General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictPALAMU
AuthorityMEDININAGAR MUNICIPAL CORPORATION
Inward_NoMNNP/BP/0214/W06/2022
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaNew Area
City Area/TPScheme NoNA
VillageBaralota Redma
Taluka27
Architect Details
Architect NameCHANDRA SHEKHAR THAKUR
License No.MNNP/ENG/0004/2020
Architect AddressCONSTRUCTION TECHNOLOGY , CHOURASIYA BHAWAN , JAILHATA ,
Architect EmailIDctchandrashekhar@gmail.com
Architect Mobile No9835933379
Plot Details
Plot Use Mixed
Plot SubUse Resi+Comm
PlotNearbyReligiousStructure NA
Plot/SubPlot No1679
North -
South -
East -
West -
Owner's Details
NameLilawati Devi
AddressBaralota
Email IDbrijmohanprada@gmail.com
Mobile No9546463876
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 404.60
2 Plot area as per Document by Applicant 404.60
3 Area as per Site Visit (Site Visit Report) 403.80
4Area as per Drawing 403.43

Area of Plot Considered : 403.43

[-] Table 2b
Proposal Detail :
Unit
Development Detail :
PlotPLOT
Plot OccupancyMixed
Plot SubUse -
Higher Plot Use
Higher Plot Sub UseResi+Comm
Lower Plot Use
Lower Plot Sub Use
Building StructureNon-Highrise
Building TypeSingle Detached House
Gross Plot Area 403.43
Deduction from Gross Plot area
- Surrender Free of Cost 38.19
38.19
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 365.24
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 323.87
Deductions for Balance Plot Area (from Gross Plot Area)
- Surrender Free of Cost 38.19
- Common Plot 41.37
79.56
Balance Plot Area 323.87

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 60.00 % ) 219.14
Proposed Coverage Area ( 40.47 % ) 147.80
Total Prop. Coverage Area ( 40.47 % ) 147.80
Balance coverage area ( 19.53 % ) 71.34
FAR CHECK
Perm. FAR Area ( 2.50 ) 1008.57
Total Perm. FAR area 1008.57
Residential FAR 147.80
Commercial FAR 80.34
Proposed FAR Area 228.15
Total Proposed FAR Area 228.15
Consumed FAR (Factor) 0.57
Balance FAR Area 780.42
BUA CHECK
Total Proposed BuiltUp Area 295.60


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Exceeding 1000 meter -
Existing Road Width 22.4 22.40
Proposed Road Width as per Master Plan 30 -
Road Widening Width 3.8 3.80
Plot size (as per measurement) 403.8 403.43
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK

     Extra Land Area Details
Name Description Unit Reqd Perm Proposed Status
Extra Land Area Details Extra Land Area - - 0.00 OK

     Plot Related Details
Name Description Unit Reqd Perm Proposed Status
PLOT Plot Area Sq.Mt. - - 365.24 OK
Plot Width Mt. - - 10.05 OK
Plot Depth Mt. - - 36.34 OK
Access Width Mt. - - 22.40 OK
Plot Frontage Mt. - - 10.05 OK
Coverage Area Sq.Mt. - 219.14 147.80 OK
FAR Area Sq.Mt. - 1008.57 228.15 OK
Consumed FAR Sq.Mt. - 2.50 0.57 OK
Common Plot Checks Common Plot - Total Area Sq.Mt. 36.52 41.37 OK
Common Plot Tree Cover (Plantation) - Minimum Area Sq.Mt. - 41.37 OK
Tree Cover (Plantation) - Coverage Area Sq.Mt. - - OK
Tree Cover (Plantation) - Width Mt. - 4.21 OK
Tree Cover (Plantation) - Angle Degree - 90.00 OK
Tree Cover (Plantation) - Access Mt. - OK
Tree Tree - Nos Of Trees No. 4 6 OK
Car In Area Sq.Mt. - - 12.50 OK
Four Stack.Car In Area Sq.Mt. - - 37.50 OK
Total Car In Area Sq.Mt. 25.00 - 50.00 OK
Visitor's Car Parking In Area Sq.Mt. - - 12.50 OK
Total Visitor Parking In Area Sq.Mt. 12.50 - 12.50 OK
TwoWheeler In Area Sq.Mt. - - 18.00 OK
Total TwoWheeler In Area Sq.Mt. 4.00 - 18.00 OK
Other Parking In Area Sq.Mt. - - 42.46 OK
DriveWay A (BUILDING) - GROUND FLOOR PLAN - DRIVEWAY - Width No. 3.60 - 3.60 OK
A-1 (BUILDING) Front Margin... ROAD WIDENING AREA(SURRENDERED FREE OF COST) Mt. 7.00 - 7.41 OK
Rear Margin Mt. 4.50 - 4.50 OK
Side1 Margin Mt. 2.00 - 2.00 OK
Side2 Margin Mt. 2.00 - 2.00 OK

     Building Related Details
Name Description Unit Reqd Perm Proposed Status
A (BUILDING) First Floor - Height Mt. 2.75 - 3.00 OK
First Floor - Clear Height Mt. 2.75 - 2.90 OK
First Floor - Beam Clear Height Mt. 2.40 - 2.75 OK
Ground Floor - Height Mt. 2.75 - 3.00 OK
Ground Floor - Clear Height Mt. 2.75 - 2.90 OK
Ground Floor - Beam Clear Height Mt. 2.40 - 2.75 OK
Plinth - Height Mt. 0.45 - 0.60 OK
Plinth - Clear Height Mt. - - 0.60 OK
Plinth - Beam Clear Height Mt. - - 0.60 OK
A (BUILDING) Terrace Floor - Height Mt. - - 1.00 OK
A (BUILDING) No. of Floors No. - 2 OK
No. of Tenements No. - 2 OK
GROUND FLOOR PLAN STAIRCASE - Flight Width Mt. 0.750 1.010 OK
STAIRCASE - Tread Width Mt. 0.225 0.250 OK
STAIRCASE - Riser Height Mt. 0.200 0.150 OK
STAIRCASE - Riser No. On Flight No. - 10 OK
STAIRCASE - Cabin Ht. Mt. - - - OK
FIRST FLOOR PLAN STAIRCASE - Flight Width Mt. 0.750 1.010 OK
STAIRCASE - Tread Width Mt. 0.225 0.250 OK
STAIRCASE - Riser Height Mt. 0.200 0.150 OK
STAIRCASE - Riser No. On Flight No. - 10 OK
STAIRCASE - Cabin Ht. Mt. - - - OK
TERRACE FLOOR PLAN STAIRCASE - Flight Width Mt. - 1.010 OK
STAIRCASE - Tread Width Mt. - 0.250 OK
STAIRCASE - Riser Height Mt. - - OK
STAIRCASE - Riser No. On Flight No. - - OK
STAIRCASE - Cabin Ht. Mt. 2.100 - 2.430 OK
Toilet Area Sq.Mt. - 5.00 0.40 OK
Width Mt. - - 0.48 OK
Depth Mt. - - 0.83 OK
Height Mt. - - - OK
SUMP TANK Area Sq.Mt. - - 0.40 OK
Width Mt. - - 0.48 OK
Depth Mt. - - 0.83 OK
Height Mt. - - - OK
RAIN WATER HARVESTING Area Sq.Mt. - - 0.40 OK
Width Mt. - - 0.48 OK
Depth Mt. - - 0.83 OK
Height Mt. - - - OK
ENT.GATE Area Sq.Mt. - - 0.09 OK
Width Mt. - - 0.11 OK
Depth Mt. - - 0.83 OK
Height Mt. - - - OK
SOLAR HEATING SYSTEM Area Sq.Mt. - - 1.52 OK
Width Mt. - - 1.07 OK
Depth Mt. - - 1.43 OK
Height Mt. - - - OK
A (BUILDING) Rain Water Harvesting - No No. 1 - 1 OK
   
    All Rooms are as per Rule in Room Checking




[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Width No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Depth No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Access Width The minimum width of abutting road for any Building shall be with respect to Length of Road {As per Rule No. 34 Table No.6}
Plot Frontage No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
FAR Area (1) In New Area, for Non-Residential Building on abutting roadwidth 18.30 (60 ft.) to 24.40 mt., the Floor Area Ratio-FAR shall be 3.0 {As per Rule No.39, Table 15}
(2) For Medininagar Nagar Parishad, Max. 2.5 permissible FAR may be permitted for Commercial or Mercantile type Use {As per Annexure III}
Consumed FAR (1) In New Area, for Non-Residential Building on abutting roadwidth 18.30 (60 ft.) to 24.40 mt., the Floor Area Ratio-FAR shall be 3.0 {As per Rule No.39, Table 15}
(2) For Medininagar Nagar Parishad, Max. 2.5 permissible FAR may be permitted for Commercial or Mercantile type Use {As per Annexure III}
Common Plot Area In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
Common Plot (1) In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
(2) ;
Tree Number 4-8 Trees shall be required for the Plot area above 250.0 and upto 1000.0 sq.mt. (As per Rule No. 20.1.6)
DriveWay Rule For Plor area upto 2000 sq.mt., the minimum width or driveways should not be less than 3.60 mt. {As per Rule No. 41.2 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Margin Rule For Non-highrise Commercial Building upto 16.4 mt. Ht. having Plot Depth 33-39 mt. and Plot width 10-15 mt., Margin required in Front shall be 7.0 mt., Rear 4.5 mt. and 2.0 mt. shall be provided on both side. {As per Rule No. 36 Table 10 & 11}
Building Level
Floor Height (1) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(2) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(3) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
Parapet Height Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Floor Number No Rule Defined
StairCase (1) Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. {As per Rule No. 83.18}
(2) ; No Rule Defined
(3) Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. & Cabin height 2.1 mt {As per Rule No. 83.18}
(4) ; No Rule Defined
Plot / Building Level
Accessory Use (1) Common toilet of maximum size of 5 sq.mt shall be taken Free from FAR
(2) No need to check distance from Building Toilet
(3) -
(4) No need to check distance from Building SUMP TANK
(5) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(6) No need to check distance from Building RAIN WATER HARVESTING
(7) No need to check distance from Building ENT.GATE
(8) -
(9) No need to check distance from Building SOLAR HEATING SYSTEM
Accessory Use Number Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
Building Level (Rooms)