-
No Image Found

Failed List Report

Dhanbad Municipal Corporation

Version Number: 1.0.31
Version Date: 30/06/2018
Report Generated On: 18-01-2019

[-] Collapse All


General Details
Region JHARKHAND URBAN LOCAL BODIES
District DHANBAD
Authority DHANBAD MUNICIPAL CORPORATION
Inward_No DMC/BP/0003/W22/2019
Application Type General Proposal
Project Type Building Permission
Nature of Development New
Location of Development Area Old Area
City Area/TPScheme No NA
Village Bhelatand
Taluka 15
Architect Details
Architect Name PARTHA - PAL
License No. DMC/ENG/0021/2016
Architect Address LIG-283, HOUSING COLONY, DHANBAD
Architect EmailID palpartha078@gmail.com
Architect Mobile No 9835129422
Plot Details
Plot Use Residential
Plot SubUse Bungalow/ Dwelling / Non Apartment
PlotNearbyReligiousStructure NA
Plot/SubPlot No 65 ( Old ) , 103 ( New )
North Road Width - 4.88
South Plot No. - NEEJ
East Plot No. - NEEJ
West Plot No. - PLOT NO.- 65 KA ANSH
Owner's Details
Name SMT. MANJU SHARMA
Address PANI TANKI, DIAMOND CROSSING DHANBAD.
Email ID anand23061985@gmail.com
Mobile No 7654704036
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 212.47
2 Plot area as per Document by Applicant 212.15
3 Physical area measured at site 212.15
4 Area as per Site Visit (Site Visit Report) 212.15
5 Area as per Drawing 212.00

Area of Plot Considered : 212.00

[-] Table 2b
Proposal Detail :
Unit Meters
Development Detail :
Plot PLOT
Plot Occupancy Residential
Plot SubUse Bungalow/ Dwelling / Non Apartment
Building Structure Non-Highrise
Building Type Single Detached House
Gross Plot Area 212.00
Deduction from Gross Plot area
- Surrender Free of Cost 12.64
12.64
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 199.36
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 168.50
Deductions for Balance Plot Area (from Gross Plot Area)
- Surrender Free of Cost 12.64
- Common Plot 30.86
43.50
Balance Plot Area 168.50

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 70.00 % ) 139.55
Proposed Coverage Area ( 57.56 % ) 114.75
Total Prop. Coverage Area ( 57.56 % ) 114.75
Balance coverage area ( 12.44 % ) 24.80
FAR CHECK
Perm. FAR Area ( 1.80 ) 381.60
Total Perm. FAR area 381.60
Residential FAR 229.49
Proposed FAR Area 229.49
Total Proposed FAR Area 229.49
Consumed FAR (Factor) 1.08
Balance FAR Area 152.11
BUA CHECK
Total Proposed BuiltUp Area 229.50


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Up to 50 meter -
Existing Road Width 4.88 4.88
Proposed Road Width as per Master Plan 3.66 -
Road Widening Width 0 0.91
Plot size (as per measurement) 212.15 212.00





[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use
Plot Width No rule provided for Min. Plot size for proposed Use
Plot Depth No rule provided for Min. Plot size for proposed Use
Access Width The minimum width of abutting road for any Building shall be with respect to Length of Road {As per Rule No. 34 Table No.6}
Plot Frontage No rule provided for Min. Plot size for proposed Use
FAR Area (1) In Old Area, for Residential Building on abutting roadwidth 4.80 (16 ft.) to 6.10 mt., the Floor Area Ratio-FAR shall be 1.8 {As per Rule No.39, Table 15}
(2) For Dhanbad Municipal Corporation, Max. 2.5 permissible FAR may be permitted for Residential Use {As per Annexure III}
Consumed FAR (1) In Old Area, for Residential Building on abutting roadwidth 4.80 (16 ft.) to 6.10 mt., the Floor Area Ratio-FAR shall be 1.8 {As per Rule No.39, Table 15}
(2) For Dhanbad Municipal Corporation, Max. 2.5 permissible FAR may be permitted for Residential Use {As per Annexure III}
Common Plot Area In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
Common Plot (1) In every building area, at least 5% of the land shall be covered by plantation (tree cover). {As per Rule No.33}
(2) ;
Tree Number 2-4 Trees shall be required for the Plot area upto 250.0 sq.mt. (As per Rule No. 20.1.6)
Margin Rule For Non-highrise Residential Building upto 10.0 mt. Ht. having Plot Depth 10-15 mt. and Plot width 10-15 mt., Margin required in Front shall be 2.0 mt., Rear 1.5 mt. and 0.9 mt. shall be provided on both side. {As per Rule No. 36 (Table 8 & 9)}
Building Level
Building Height For old area, on Road width 4.8-6.10 mt., Permissible height shall in no case exceed(1.5 times the width oftheroadonwhichtheplot abuts) + Road widening + the front setback or 10.0 mt. {As per Rule No. 39.1 Table 15}
Floor Height (1) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(2) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(3) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
Parapet Height Parapet walls and handrails provided on the edges of roof terraces, balcony, verandah, etc shall not be less than 1.0 m and not more than 1.2 m in height from the finished floor level {As per Rule No. 42.5}
Floor Number For old area location,on Road width 4.8-6.1 mt. only G+2 floors shall be allowed {As per Rule No. 39.1 Table 15}
StairCase (1) Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. {As per Rule No. 83.18}
(2) ; No Rule Defined
(3) Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. & Cabin height 2.1 mt {As per Rule No. 83.18}
(4) ; No Rule Defined
Plot / Building Level
Accessory Use (1) -
(2) No need to check distance from Building SUMP TANK
(3) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(4) No need to check distance from Building RAIN WATER HARVESTING
(5) No need to check distance from Building ENT.GATE
Building Level (Rooms)