Topic |
Rule |
Plot Level |
Plot Area
|
The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
|
Plot Width
|
The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
|
Plot Depth
|
The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
|
Access Width
|
The minimum width of abutting road for Primary/Upper Primary school category shall be 9.0 mt. {As per Rule No. 35.1, Table 7}
|
Plot Frontage
|
The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
|
FAR Area
|
(1)
For Educational, Institutional and Assembly building above 1000 sq.mt. Plot area, the Floor Area Ratio-FAR shall be 2.25 {As per Rule No. 39.3}
(2)
No Rule Define.
|
Consumed FAR
|
(1)
For Educational, Institutional and Assembly building above 1000 sq.mt. Plot area, the Floor Area Ratio-FAR shall be 2.25 {As per Rule No. 39.3}
(2)
No Rule Define.
|
Common Plot Area
|
In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
|
Common Plot
|
(1)
In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
(2)
;
|
Tree Number
|
Mini. 8 Trees shall be required for the Plot area above 1000.0 sq.mt. (As per Rule No. 20.1.6)
|
Margin Rule
|
For Educational Building, Margin required in Front shall be 9.0 mt., Rear 6.0 mt. and 6.0 mt. shall be provided on both side. {As per Rule No. 38.2.1}
|
Building Level |
Building Height
|
For old area, on Road width 9.10-12.20 mt., Permissible height shall in no case exceed(1.5 times the width oftheroadonwhichtheplot abuts) + Road widening + the front setback or 23.10 mt. {As per Rule No. 39.1 Table 15}
|
Floor Height
|
(1)
For Educational Bulding, The height of all rooms shall not be less than 3.3 m measured from the surface of the floor to the lowest point of the ceiling
(2)
For Educational Bulding, The height of all rooms shall not be less than 3.3 m measured from the surface of the floor to the lowest point of the ceiling
|
Parapet Height
|
Parapet walls and handrails provided on the edges of roof terraces, balcony, verandah, etc shall not be less than 1.0 m and not more than 1.2 m in height from the finished floor level {As per Rule No. 42.5}
|
Floor Number
|
For old area location,on Road width 9.1-12.20 mt. only G+6 floors shall be allowed {As per Rule No. 39.1 Table 15}
|
Passage
|
No exit doorway shall be less than 1.00 m. in width. {As per Rule No.43.4.2} ;
|
Lift Count
|
(1)
The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
(2)
For Non-Residential Building, Minimum number of lifts to be 2 for all non-residential building above ground + 2 and the minimum capacity shall be 6 persons per floor. {As per Rule No. 49.2.3 and as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
|
Lift
|
(1)
The area of lift well shall not be counted for F.A.R calculation)
(2)
The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
(3)
-
|
StairCase
|
(1)
Width of Winding staircase shall be mini. 0.90 mt.,Maximum rise 0.20 mt. & Minimum tread 0.25 mt. & Cabin Height 2.1 mt. {As per Rule No. 83.18}
(2)
; No Rule Defined
(3)
No Rule Defined
(4)
; No Rule Defined
|
Plot / Building Level |
Accessory Use
|
(1)
The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(2)
No need to check distance from Building RAIN WATER HARVESTING
(3)
No need to check distance from Building ENT.GATE
|
Accessory Use Number
|
(1)
Provision of rainwater harvesting shall be mandatory for 300 sqm. and above size of plots-The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area Rain Water Harvesting
(2)
In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premise shall not be less than 5 (five) meters i n width in order to allow easy access to fire engine Entrance Gate
|
Building Level (Rooms) |
Room
|
No Rule Defined |