General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictLOHARDAGA
AuthorityLOHARDAGA NAGAR PARISHAD
Inward_NoLNP/BP/0046/W04/2024
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaOld Area
City Area/TPScheme NoNA
VillageKatmu
Taluka26
Architect Details
Architect NameSUNIL KUMAR
License No.LNP/ENG/0004/2017
Architect AddressBARWATOLI
Architect EmailIDsunil7527@gmail.com
Architect Mobile No7292899641
Plot Details
Plot Use Residential
Plot SubUse Bungalow/ Dwelling / Non Apartment
PlotNearbyReligiousStructure NA
Plot/SubPlot No861
North -
South -
East -
West -
Owner's Details
NameSUMITRA ORAIN
AddressBLOCK COLONY KUTMU
Email IDSunil7527@gmail.com
Mobile No7488248931
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 445.31
2 Plot area as per Document by Applicant 442.84
3 Physical area measured at site 442.84
4 Area as per Site Visit (Site Visit Report) 442.84
5Area as per Drawing 401.13

Area of Plot Considered : 401.13

[-] Table 2b
Proposal Detail :
Unit
Development Detail :
PlotPLOT
Plot OccupancyResidential
Plot SubUse Bungalow/ Dwelling / Non Apartment
Building StructureNon-Highrise
Building TypeSingle Detached House
Gross Plot Area 401.13
Deduction from Gross Plot area
- Surrender Free of Cost 27.16
27.16
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 373.97
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 313.16
Deductions for Balance Plot Area (from Gross Plot Area)
- Surrender Free of Cost 27.16
- Common Plot 60.81
87.97
Balance Plot Area 313.16

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 60.00 % ) 224.38
Proposed Coverage Area ( 27.72 % ) 103.65
Total Prop. Coverage Area ( 27.72 % ) 103.65
Balance coverage area ( 32.28 % ) 120.73
FAR CHECK
Perm. FAR Area ( 1.200 ) 481.36
Total Perm. FAR area 481.36
Residential FAR 204.64
Proposed FAR Area 204.64
Total Proposed FAR Area 204.64
Consumed FAR (Factor) 0.51
Balance FAR Area 276.72
BUA CHECK
Total Proposed BuiltUp Area 205.95


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Up to 50 meter -
Existing Road Width 3.05 3.05
Proposed Road Width as per Master Plan 3.05 -
Road Widening Width 1.52 2.83
Plot size (as per measurement) 442.84 401.13
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK

     Extra Land Area Details
Name Description Unit Reqd Perm Proposed Status
Extra Land Area Details Extra Land Area - - 0.00 OK

     Plot Related Details
Name Description Unit Reqd Perm Proposed Status
PLOT Plot Area Sq.Mt. - - 373.97 OK
Plot Width Mt. - - 17.82 OK
Plot Depth Mt. - - 20.98 OK
Access Width Mt. - - 3.05 OK
Plot Frontage Mt. - - 9.59 OK
Coverage Area Sq.Mt. - 224.38 103.65 OK
FAR Area Sq.Mt. - 481.36 204.64 OK
Consumed FAR Sq.Mt. - 1.20 0.51 OK
Common Plot Checks Common Plot - Total Area Sq.Mt. 18.70 60.81 OK
Common Plot Tree Cover (Plantation) - Minimum Area Sq.Mt. - 60.81 OK
Tree Cover (Plantation) - Coverage Area Sq.Mt. - - OK
Tree Cover (Plantation) - Width Mt. - 6.05 OK
Tree Cover (Plantation) - Angle Degree - 90.00 OK
Tree Cover (Plantation) - Access Mt. - OK
Tree Tree - Nos Of Trees No. 4 5 OK
ABC-1 (123) Front Margin... ROAD WIDENING AREA(SURRENDERED FREE OF COST) Mt. 2.50 - 3.66 OK
Rear Margin Mt. 1.50 - 2.18 OK
Side1 Margin Mt. 1.00 - 1.52 OK
Side2 Margin Mt. 1.00 - 1.80 OK
ABC-1 (123) BldgLine for 3.048 M MAINROAD Access Road Mt. 0.27 5.18 OK
ABC-1 (123) ResvRoad Width Check for... 3.048 M MAINROAD Access Road Mt. 0.27 1.52 OK

     Building Related Details
Name Description Unit Reqd Perm Proposed Status
ABC (123) First Floor - Height Mt. 2.75 - 3.35 OK
First Floor - Clear Height Mt. 2.75 - 3.25 OK
First Floor - Beam Clear Height Mt. 2.40 - 3.10 OK
Ground Floor - Height Mt. 2.75 - 3.35 OK
Ground Floor - Clear Height Mt. 2.75 - 3.25 OK
Ground Floor - Beam Clear Height Mt. 2.40 - 3.10 OK
Plinth - Height Mt. 0.45 - 0.61 OK
Plinth - Clear Height Mt. - - 0.61 OK
Plinth - Beam Clear Height Mt. - - 0.61 OK
ABC (123) Terrace Floor - Height Mt. - - 0.91 OK
Terrace Floor - Clear Height Mt. - - 0.91 OK
Terrace Floor - Beam Clear Height Mt. - - 0.91 OK
ABC (123) No. of Floors No. G + 1 2 OK
No. of Tenements No. - 1 OK
ABC (123) FIRST FLOOR PLAN - BALCONY - Width Mt. 1.20 1.20 OK
GROUND FLOOR PLAN STAIRCASE - Flight Width Mt. 0.750 0.889 OK
STAIRCASE - Tread Width Mt. 0.225 0.254 OK
STAIRCASE - Riser Height Mt. 0.200 0.160 OK
STAIRCASE - Riser No. On Flight No. - 11 OK
STAIRCASE - Cabin Ht. Mt. - - - OK
FIRST FLOOR PLAN STAIRCASE - Flight Width Mt. 0.750 0.889 OK
STAIRCASE - Tread Width Mt. 0.225 0.254 OK
STAIRCASE - Riser Height Mt. 0.200 0.160 OK
STAIRCASE - Riser No. On Flight No. - 11 OK
STAIRCASE - Cabin Ht. Mt. - - - OK
TERRACE FLOOR PLAN STAIRCASE - Flight Width Mt. - 0.889 OK
STAIRCASE - Tread Width Mt. - 0.254 OK
STAIRCASE - Riser Height Mt. - - OK
STAIRCASE - Riser No. On Flight No. - - OK
STAIRCASE - Cabin Ht. Mt. 2.100 - 2.311 OK
SUMP TANK Area Sq.Mt. - - 1.47 OK
Width Mt. - - 1.10 OK
Depth Mt. - - 1.34 OK
Height Mt. - - - OK
RAIN WATER HARVESTING Area Sq.Mt. - - 0.41 OK
Width Mt. - - 0.72 OK
Depth Mt. - - 0.73 OK
Height Mt. - - - OK
ENT.GATE Area Sq.Mt. - - 1.26 OK
Width Mt. - - 0.29 OK
Depth Mt. - - 4.29 OK
Height Mt. - - - OK
ABC (123) Rain Water Harvesting - No No. 1 - 1 OK
   
    All Rooms are as per Rule in Room Checking




[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Width No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Depth No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Access Width The minimum width of abutting road for any Building shall be with respect to Length of Road {As per Rule No. 34 Table No.6}
Plot Frontage No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
FAR Area (1) In Old Area, for Residential Building on abutting roadwidth less than 3.60 mt., the Floor Area Ratio-FAR shall be 1.2 {As per Rule No.39, Table 15, Note i}
(2) For Lohardaga Nagar Parishad Max. 2.0 permissible FAR may be permitted for Residential Use {As per Annexure III}
Consumed FAR (1) In Old Area, for Residential Building on abutting roadwidth less than 3.60 mt., the Floor Area Ratio-FAR shall be 1.2 {As per Rule No.39, Table 15, Note i}
(2) For Lohardaga Nagar Parishad Max. 2.0 permissible FAR may be permitted for Residential Use {As per Annexure III}
Common Plot Area In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
Common Plot (1) In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
(2) ;
Tree Number 4-8 Trees shall be required for the Plot area above 250.0 and upto 1000.0 sq.mt. (As per Rule No. 20.1.6)
Margin Rule For Non-highrise Residential Building upto 10.0 mt. Ht. having Plot Depth 15-21 mt. and Plot width 15-21 mt., Margin required in Front shall be 2.5 mt., Rear 1.5 mt. and 1.0 mt. shall be provided on both side. {As per Rule No. 36 (Table 8 & 9)}
Building Line Check The min. width of Road for length of Road upto 50 mt. shall be 3.6 mt. {As per Rule No. 34 Table No. 6}
ResvRoad Width Check The min. width of Road for length of Road upto 50 mt. shall be 3.6 mt. {As per Rule No. 34 Table No. 6}
Building Level
Floor Height (1) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(2) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(3) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
Parapet Height (1) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(2) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(3) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Floor Number For old area location,on Road width upto 3.6 mt. only G+1 floors shall be allowed {As per Rule No. 39.1 Note 1}
Balcony Projected balcony may be allowed with a widt of 1.2 mt. where the setback is more than 2.5 mt. {As per Rule No. 46.4 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
StairCase (1) Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. {As per Rule No. 83.18}
(2) ; No Rule Defined
(3) Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. & Cabin height 2.1 mt {As per Rule No. 83.18}
(4) ; No Rule Defined
Plot / Building Level
Accessory Use (1) -
(2) No need to check distance from Building SUMP TANK
(3) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(4) No need to check distance from Building RAIN WATER HARVESTING
(5) No need to check distance from Building ENT.GATE
Accessory Use Number Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
Building Level (Rooms)
Kitchen3.66x1.83 Area for Kitchen when store room is provided shall be Mini. 4.5 sq.mt. having side mini. 1.8 mt. {Rule No. 42.3.2}