For Building :A (RESIDENTIAL)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
TERRACE FLOOR PLAN STAIRCASE - 1.067 - 0.254 - 0.000 - 0 - - 2.438 OK
SECOND FLOOR PLAN STAIRCASE 0.900 1.067 0.250 0.254 0.200 0.188 - 13 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.900 1.067 0.250 0.254 0.200 0.188 - 13 - - 0.000 OK
GROUND FLOOR PLAN STAIRCASE 0.900 1.067 0.250 0.254 0.200 0.188 - 13 - - 0.000 OK

   
   
   
[-] Accessory Use Check (Table 8d)
Accessory Use Name Area Width Depth Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
RAIN WATER HARVESTING - - 0.14 - - 0.42 - - 0.42 - - 0.00 OK
SOLAR HEATING SYSTEM - - 0.15 - - 0.43 - - 0.43 - - 0.00 OK





[-] Accessory Use No. Checks
Building Name Accessory Use Name No Status
Reqd Perm Prop
A (RESIDENTIAL) Rain Water Harvesting 1 - 1 OK
   
   


[-] Floor Details (Table 9)
   

[-] Building:A (RESIDENTIAL)


[-] Floor:SECOND FLOOR PLAN

[-] Misc Checks (Table 9a)
Tnmt No. Room Name Area Width Depth Ventilation Status
Reqd Prop Reqd Prop Reqd Prop Reqd Prop
SPLIT A KITCHEN 1.83X2.44 5.00 4.46 1.80 1.83 1.80 2.44 0.45 1.08 Failed

[-] Floor:FIRST FLOOR PLAN

[-] Misc Checks (Table 9a)
Tnmt No. Room Name Area Width Depth Ventilation Status
Reqd Prop Reqd Prop Reqd Prop Reqd Prop
SPLIT A TOILET 2.13X1.24 2.80 2.65 1.20 1.24 1.20 2.13 0.30 0.54 Failed

[-] Floor:GROUND FLOOR PLAN

[-] Misc Checks (Table 9a)
Tnmt No. Room Name Area Width Depth Ventilation Status
Reqd Prop Reqd Prop Reqd Prop Reqd Prop
SPLIT A TOILET 2.13X1.24 2.80 2.65 1.20 1.24 1.20 2.13 0.30 0.54 Failed


   


[-] Summary (Table 10)
   
Name Perm./Reqd. Proposed Status
  Plot Area - 138.16 OK
  Plot Width - 6.71 OK
  Plot Depth - 20.60 OK
  Access Width - 15.24 OK
  Plot Frontage - 6.25 OK
  Coverage Area 96.71 59.77 OK
  FAR Area
Bldg. FAR Area : 136.52
Sanctioned FAR Area :0.00
276.32 136.52 OK





[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Width No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Depth No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Access Width The minimum width of abutting road for any Building shall be with respect to Length of Road {As per Rule No. 34 Table No.6}
Plot Frontage No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
FAR Area (1) In Old Area, for Residential Building on abutting roadwidth 12.20 (40 ft.) to 18.30 mt., the Floor Area Ratio-FAR shall be 2.5 {As per Rule No.39, Table 15}
(2) For Jhumritilaiya Nagar Parishad, Max. 2.0 permissible FAR may be permitted for Residential Use {As per Annexure III}
Consumed FAR (1) In Old Area, for Residential Building on abutting roadwidth 12.20 (40 ft.) to 18.30 mt., the Floor Area Ratio-FAR shall be 2.5 {As per Rule No.39, Table 15}
(2) For Jhumritilaiya Nagar Parishad, Max. 2.0 permissible FAR may be permitted for Residential Use {As per Annexure III}
Common Plot Area In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
Common Plot (1) In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
(2) ;
Tree Number 2-4 Trees shall be required for the Plot area upto 250.0 sq.mt. (As per Rule No. 20.1.6)
Margin Rule For Non-highrise Residential Building upto 10.0 mt. Ht. having Plot Depth 15-21 mt. and Plot width 15-21 mt., Margin required in Front shall be 2.5 mt., Rear 1.5 mt. and Atleast 0.9 mt. shall be provided at one side. {As per Rule No. 36 (Table 8 & 9)}
Building Level
Building Height For old area, on Road width 12.20-18.30 mt., Permissible height shall in no case exceed(1.5 times the width oftheroadonwhichtheplot abuts) + Road widening + the front setback or 30.0 mt. {As per Rule No. 39.1 Table 15}
Floor Height (1) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(2) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(3) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
Parapet Height Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Floor Number For old area location,on Road width 12.20-18.30 mt., Maximum Height 30 meter shall be allowed. {As per Rule No. 39.1 Table 15}
StairCase (1) No Rule Defined
(2) ; No Rule Defined
(3) Width of Winding staircase shall be mini. 0.90 mt.,Maximum rise 0.20 mt. & Minimum tread 0.25 mt. & Cabin Height 2.1 mt. {As per Rule No. 83.18}
(4) ; No Rule Defined
Plot / Building Level
Accessory Use (1) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(2) No need to check distance from Building RAIN WATER HARVESTING
(3) -
(4) No need to check distance from Building SOLAR HEATING SYSTEM
Accessory Use Number Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
Building Level (Rooms)