No Image Found   

Detail Scrutiny Report

Madhupur Nagar Parishad

Version Number: 1.0.55  
Version Date: 16/10/2020 
Report Generated On: 26-06-2021 
 
[-] Collapse All


General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictDEOGHAR
AuthorityMADHUPUR NAGAR PARISHAD
Inward_NoMNP/BP/0018/W21/2021
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaOld Area
City Area/TPScheme NoNA
VillagePatharchptti
Taluka18
Architect Details
Architect NameVISHAL YADAV
License No.MNP/ENG/0006/2020
Architect AddressDANGAL PARA ROAD, MADHUPUR, DEOGHAR -815353 JHARKHAND
Architect EmailIDvishalyadav0209@gmail.com
Architect Mobile No9122638843
Plot Details
Plot Use Residential
Plot SubUse Bungalow/ Dwelling / Non Apartment
PlotNearbyReligiousStructure NA
Plot/SubPlot No397
NorthPlot No. - VENDORS LAND
SouthRoad Width - 16.2
EastPlot No. - COMMON GALI
WestPlot No. - HOUSE OF SAMYUDDIN
Owner's Details
NameRAKIMA KHATOON
AddressABDUL AZIZ ROAD,PATHARCHAPTI
Email IDrakimakhatoon.mdp@gmail.com
Mobile No9308680225
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 110.06
2 Plot area as per Document by Applicant 110.06
3 Physical area measured at site 110.00
4 Area as per Site Visit (Site Visit Report) 110.00
5Area as per Drawing 109.98

Area of Plot Considered : 109.98

[-] Table 2b
Proposal Detail :
UnitMeters
Development Detail :
PlotPLOT
Plot OccupancyResidential
Plot SubUse Bungalow/ Dwelling / Non Apartment
Building StructureNon-Highrise
Building TypeNA
Gross Plot Area 109.98
Deduction from Gross Plot area
- Surrender Free of Cost 12.60
12.60
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 97.38
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 86.49
Deductions for Balance Plot Area (from Gross Plot Area)
- Surrender Free of Cost 12.60
- Common Plot 10.89
23.49
Balance Plot Area 86.49

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 70.00 % ) 68.17
Proposed Coverage Area ( 63.04 % ) 61.39
Total Prop. Coverage Area ( 63.04 % ) 61.39
Balance coverage area ( 6.96 % ) 6.78
FAR CHECK
Perm. FAR Area ( 1.20 ) 131.98
Total Perm. FAR area 131.98
Residential FAR 122.78
Proposed FAR Area 122.78
Total Proposed FAR Area 122.78
Consumed FAR (Factor) 1.12
Balance FAR Area 9.20
BUA CHECK
Total Proposed BuiltUp Area 122.78


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Exceeding 250 meter and upto 300 meter -
Existing Road Width 2.94 2.94
Proposed Road Width as per Master Plan 16.2 -
Road Widening Width 13.26 1.60
Plot size (as per measurement) 110 109.98
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK


[-] Plot Level Checking (Table 3)
   
[-] Common Plot Checks (Table 3b)
Name Total Area Status
Reqd Prop
Common Plot 4.87 10.89 OK


[-] Common Plot Checks (Table 3b)
Name Minimum Area Coverage Area Width Angle Access Status
Reqd Prop Perm Prop Reqd Prop Reqd Prop
Tree Cover (Plantation) - 10.89 0.00 0.00 - 1.40 - 90.00 No Access Provided OK


   
   
[-] Tree Details (Table 3g)
Name Nos Of Trees Status
Reqd Prop
Tree 2 4 OK
   
   
   
   
   


[-] Building Details (Table 4)
   
[-] Building USE/SUBUSE Details Building USE/SUBUSE Details
Building Name Building Use Building SubUse Building Structure
A (BUILDING) Residential Bungalow/ Dwelling / Non Apartment Non-Highrise
   
   
   
[-] Height Details (4a)



[-] Total Height (Table 4a-1)
Building Height (From GL) Height (From Street LVL) Status
A (BUILDING) 6.00 6.00 OK


   
   
[-] Floor Height Check (Table 4a-2)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
A (BUILDING) First Floor 2.75 - 3.00 2.75 - 2.88 2.40 - 2.75 OK
Ground Floor 2.75 - 3.00 2.75 - 2.88 2.40 - 2.75 OK
Plinth 0.45 - 0.45 - - 0.45 - - 0.45 OK


[-] Parapet Height Check (Table 4a-2.1)
Building Name Floor Name Height Status
Reqd Perm Prop
A (BUILDING) Terrace Floor - - 1.00 OK
   
   
   
[-] Floor Number Check (Table 4a-4)
Building Name No. of Floors No. of Tenements Status
Perm Prop Perm Prop
A (BUILDING) G + 1 2 - 1 OK

 
   
    [-] Coverage Check (Table 4b)
Permissible Proposed Status
68.17 61.39 OK
70% 63.04%

[-] Individual Coverage Check
Coverage Area Perm. Prop.
  A-1 (BUILDING) - 61.39
  Total Prop. Coverage Area - 61.39
  Total Coverage Area 68.17 61.39

[-] FAR & Tenement Details (Table 4c-1)
Building No. of Same Bldg Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Resi.
A (BUILDING) 1 122.78 122.78 122.78 122.78 01
Grand Total : 1 122.78 122.78 122.78 122.78 01


[-] Buildingwise Floor FAR Details
Floor Name Building Name Total
A (BUILDING)
Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total Proposed Built Up Area (Sq.mt.) Total FAR Area (Sq.mt.)
Ground Floor 61.39 61.39 61.39 61.39
First Floor 61.39 61.39 61.39 61.39
Terrace Floor 0.00 0.00 0.00 0.00
Total : 122.78 122.78 122.78 122.78


[-] UnitBUA Table for Building :A (BUILDING)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN SPLIT A FLAT 94.06 93.79 7 1
FIRST FLOOR PLAN SPLIT A FLAT 0.00 0.00 6 0
Total: - - 94.06 93.79 13 1


[-] Building :A (BUILDING)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Resi.
Ground Floor 61.39 61.39 61.39 61.39 01
First Floor 61.39 61.39 61.39 61.39 00
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 122.78 122.78 122.78 122.78 01
Total Number of Same Buildings : 1
Total : 122.78 122.78 122.78 122.78 01
[-] Table 4c-2

  FAR Area
Building FAR Area:122.78
Existing FAR Area :0.00
Perm.
131.98
Prop.
122.78
Status
OK




[-] Margin Checks (Table 5)
   
[-] Plot Margin (Table 5a)
Building / Wing Road Name Front Side Rear Side Side1 Side2 Status
Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop.
A-1 (BUILDING) ROAD WIDENING AREA(SURRENDERED FREE OF COST) 2.00 2.00 1.50 1.50 - 0.00 0.90 0.95 OK


[-] BldgLine Margin (Table 5a-1)
Building/Wing Front Side Reqd. Prop. Main Road Name ResvRoad Name Reqd. Width Prop. Width Status
A-1 (BUILDING) BldgLine for 2.94M WIDE ROAD 1.58 3.60 2.94M WIDE ROAD ROAD WIDENING AREA(SURRENDERED FREE OF COST) 1.58 1.60 Ok





[-] Inner Building Details (Table 6)
   

No OTS/Duct/VShaft/Balcony/Passage/Lift/Tenements Found.
   


[-] Parking Details (Table 7)
   

NO PARKING CHECK REQUIRED FOR SINGLE DWELLING UNIT. Bungalow/ Dwelling / Non Apartment, In Building: A (BUILDING)
   


[-] Exemption Details (Table 8)
   


Not Required to Check StairCase Number Rule.


[-] Staircase Checks (Table 8a-1)


[-] For Building :A (BUILDING)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN STAIRCASE 0.750 0.850 0.225 0.250 0.200 0.167 - 9 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.750 0.850 0.225 0.250 0.200 0.167 - 9 - - 0.000 OK
TERRACE FLOOR PLAN STAIRCASE - 0.850 - 0.250 - 0.000 - 0 2.100 - 2.550 OK

   
   
   
[-] Accessory Use Check (Table 8d)
Accessory Use Name Area Width Depth Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
Toilet - 5.00 0.84 - - 0.75 - - 1.12 - - 0.00 OK
SUMP TANK - - 1.02 - - 0.74 - - 1.38 - - 0.00 OK
RAIN WATER HARVESTING - - 0.95 - - 0.81 - - 1.18 - - 0.00 OK
ENT.GATE - - 1.30 - - 0.42 - - 3.13 - - 0.00 OK
SOLAR HEATING SYSTEM - - 0.75 - - 0.75 - - 1.00 - - 0.00 OK





[-] Accessory Use No. Checks
Building Name Accessory Use Name No Status
Reqd Perm Prop
A (BUILDING) Rain Water Harvesting 1 - 1 OK
   
   


[-] Floor Details (Table 9)
   

[-] Building:A (BUILDING)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:FIRST FLOOR PLAN



All Dimensions and Area of all the Rooms on this Floor are as per the Rules.


   


[-] Summary (Table 10)
   
Name Perm./Reqd. Proposed Status
  Plot Area - 97.38 OK
  Plot Width - 7.88 OK
  Plot Depth - 12.36 OK
  Access Width - 2.94 OK
  Plot Frontage - 7.88 OK
  Coverage Area 68.17 61.39 OK
  FAR Area
Bldg. FAR Area : 122.78
Sanctioned FAR Area :0.00
131.98 122.78 OK





[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Width No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Depth No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Access Width The minimum width of abutting road for any Building shall be with respect to Length of Road {As per Rule No. 34 Table No.6}
Plot Frontage No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
FAR Area (1) In Old Area, for Residential Building on abutting roadwidth less than 3.60 mt., the Floor Area Ratio-FAR shall be 1.2 {As per Rule No.39, Table 15, Note i}
(2) For Madhupur Nagar Parishad, Max. 2.0 permissible FAR may be permitted for Residential Use {As per Annexure III}
Consumed FAR (1) In Old Area, for Residential Building on abutting roadwidth less than 3.60 mt., the Floor Area Ratio-FAR shall be 1.2 {As per Rule No.39, Table 15, Note i}
(2) For Madhupur Nagar Parishad, Max. 2.0 permissible FAR may be permitted for Residential Use {As per Annexure III}
Common Plot Area In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
Common Plot (1) In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
(2) ;
Tree Number 2-4 Trees shall be required for the Plot area upto 250.0 sq.mt. (As per Rule No. 20.1.6)
Margin Rule For Non-highrise Residential Building upto 10.0 mt. Ht. having Plot Depth 10-15 mt. and Plot width 10-15 mt., Margin required in Front shall be 2.0 mt., Rear 1.5 mt. and Atleast 0.9 mt. shall be provided at one side. {As per Rule No. 36 (Table 8 & 9)}
Building Line Check The min. width of Road for length of Road Exceeding 100 mt. and upto 300 mt. shall be 6.1 mt. {As per Rule No. 34 Table No. 6 and as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
ResvRoad Width Check The min. width of Road for length of Road Exceeding 100 mt. and upto 300 mt. shall be 6.1 mt. {As per Rule No. 34 Table No. 6 and as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Building Level
Floor Height (1) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(2) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(3) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
Parapet Height Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Floor Number For old area location,on Road width upto 3.6 mt. only G+1 floors shall be allowed {As per Rule No. 39.1 Note 1}
StairCase (1) Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. {As per Rule No. 83.18}
(2) ; No Rule Defined
(3) Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. & Cabin height 2.1 mt {As per Rule No. 83.18}
(4) ; No Rule Defined
Plot / Building Level
Accessory Use (1) Common toilet of maximum size of 5 sq.mt shall be taken Free from FAR
(2) No need to check distance from Building Toilet
(3) -
(4) No need to check distance from Building SUMP TANK
(5) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(6) No need to check distance from Building RAIN WATER HARVESTING
(7) No need to check distance from Building ENT.GATE
(8) -
(9) No need to check distance from Building SOLAR HEATING SYSTEM
Accessory Use Number Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
Building Level (Rooms)