Topic |
Rule |
Plot Level |
Plot Area |
No rule provided for Min. Plot size for proposed Use
|
Plot Width |
No rule provided for Min. Plot size for proposed Use
|
Plot Depth |
No rule provided for Min. Plot size for proposed Use
|
Access Width |
The minimum width of abutting road for Institutional, administrative, assembly, industrial and other Nonresidential and commercial activities shall be 9.0 mt.{As per Rule no. 34.5 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
|
Plot Frontage |
No rule provided for Min. Plot size for proposed Use
|
FAR Area |
(1)
For Industrial buildings non-polluting and household, the Floor Area Ratio-FAR shall be 2.0 {As per Rule No. 39.5}
(2)
0.0
|
Consumed FAR |
(1)
For Industrial buildings non-polluting and household, the Floor Area Ratio-FAR shall be 2.0 {As per Rule No. 39.5}
(2)
0.0
|
Common Plot Area |
In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
|
Common Plot |
(1)
In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
(2)
;
|
Tree Number |
Mini. 8 Trees shall be required for the Plot area above 1000.0 sq.mt. (As per Rule No. 20.1.6)
|
Margin Rule |
(1)
For Industrial Building having plotarea 1000-5000 sq.mt., Margin required in Front shall be 10.0 mt., Rear 6.0 mt. and 6.0 mt. shall be provided on both side. {As per Rule No. 36 Table 12}
(2)
For Non-highrise Residential Building upto 10.0 mt. Ht. having Plot Depth 39-45 mt. and Plot width 27-33 mt., Margin required in Front shall be 4.0 mt., Rear 4.0 mt. and 1.5 mt. shall be provided on both side. {As per Rule No. 36 (Table 8 & 9)}
|
PWork to PWork Margin |
Reqd Building to Building margin shall be 6 mt. or 1.5 times side setback required for the taller block whichever is high {As per Rule No. 38.1}
|
Building Level |
Building Height |
For new area, on Road width 12.20-18.30 mt., Permissible height shall in no case exceed(1.5 times the width oftheroadonwhichtheplot abuts) + Road widening + the front setback or 30.0 mt. {As per Rule No. 39.1 Table 16}
|
Floor Height |
(1)
No rule found for Mini. reqd Floor height
(2)
The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
(3)
The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(4)
The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
|
Floor Number |
No Rule Defined
|
StairCase |
(1)
Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. {As per Rule No. 83.18}
(2)
; No Rule Defined
|
Plot / Building Level |
Accessory Use |
(1)
The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(2)
No need to check distance from Building RAIN WATER HARVESTING
(3)
No need to check distance from Building ENT.GATE
|
Accessory Use Number |
(1)
Provision of rainwater harvesting shall be mandatory for 300 sqm. and above size of plots-The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area Rain Water Harvesting
(2)
In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premise shall not be less than 5 (five) meters i n width in order to allow easy access to fire engine Entrance Gate
|
Building Level (Rooms) |