-
No Image Found   

Detail Scrutiny Report

JHARKHAND INDUSTRIAL AREA DEVELOPMENT AUTHORITY

Version Number: 1.0.70  
Version Date: 16/10/2020 
Report Generated On: 06-06-2024 
 
[-] Collapse All


General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictRANCHI
AuthorityJHARKHAND INDUSTRIAL AREA DEVELOPMENT AUTHORITY
Inward_NoJIADA/BP/0015/2022/ALT2
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentAddition or Alteration
Location of Development AreaNew Area
City Area/TPScheme NoNA
VillageHathiadih and Bhatia
Taluka0
Layout Sanction Date10/2/2023
Architect Details
Architect NameNikhil Jain
License No.JIADA/ARC/0001/2018
Architect AddressBothra Bhawan, Opposite Indra Place, Main Road, Hinoo
Architect EmailIDbdpranchi@gmail.com
Architect Mobile No8087667001
Plot Details
Plot Use Medical
Plot SubUse Hospital
PlotNearbyReligiousStructure NA
Plot/SubPlot NoIndustrial Plot No. IT-3 & IT-5; Survey Plot No. 354P
North -
South -
East -
West -
Owner's Details
NamePADMABATI DEVI MULTISPECIALITY HOSPITAL PVT. LTD. REPRESENTED BY DIRECTOR MR NISHIT BEHERA
AddressIT - 3 & IT - 5 INDUSTRIAL AREA NEAR PHASE - 7 ADITYAPUR INDUSTRIAL AREA, SARAIKELA - KHARSAWAN, JHARKHAND
Email IDsamrat.roy@rsbglobal.com
Mobile No8420065456
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 24301.37
2 Plot area as per Document by Applicant 24301.37
3 Physical area measured at site 24301.37
4 Area as per Site Visit (Site Visit Report) 24301.37
5Area as per Drawing 24300.64

Area of Plot Considered : 24300.64

[-] Table 2b
Proposal Detail :
UnitMeters
Development Detail :
PlotPLOT
Plot OccupancyMedical
Plot SubUse Hospital
Building StructureMultistoried
Building TypeSingle Detached House
Gross Plot Area 24300.64
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 24300.64
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 21240.60
Deductions for Balance Plot Area (from Gross Plot Area)
- Common Plot 3060.04
3060.04
Balance Plot Area 21240.60

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 50.00 % ) 12150.32
Proposed Coverage Area ( 42.70 % ) 10377.53
Total Prop. Coverage Area ( 42.7 % ) 10377.53
Balance coverage area ( 7.30 % ) 1772.79
FAR CHECK
Perm. FAR Area ( 3.000 ) 72901.92
Total Perm. FAR area 72901.92
Special FAR 71885.27
Proposed FAR Area 72128.09
Total Proposed FAR Area 72128.09
Consumed FAR (Factor) 2.97
Balance FAR Area 773.83
BUA CHECK
Total Proposed BuiltUp Area 97391.27


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Up to 50 meter -
Existing Road Width 25 25.00
Proposed Road Width as per Master Plan 0 -
Road Widening Width 0 -
Plot size (as per measurement) 24301.37 24300.64
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK


[-] Plot Level Checking (Table 3)
   
[-] Common Plot Checks (Table 3b)
Name Total Area Status
Reqd Prop
Common Plot 2430.06 3060.04 OK


[-] Common Plot Checks (Table 3b)
Name Minimum Area Access Status
Reqd Prop
Normal Open Space - 113.99 No Access Provided OK
Normal Open Space - 138.35 No Access Provided OK
Normal Open Space - 169.49 No Access Provided OK
Normal Open Space - 225.42 No Access Provided OK
Normal Open Space - 940.96 No Access Provided OK
Normal Open Space - 1471.83 No Access Provided OK


   
   
[-] Tree Details (Table 3g)
Name Nos Of Trees Status
Reqd Prop
Tree 8 12 OK
   
   
   
   
   
     
   


[-] Building Details (Table 4)
   
[-] Building USE/SUBUSE Details Building USE/SUBUSE Details
Building Name Building Use Building SubUse Building Structure No Of Beds
A (HOSPITAL) Medical Hospital Multistoried 10
   
   
   
[-] Height Details (4a)



[-] Total Height (Table 4a-1)
Building Height (From GL) Height (From Street LVL) Status
A (HOSPITAL) 44.40 42.90 OK


   
   
[-] Floor Height Check (Table 4a-2)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
A (HOSPITAL) Ninth Floor 2.75 - 3.75 2.75 - 3.60 2.40 - 3.47 OK
Eighth Floor 2.75 - 3.75 2.75 - 3.60 2.40 - 3.47 OK
Seventh Floor 2.75 - 3.75 2.75 - 3.60 2.40 - 3.47 OK
Sixth Floor 2.75 - 3.75 2.75 - 3.60 2.40 - 3.47 OK
Fifth Floor 2.75 - 3.90 2.75 - 3.75 2.40 - 3.62 OK
Fourth Floor 2.75 - 3.90 2.75 - 3.75 2.40 - 3.62 OK
Third Floor 2.75 - 4.80 2.75 - 4.65 2.40 - 4.52 OK
Second Floor 2.75 - 3.90 2.75 - 3.75 2.40 - 3.62 OK
First Floor 2.75 - 3.90 2.75 - 3.75 2.40 - 3.62 OK
Upper Ground Floor 2.75 - 3.90 2.75 - 3.75 2.40 - 3.62 OK
Lower Ground Floor 2.75 - 5.10 2.75 - 4.95 2.40 - 4.82 OK
Basement Floor 2.40 - 5.10 2.40 - 4.95 2.10 - 4.82 OK


[-] Parapet Height Check (Table 4a-2.1)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
A (HOSPITAL) Terrace Floor - - 1.20 - - 1.20 - - 1.20 OK
   
   
[-] Basement Floor Check (Table 4a-3)
Building Name Floor Name Height of Basement Floor above GL Area Ventilation Area Status
Reqd Perm Prop Perm Prop Reqd Prop
A (HOSPITAL) Basement Floor - - 1.20 - 10955.27 - 333.85 OK


[-] Basement Floor Area Check
Building Name Area Status
Perm Prop
A (HOSPITAL) - 10955.27
Total - 10955.27 OK

1 [-] Basement Margin Check
Building / Wing Road Name Front Side Rear Side Side1 Side2 Status
Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop.
  A-1 (HOSPITAL)   25.0 M ROAD 2.00 26.05 2.00 27.42 2.00 10.85 2.00 10.79 OK

    >
   
   
[-] Floor Number Check (Table 4a-4)
Building Name No. of Floors No. of Tenements Status
Perm Prop Perm Prop
A (HOSPITAL) - 11 - 13 OK


[-] Basement Floor Number Check
Building Name No. of Basement Floor Status
Perm Prop
A (HOSPITAL) 2 1 OK
 
   
    [-] Coverage Check (Table 4b)
Permissible Proposed Status
12150.32 10377.53 OK
50% 42.7%

[-] Individual Coverage Check
Coverage Area Perm. Prop.
  A-1 (HOSPITAL) - 10377.53
  Total Prop. Coverage Area - 10377.53
  Total Coverage Area 12150.32 10377.53

[-] FAR & Tenement Details (Table 4c-1)
Building No. of Same Bldg Gross Built Up Area (Sq.mt.) Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Existing Built Up Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Existing FAR Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Add Area In FAR (Sq.mt.) Add Area In Existing FAR (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Cutout StairCase Lift Accessory Use Ramp Parking Medical Stair Stair
A (HOSPITAL) 1 99631.48 2240.21 97391.27 84650.41 12625.98 1940.08 1506.14 6746.25 2222.61 12568.82 68821.69 3063.57 127.93 63.63 72128.08 72128.08 13
Grand Total : 1 99631.48 2240.21 97391.27 84650.41 12625.98 1940.08 1506.14 6746.25 2222.61 12568.82 68821.69 3063.57 127.93 63.63 72128.08 72128.08 13


[-] Buildingwise Floor FAR Details
Floor Name Building Name Total
A (HOSPITAL)
Proposed Built Up Area (Sq.mt.) Existing Built up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Existing FAR Area (Sq.mt.) Total Proposed Built Up Area (Sq.mt.) Total Existing Built up Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Existing FAR Area (Sq.mt.)
Basement Floor 10955.27 0.00 1832.67 0.00 10955.27 0.00 1832.67 0.00
Lower Ground Floor 1670.71 8725.62 1473.72 3774.65 1670.71 8725.62 1473.72 3774.65
Upper Ground Floor 0.00 7464.41 0.00 6034.34 0.00 7464.41 0.00 6034.34
First Floor 0.00 6928.81 0.00 5907.26 0.00 6928.81 0.00 5907.26
Second Floor 0.00 7697.86 0.00 6674.21 0.00 7697.86 0.00 6674.21
Third Floor 0.00 7818.80 0.00 6978.04 0.00 7818.80 0.00 6978.04
Fourth Floor 0.00 7698.70 0.00 6151.30 0.00 7698.70 0.00 6151.30
Fifth Floor 0.00 7718.68 0.00 6767.91 0.00 7718.68 0.00 6767.91
Sixth Floor 0.00 7648.51 0.00 6656.06 0.00 7648.51 0.00 6656.06
Seventh Floor 0.00 7648.51 0.00 6656.06 0.00 7648.51 0.00 6656.06
Eighth Floor 0.00 7648.32 0.00 6695.27 0.00 7648.32 0.00 6695.27
Ninth Floor 0.00 7652.19 0.00 6526.59 0.00 7652.19 0.00 6526.59
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total : 12625.98 84650.41 3306.39 68821.69 12625.98 84650.41 3306.39 68821.69


[-] UnitBUA Table for Building :A (HOSPITAL)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type Entity Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
FIRST FLOOR PLAN FIRST OTHER Existing 6404.85 6024.92 176 1
SECOND FLOOR PLAN SECOND OTHER Existing 7261.77 6883.36 177 1
THIRD FLOOR PLAN THIRD OTHER Existing 7501.81 7109.68 140 1
FOURTH FLOOR PLAN FOURTH OTHER Existing 6628.16 6268.46 159 1
FIFTH FLOOR PLAN FIFTH OTHER Existing 7358.69 7083.29 29 1
TYPICAL - 6& 7 FLOOR PLAN SIXTH OTHER Existing 7346.51 6903.40 269 2
EIGHTH FLOOR PLAN 8TH FLOOR OTHER Existing 7313.22 6897.25 289 1
NINTH FLOOR PLAN 9TH FLOOR OTHER Existing 7317.09 6901.12 285 1
BASEMENT FLOOR PLAN LOWER GROUND OTHER Proposed 1704.70 1539.35 48 1
LOWER GROUND FLOOR PLAN UPPER 1 OTHER Proposed 1663.39 1582.83 50 2
UPPER GROUND OTHER Existing 4079.47 3902.27 34
UPPER GROUND FLOOR PLAN G GROUND OTHER Existing 7207.38 6859.85 100 1
Total: - - - 79133.54 74859.18 2025 13


[-] Building :A (HOSPITAL)
Floor Name Gross Builtup Area Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Existing Built Up Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Existing FAR Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Add Area In FAR (Sq.mt.) Add Area In Existing FAR (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Cutout StairCase Lift Accessory Use Ramp Parking Medical Stair Stair
Basement Floor 11281.35 326.08 10955.27 0.00 10955.27 161.86 142.95 0.00 0.00 8538.50 0.00 1704.74 127.93 0.00 1832.67 1832.67 01
Lower Ground Floor 10530.79 19.58 10511.21 8725.62 1670.71 161.86 0.00 963.84 106.82 4030.32 3774.65 1358.84 0.00 63.63 5248.37 5248.37 02
Upper Ground Floor 7732.61 268.20 7464.41 7464.41 0.00 164.11 144.21 926.73 195.02 0.00 6034.34 0.00 0.00 0.00 6034.34 6034.34 01
First Floor 7708.08 779.27 6928.81 6928.81 0.00 161.43 135.41 513.04 211.67 0.00 5907.26 0.00 0.00 0.00 5907.26 5907.26 01
Second Floor 7706.15 8.29 7697.86 7697.86 0.00 161.43 135.43 513.16 213.63 0.00 6674.21 0.00 0.00 0.00 6674.21 6674.21 01
Third Floor 8415.75 596.95 7818.80 7818.80 0.00 161.43 135.42 330.27 213.64 0.00 6978.04 0.00 0.00 0.00 6978.04 6978.04 01
Fourth Floor 7706.15 7.45 7698.70 7698.70 0.00 161.43 135.43 1036.91 213.63 0.00 6151.30 0.00 0.00 0.00 6151.30 6151.30 01
Fifth Floor 7725.98 7.30 7718.68 7718.68 0.00 161.45 135.55 440.13 213.64 0.00 6767.91 0.00 0.00 0.00 6767.91 6767.91 01
Sixth Floor 7706.16 57.65 7648.51 7648.51 0.00 161.27 135.44 482.10 213.64 0.00 6656.06 0.00 0.00 0.00 6656.06 6656.06 01
Seventh Floor 7706.16 57.65 7648.51 7648.51 0.00 161.27 135.44 482.10 213.64 0.00 6656.06 0.00 0.00 0.00 6656.06 6656.06 01
Eighth Floor 7706.15 57.83 7648.32 7648.32 0.00 161.27 135.43 442.71 213.64 0.00 6695.27 0.00 0.00 0.00 6695.27 6695.27 01
Ninth Floor 7706.15 53.96 7652.19 7652.19 0.00 161.27 135.43 615.26 213.64 0.00 6526.59 0.00 0.00 0.00 6526.59 6526.59 01
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 00
Total : 99631.48 2240.21 97391.27 84650.41 12625.98 1940.08 1506.14 6746.25 2222.61 12568.82 68821.69 3063.57 127.93 63.63 72128.08 72128.08 13
Total Number of Same Buildings : 1
Total : 99631.48 2240.21 97391.27 84650.41 12625.98 1940.08 1506.14 6746.25 2222.61 12568.82 68821.69 3063.57 127.93 63.63 72128.08 72128.08 13
[-] Table 4c-2

  FAR Area
Building FAR Area:72128.09
Existing FAR Area :0.00
Perm.
72901.92
Prop.
72128.09
Status
OK




[-] Margin Checks (Table 5)
   
[-] Plot Margin (Table 5a)
Building / Wing Road Name Front Side Rear Side Side1 Side2 Status
Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop.
A-1 (HOSPITAL) 25.0 M ROAD 10.00 26.05 6.50 27.42 6.50 10.85 6.50 10.80 OK






[-] Inner Building Details (Table 6)
   
   
[-] Lift Details (Table 6d)
Building Name Height Number Of Lift(s) Number Of Strature Lift(s) Capacity Of Lift(s) Passanger Status
Prop Reqd Prop Reqd Prop Reqd Prop
A (HOSPITAL) 42.90 2 19 - 0 12 114 OK

[-] Lift Check Table

[-] For Building :A (HOSPITAL)
Floor Name Lift Name Width Depth Status
Reqd Prop Reqd Prop
TERRACE FLOOR PLAN Lift Machine Room 1.70 3.45 1.90 7.80 OK
BASEMENT FLOOR PLAN Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 1.90 1.90 1.90 OK
Lift 1.70 2.40 1.90 3.15 OK
LOWER GROUND FLOOR PLAN Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK
Lift 1.70 2.40 1.90 3.05 OK

   


[-] Parking Details (Table 7)
   
   


[-] Exemption Details (Table 8)
   


Not Required to Check StairCase Number Rule.


[-] Staircase Checks (Table 8a-1)


[-] For Building :A (HOSPITAL)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
TERRACE FLOOR PLAN HEAD ROOM - 2.000 - 0.300 - 0.000 - 0 - - 3.050 OK
HEAD ROOM - 2.000 - 0.300 - 0.000 - 0 - - 3.050 OK
HEAD ROOM - 2.000 - 0.300 - 0.000 - 0 - - 3.050 OK
HEAD ROOM - 2.000 - 0.300 - 0.000 - 0 - - 3.050 OK
HEAD ROOM - 2.000 - 0.300 - 0.000 - 0 - - 3.050 OK
HEAD ROOM - 2.000 - 0.300 - 0.000 - 0 - - 3.050 OK
HEAD ROOM - 2.000 - 0.300 - 0.000 - 0 - - 3.050 OK
HEAD ROOM - 2.000 - 0.300 - 0.000 - 0 - - 3.050 OK
HEAD ROOM - 2.000 - 0.300 - 0.000 - 0 - - 3.050 OK
HEAD ROOM - 2.000 - 0.300 - 0.000 - 0 - - 3.050 OK
BASEMENT FLOOR PLAN Staircase -3FL 0.900 2.000 0.250 0.300 0.200 0.000 - 0 - - 0.000 OK
Fire Escape Staircase 0.900 2.000 0.250 0.300 0.200 0.000 16 0 - - 0.000 OK
Staircase -3FL 0.900 2.000 0.250 0.300 0.200 0.000 - 0 - - 0.000 OK
Staircase -3FL 0.900 2.000 0.250 0.300 0.200 0.000 - 0 - - 0.000 OK
Fire Escape Staircase 0.900 2.000 0.250 0.300 0.200 0.000 16 0 - - 0.000 OK
Staircase -3FL 0.900 2.000 0.250 0.300 0.200 0.000 - 0 - - 0.000 OK
Fire Escape Staircase 0.900 2.000 0.250 0.300 0.200 0.000 16 0 - - 0.000 OK
Fire Escape Staircase 0.900 2.000 0.250 0.300 0.200 0.000 16 0 - - 0.000 OK
Staircase -3FL 0.900 2.000 0.250 0.300 0.200 0.000 - 0 - - 0.000 OK
Fire Escape Staircase 0.900 2.000 0.250 0.300 0.200 0.000 16 0 - - 0.000 OK
LOWER GROUND FLOOR PLAN Fire Escape Staircase 0.900 2.000 0.250 0.300 0.200 0.170 16 14 - - 0.000 OK
Staircase -3FL 0.900 2.000 0.250 0.300 0.200 0.131 - 12 - - 0.000 OK
Staircase -3FL 0.900 2.000 0.250 0.300 0.200 0.131 - 12 - - 0.000 OK
Fire Escape Staircase 0.900 2.000 0.250 0.300 0.200 0.182 16 14 - - 0.000 OK

   
   
   

[-] Ramp Checks (Table 8b-a)
Ramp Name Width Depth Slope Status
Reqd Prop Reqd Prop Reqd Perm Prop
21.80 mt. long 3.00 mt. High 9.80 mt. Wide Natural Slope - 9.80 - 3.00 - - - OK
21.40 mt. long 3.00 mt. High 4.80 mt. Wide Natural Slope - 4.90 - 3.00 - - - OK
39.20 mt. long 3.00 mt. High 10.20 mt. Wide Natural Slope - 10.20 - 3.00 - - - OK
39.20 mt. long 3.00 mt. High 10.20 mt. Wide Natural Slope - 10.20 - 3.00 - - - OK
39.20 mt. long 3.00 mt. High 10.20 mt. Wide Natural Slope - 10.20 - 3.00 - - - OK
39.20 mt. long 3.00 mt. High 10.20 mt. Wide Natural Slope - 10.20 - 3.00 - - - OK
39.20 mt. long 3.00 mt. High 10.20 mt. Wide Natural Slope - 10.20 - 3.00 - - - OK
39.20 mt. long 3.00 mt. High 12.20 mt. Wide Natural Slope - 12.53 - 3.00 - - - OK
39.20 mt. long 3.00 mt. High 10.20 mt. Wide Natural Slope - 10.61 - 3.00 - - - OK


[-] Ramp Checks (Table 8b)
Building Name Floor Name No. Status
Reqd Prop
A (HOSPITAL) FIRST FLOOR PLAN - 2 OK
SECOND FLOOR PLAN - 2 OK
THIRD FLOOR PLAN - 2 OK
FOURTH FLOOR PLAN - 2 OK
FIFTH FLOOR PLAN - 2 OK
TYPICAL - 6& 7 FLOOR PLAN - 4 OK
EIGHTH FLOOR PLAN - 2 OK
NINTH FLOOR PLAN - 2 OK
BASEMENT FLOOR PLAN 1 2 OK
LOWER GROUND FLOOR PLAN - 2 OK
UPPER GROUND FLOOR PLAN - 9 OK

   
   
[-] Arch Projection Checks (Table 8c - a)

[-] For Building :A (HOSPITAL)
Floor Name Arch Proj Name Width Depth Area Status
Perm Prop Perm Prop Perm Prop
FIRST FLOOR PLAN ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.50 - 9.46 - 4.73 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.50 - 25.43 - 12.72 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.53 - 5.23 - 2.77 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.49 OK
ARCHPROJ 0.75 0.63 - 1.40 - 0.88 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.80 - 1.35 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 34.13 - 21.50 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 12.56 - 8.93 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 4.60 - 2.44 OK
ARCHPROJ 0.75 0.63 - 8.42 - 5.30 OK
ARCHPROJ 0.75 0.75 - 4.20 - 3.15 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.17 - 0.74 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.75 - 1.17 - 0.88 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
SECOND FLOOR PLAN ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.50 - 9.46 - 4.73 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.50 - 25.43 - 12.72 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.53 - 5.23 - 2.77 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.49 OK
ARCHPROJ 0.75 0.63 - 1.40 - 0.88 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.80 - 1.35 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 34.13 - 21.50 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 12.56 - 8.93 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 4.60 - 2.44 OK
ARCHPROJ 0.75 0.63 - 8.42 - 5.30 OK
ARCHPROJ 0.75 0.75 - 4.20 - 3.15 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.17 - 0.74 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.75 - 1.17 - 0.88 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
THIRD FLOOR PLAN ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.50 - 9.46 - 4.73 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.50 - 25.43 - 12.72 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.53 - 5.23 - 2.77 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.49 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.80 - 1.35 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 34.13 - 21.50 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 12.56 - 8.93 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 4.60 - 2.44 OK
ARCHPROJ 0.75 0.63 - 8.42 - 5.30 OK
ARCHPROJ 0.75 0.75 - 4.20 - 3.15 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.17 - 0.74 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.75 - 1.17 - 0.88 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
FOURTH FLOOR PLAN ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.50 - 9.46 - 4.73 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.50 - 25.43 - 12.72 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.53 - 5.23 - 2.77 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.49 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 7.60 - 4.03 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.80 - 1.35 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 34.13 - 21.50 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 12.56 - 8.93 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 4.60 - 2.44 OK
ARCHPROJ 0.75 0.63 - 8.42 - 5.30 OK
ARCHPROJ 0.75 0.75 - 4.20 - 3.15 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.17 - 0.74 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.75 - 1.17 - 0.88 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
FIFTH FLOOR PLAN ARCHPROJ 0.75 0.75 - 1.40 - 1.05 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.50 - 9.46 - 4.73 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.50 - 25.43 - 12.72 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.53 - 5.23 - 2.77 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.49 OK
ARCHPROJ 0.75 0.63 - 1.40 - 0.88 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.80 - 1.35 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 34.13 - 21.50 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 12.56 - 8.93 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 4.60 - 2.44 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.17 - 0.74 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.75 - 1.17 - 0.88 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.53 - 1.50 - 0.80 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
ARCHPROJ 0.75 0.43 - 1.50 - 0.65 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.75 - 1.17 - 0.88 OK
TYPICAL - 6& 7 FLOOR PLAN ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.50 - 9.46 - 4.73 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.50 - 25.43 - 12.72 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.53 - 5.23 - 2.77 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.49 OK
ARCHPROJ 0.75 0.63 - 1.40 - 0.88 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.80 - 1.35 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 34.13 - 21.50 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 12.56 - 8.93 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 4.60 - 2.44 OK
ARCHPROJ 0.75 0.63 - 8.42 - 5.30 OK
ARCHPROJ 0.75 0.75 - 4.20 - 3.15 OK
EIGHTH FLOOR PLAN ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.50 - 9.46 - 4.73 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.50 - 25.43 - 12.72 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.53 - 5.23 - 2.77 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.49 OK
ARCHPROJ 0.75 0.63 - 1.40 - 0.88 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.80 - 1.35 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 34.13 - 21.50 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 12.56 - 8.93 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 4.60 - 2.44 OK
ARCHPROJ 0.75 0.63 - 8.38 - 5.28 OK
ARCHPROJ 0.75 0.75 - 4.20 - 3.15 OK
NINTH FLOOR PLAN ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.50 - 9.46 - 4.73 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.13 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.50 - 25.43 - 12.72 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.95 OK
ARCHPROJ 0.75 0.53 - 5.23 - 2.77 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.49 OK
ARCHPROJ 0.75 0.63 - 1.40 - 0.88 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.80 - 1.35 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 34.13 - 21.50 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 12.56 - 8.93 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 4.60 - 2.44 OK
ARCHPROJ 0.75 0.63 - 8.37 - 5.27 OK
ARCHPROJ 0.75 0.75 - 4.20 - 3.15 OK
UPPER GROUND FLOOR PLAN ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 8.07 - 4.28 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.75 - 1.50 - 1.12 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.63 - 1.42 - 0.89 OK
ARCHPROJ 0.75 0.75 - 1.80 - 1.35 OK
ARCHPROJ 0.75 0.63 - 1.50 - 0.94 OK
ARCHPROJ 0.75 0.63 - 34.13 - 21.50 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 4.17 - 3.13 OK
ARCHPROJ 0.75 0.75 - 12.56 - 9.01 OK
ARCHPROJ 0.75 0.53 - 4.70 - 2.50 OK
ARCHPROJ 0.75 0.53 - 4.90 - 2.60 OK
ARCHPROJ 0.75 0.63 - 8.30 - 5.23 OK
ARCHPROJ 0.75 0.63 - 3.80 - 2.39 OK
   
   
   
[-] Accessory Use Check (Table 8d)
Accessory Use Name Area Width Depth Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
TERRACE - - 243.32 - - 11.05 - - 22.02 - - 0.00 OK
TERRACE - - 1351.29 - - 36.00 - - 37.67 - - 0.00 OK
Toilet - 5.00 4.00 - - 2.00 - - 2.00 - - 0.00 OK
RAIN WATER HARVESTING - - 16.30 - - 4.55 - - 4.56 - - 0.00 OK
AC PLANT - - 311.87 - - 13.77 - - 22.65 - - 0.00 OK
TRANSFORMERS - - 41.50 - - 4.63 - - 9.90 - - 0.00 OK
ENT.GATE - - 0.62 - - 0.21 - - 3.18 - - 0.00 OK
ENT.GATE - - 0.62 - - 0.21 - - 3.18 - - 0.00 OK
GUARD ROOM - 10.00 9.67 - - 3.05 - - 3.20 - - 0.00 OK
GUARD ROOM - 10.00 9.97 - - 3.00 - - 3.34 - - 0.00 OK
GUARD ROOM - 10.00 7.39 - - 2.50 - - 2.96 - - 0.00 OK
Under ground water tank - - 195.61 - - 12.41 - - 15.77 - - 0.00 OK
Liquid Oxygen tank - - 162.00 - - 9.00 - - 18.00 - - 0.00 OK
Gas Manifold - - 278.89 - - 16.13 - - 17.29 - - 0.00 OK
TEMPLE - - 36.00 - - 6.00 - - 6.00 - - 0.00 OK
SOLAR HEATING SYSTEM - - 835.43 - - 16.48 - - 50.70 - - 0.00 OK
SOLAR HEATING SYSTEM - - 1276.76 - - 25.00 - - 51.07 - - 0.00 OK





[-] Accessory Use No. Checks
Building Name Accessory Use Name No Status
Reqd Perm Prop
A (HOSPITAL) Rain Water Harvesting 1 - 1 OK
Solar Water Heating System 1 - 2 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 2 OK
   
   


[-] Floor Details (Table 9)
   

[-] Building:A (HOSPITAL)


[-] Floor:FIRST FLOOR PLAN



No Room Found.

[-] Floor:SECOND FLOOR PLAN



No Room Found.

[-] Floor:THIRD FLOOR PLAN



No Room Found.

[-] Floor:FOURTH FLOOR PLAN



No Room Found.

[-] Floor:FIFTH FLOOR PLAN



No Room Found.

[-] Floor:TYPICAL - 6& 7 FLOOR PLAN



No Room Found.

[-] Floor:EIGHTH FLOOR PLAN



No Room Found.

[-] Floor:NINTH FLOOR PLAN



No Room Found.

[-] Floor:BASEMENT FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:LOWER GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:UPPER GROUND FLOOR PLAN



No Room Found.


   


[-] Summary (Table 10)
   
Name Perm./Reqd. Proposed Status
  Plot Area 300.00 24300.64 OK
  Plot Width - 119.00 OK
  Plot Depth - 204.22 OK
  Access Width 12.20 25.00 OK
  Plot Frontage - 123.81 OK
  Coverage Area 12150.32 10377.53 OK
  FAR Area
Bldg. FAR Area : 72128.09
Sanctioned FAR Area :0.00
72901.92 72128.09 OK





[-] Rules
Topic Rule
Plot Level
Plot Area The minimum size of plot for Nursing homes/Polyclinics/Hospital category shall be 300.0 sq.mt.{As per Rule No. 35.1, Table 7 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Width The minimum size of plot for Nursing homes/Polyclinics/Hospital category shall be 300.0 sq.mt.{As per Rule No. 35.1, Table 7 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Depth The minimum size of plot for Nursing homes/Polyclinics/Hospital category shall be 300.0 sq.mt.{As per Rule No. 35.1, Table 7 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Access Width The minimum width of abutting road for High rise building (building with a height of 16.40 meters and above) shall be 12.20 mt.{As per Rule No. 35.1, Table 7}
Plot Frontage The minimum size of plot for Nursing homes/Polyclinics/Hospital category shall be 300.0 sq.mt.{As per Rule No. 35.1, Table 7 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
FAR Area (1) In New Area, for Non-Residential Building on abutting roadwidth 24.40 mt. (80 ft.) and above, the Floor Area Ratio-FAR shall be 3.0 {As per Rule No.39, Table 15}
(2) For this Authority, No Max. permissible FAR has been provided {As per Annexure III}
Consumed FAR (1) In New Area, for Non-Residential Building on abutting roadwidth 24.40 mt. (80 ft.) and above, the Floor Area Ratio-FAR shall be 3.0 {As per Rule No.39, Table 15}
(2) For this Authority, No Max. permissible FAR has been provided {As per Annexure III}
Common Plot Area In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
Common Plot (1) ;
(2) ;
(3) ; ;
Tree Number Mini. 8 Trees shall be required for the Plot area above 1000.0 sq.mt. (As per Rule No. 20.1.6)
Margin Rule In case of buildings of more than 30m height, for every increase in height of 6.7 m. or fraction thereof or addition of two floor, 1m. in the front set back and 0.75 m. in the sides and rear setbacks shall be added {As per Rule No. 37 Table 14 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Basement Margin Rule In case of apartment/ group housing/commercial building and basements may be allowed to be constructed under the entire plot area leaving mini. 2 mt. space from the boundary of the premises {As per Rule No. 48}
Building Level
Floor Height (1) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(2) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(3) o Every basement shall be in every part at least 2.4 m. in height from the floor to the soffit of the roof slab or ceiling and mini. Of 2.1 mr. below the soffit of beams {As per Rule No. 48}
Parapet Height (1) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(2) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(3) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Below GL Floor Height -,
Basement Floor No. Maximum two basements/cellars may be permitted to be constructed for the plot size above 750 sq.mt. leaving the prescribed set back/open space applicable to the building {As per Rule No. 48}
Floor Number No Rule Defined
Lift Count (1) The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
(2) For Non-Residential Building, Minimum number of lifts to be 2 for all non-residential building above ground + 2 and the minimum capacity shall be 6 persons per floor. {As per Rule No. 49.2.3 and as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Lift (1) -
(2) The area of lift well shall not be counted for F.A.R calculation)
(3) The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
(4) The area of lift well at one floor only (not the sum of total area of lift well at every floor) shall be counted for F.A.R calculation)
(5) The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
StairCase (1) No Rule Defined
(2) ; No Rule Defined
(3) Width of Winding staircase shall be mini. 0.90 mt.,Maximum rise 0.20 mt. & Minimum tread 0.25 mt. & Cabin Height 2.1 mt. {As per Rule No. 83.18}
(4) ; No Rule Defined
(5) Width of the Fire Stair case shall be mini. 0.90 mt.,Maximum rise 0.20 mt. & Minimum tread 0.25 mt. {As per Rule No. 43.5.3.6}
(6) ; Number of riser shall not exceed 16 per flight of stairs. {As per Rule No. 43.5.3.6}
Ramp No Need to Check Natural Slope width, Depth or height. ;
Ramp No. (1) -
(2) For parking spaces in basements and upper storey of parking floors, if car parking is more then 500sq.mt.,atleast two ramp of minimum of 3.30m width if it is straight and 3.60m width if it is curved or one ramp of minimum 5.4m width shall be provided
Arch Projection (1) No need to check
(2) Chhajja,Cornice or Weather shed of upto 0.75m width shall be permitted. {As per Rule No. 46.1}
Plot / Building Level
Accessory Use (1) -
(2) No need to check distance from Building TERRACE
(3) Common toilet of maximum size of 5 sq.mt shall be taken Free from FAR
(4) No need to check distance from Building Toilet
(5) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(6) No need to check distance from Building RAIN WATER HARVESTING
(7) Electric cabin or substation of maximum size of 4 sq.m. with minimum width or diameter of 2 m
(8) No need to check distance from Building AC PLANT
(9) -
(10) No need to check distance from Building TRANSFORMERS
(11) No need to check distance from Building ENT.GATE
(12) Guard room of max. 10 sq.mt. maximum size of 5 sq.mt shall be taken Free from FAR
(13) No need to check distance from Building GUARD ROOM
(14) -
(15) No need to check distance from Building Under ground water tank
(16) -
(17) No need to check distance from Building Liquid Oxygen tank
(18) -
(19) No need to check distance from Building Gas Manifold
(20) -
(21) No need to check distance from Building TEMPLE
(22) -
(23) No need to check distance from Building SOLAR HEATING SYSTEM
Accessory Use Number (1) Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
(2) For Hospitals and Nursing Home type of Building, Provisions of Solar Water Heating System shall be done. Solar Water Heating System
(3) Provision of toilets for visitors and separate toilets for guards and drivers shall be provided for Multistoried for Commercial and multidwelling units including Apartments Toilet
(4) In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premise shall not be less than 5 (five) meters i n width in order to allow easy access to fire engine Entrance Gate
Building Level (Rooms)
--- End ---