No Image Found   

Detail Scrutiny Report

JHARKHAND INDUSTRIAL AREA DEVELOPMENT AUTHORITY

Version Number: 1.0.62  
Version Date: 16/10/2020 
Report Generated On: 02-03-2022 
 
[-] Collapse All


General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictRANCHI
AuthorityJHARKHAND INDUSTRIAL AREA DEVELOPMENT AUTHORITY
Inward_NoJIADA/BP/0001/2022
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaNew Area
City Area/TPScheme NoNA
VillageGORABALI
Taluka0
Architect Details
Architect NameNikhil Jain
License No.JIADA/ARC/0001/2018
Architect AddressBothra Bhawan, Opposite Indra Place, Main Road, Hinoo
Architect EmailIDbdpranchi@gmail.com
Architect Mobile No8087667001
Plot Details
Plot Use Industrial
Plot SubUse Industrial Building
PlotNearbyReligiousStructure NA
Plot/SubPlot NoINDUSTRIAL PLOT NO. IV/A-7(P)4
NorthSurvey No. - 773P,777P,779P,781P,782P,784P,880P,850P,849P,IV/A-7P
SouthSurvey No. - 893P,870P,868P,957P,956P, DVC CORRIDOR
EastSurvey No. - 851P,852P,856P,858P,960P,959P,956P,954P,IV/A-7P2
WestSurvey No. - 773P,776P,887P,888P,890P,893P, INDIAN OIL
Owner's Details
NameMr Priya Ranjan
AddressM/S DALMIA CEMENT BHARAT LIMITED (BOKARO CEMENT MANUFACTURING WORKS) PLOT NO. IV/A-7P4, BOKARO INDUSTRIAL AREA, BALIDIH PHASE - 4, PO - BALIDIH, DISTRICT - BOKARO, STATE - JHARKHAND
Email IDsinha.rajeevkumar@dalmiacement.com
Mobile No9771478206
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 63737.99
2 Plot area as per Document by Applicant 63737.99
3 Physical area measured at site 63737.99
4 Area as per Site Visit (Site Visit Report) 63737.99
5Area as per Drawing 63736.68

Area of Plot Considered : 63736.68

[-] Table 2b
Proposal Detail :
UnitMeters
Development Detail :
PlotPLOT
Plot OccupancyIndustrial
Plot SubUse Industrial Building
Building StructureMultistoried
Building TypeSingle Detached House
Gross Plot Area 63736.68
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 63736.68
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 55224.82
Deductions for Balance Plot Area (from Gross Plot Area)
- Common Plot 8511.85
8511.85
Balance Plot Area 55224.82

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 50.00 % ) 31868.34
Proposed Coverage Area ( 28.06 % ) 17881.39
Total Prop. Coverage Area ( 28.06 % ) 17881.39
Balance coverage area ( 21.94 % ) 13986.95
FAR CHECK
Perm. FAR Area ( 2.00 ) 127473.36
Total Perm. FAR area 127473.36
Industrial FAR 27585.37
Proposed FAR Area 27585.37
Total Proposed FAR Area 27585.37
Consumed FAR (Factor) 0.43
Balance FAR Area 99887.99
BUA CHECK
Total Proposed BuiltUp Area 27585.35


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Exceeding 100 meter and upto 250 meter -
Existing Road Width 24.38 24.38
Proposed Road Width as per Master Plan 0 -
Road Widening Width 0 -
Plot size (as per measurement) 63737.99 63736.68
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK


[-] Plot Level Checking (Table 3)
   
[-] Common Plot Checks (Table 3b)
Name Total Area Status
Reqd Prop
Common Plot 6373.67 8511.85 OK


[-] Common Plot Checks (Table 3b)
Name Minimum Area Access Status
Reqd Prop
Normal Open Space - 836.70 No Access Provided OK
Normal Open Space - 1199.12 No Access Provided OK
Normal Open Space - 1243.44 No Access Provided OK
Normal Open Space - 1245.53 No Access Provided OK
Normal Open Space - 1324.44 No Access Provided OK
Normal Open Space - 2662.63 No Access Provided OK


   
   
[-] Tree Details (Table 3g)
Name Nos Of Trees Status
Reqd Prop
Tree 8 12 OK
   
   
   
   
   


[-] Building Details (Table 4)
   
[-] Building USE/SUBUSE Details Building USE/SUBUSE Details
Building Name Building Use Building SubUse Building Structure
A (ADDITIVE STOCK PILE SHED) Industrial Industrial Building Multistoried
E (CEMENT MILL ) Industrial Industrial Building Multistoried
D (CEMENT MILL HOPPER) Industrial Industrial Building Multistoried
F (CEMENT MILL BAGHOUSE) Industrial Industrial Building Multistoried
C (BRU AND TRUCK TIPPLER) Industrial Industrial Building Multistoried
G (FBC) Industrial Industrial Building Multistoried
M (TOILET BLOCK) Industrial Industrial Building Multistoried
L (SITE OFFICE) Industrial Industrial Building Multistoried
K (WORKERS REST) Industrial Industrial Building Multistoried
J (PACKING PLANT) Industrial Industrial Building Multistoried
I (CEMENT SILO) Industrial Industrial Building Multistoried
FLY (ASH) Industrial Industrial Building Multistoried
   
   
   
[-] Height Details (4a)



[-] Total Height (Table 4a-1)
Building Height (From GL) Height (From Street LVL) Status
A (ADDITIVE STOCK PILE SHED) 29.58 29.58 OK
E (CEMENT MILL ) 60.27 60.27 OK
D (CEMENT MILL HOPPER) 39.58 39.58 OK
F (CEMENT MILL BAGHOUSE) 26.00 26.00 OK
C (BRU AND TRUCK TIPPLER) 9.60 9.60 OK
G (FBC) 24.30 24.30 OK
M (TOILET BLOCK) 3.60 3.60 OK
L (SITE OFFICE) 4.00 4.00 OK
K (WORKERS REST) 7.50 7.50 OK
J (PACKING PLANT) 33.79 33.79 OK
I (CEMENT SILO) 54.29 54.29 OK
FLY (ASH) 5.50 5.50 OK


   
   
[-] Floor Height Check (Table 4a-2)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
A (ADDITIVE STOCK PILE SHED) Ground Floor 2.75 - 29.58 2.75 - 29.46 2.40 - 29.31 OK
Plinth 0.45 - 0.60 - - 0.60 - - 0.60 OK
E (CEMENT MILL ) Sixth Floor 2.75 - 17.24 2.75 - 17.12 2.40 - 16.97 OK
Fifth Floor 2.75 - 5.20 2.75 - 5.08 2.40 - 4.93 OK
Fourth Floor 2.75 - 6.00 2.75 - 5.88 2.40 - 5.73 OK
Third Floor 2.75 - 6.80 2.75 - 6.68 2.40 - 6.53 OK
Second Floor 2.75 - 5.00 2.75 - 4.88 2.40 - 4.73 OK
First Floor 2.75 - 4.20 2.75 - 4.08 2.40 - 3.93 OK
Ground Floor 2.75 - 15.83 2.75 - 15.70 2.40 - 15.55 OK
Plinth 0.45 - 0.60 - - 0.60 - - 0.60 OK
D (CEMENT MILL HOPPER) Sixth Floor 2.75 - 3.80 2.75 - 3.68 2.40 - 3.53 OK
Fifth Floor 2.75 - 5.00 2.75 - 4.88 2.40 - 4.73 OK
Fourth Floor 2.75 - 10.00 2.75 - 9.88 2.40 - 9.73 OK
Third Floor 2.75 - 7.80 2.75 - 7.68 2.40 - 7.53 OK
Second Floor 2.75 - 4.00 2.75 - 3.88 2.40 - 3.73 OK
First Floor 2.75 - 4.50 2.75 - 4.38 2.40 - 4.23 OK
Ground Floor 2.75 - 4.48 2.75 - 4.35 2.40 - 4.20 OK
Plinth 0.45 - 0.60 - - 0.60 - - 0.60 OK
F (CEMENT MILL BAGHOUSE) First Floor 2.75 - 7.40 2.75 - 7.28 2.40 - 7.13 OK
Ground Floor 2.75 - 18.60 2.75 - 18.48 2.40 - 18.33 OK
Plinth 0.45 - 0.60 - - 0.60 - - 0.60 OK
C (BRU AND TRUCK TIPPLER) Ground Floor 2.75 - 9.60 2.75 - 9.48 2.40 - 9.33 OK
Plinth 0.45 - 0.60 - - 0.60 - - 0.60 OK
G (FBC) Third Floor 2.75 - 9.33 2.75 - 9.21 2.40 - 9.06 OK
Second Floor 2.75 - 5.30 2.75 - 5.17 2.40 - 5.03 OK
First Floor 2.75 - 5.83 2.75 - 5.71 2.40 - 5.56 OK
Ground Floor 2.75 - 3.84 2.75 - 3.71 2.40 - 3.56 OK
Plinth 0.45 - 0.60 - - 0.60 - - 0.60 OK
M (TOILET BLOCK) Ground Floor 2.75 - 3.60 2.75 - 3.48 2.40 - 3.33 OK
Plinth 0.45 - 0.60 - - 0.60 - - 0.60 OK
L (SITE OFFICE) Ground Floor 2.75 - 4.00 2.75 - 3.88 2.40 - 3.73 OK
Plinth 0.45 - 0.60 - - 0.60 - - 0.60 OK
K (WORKERS REST) Ground Floor 2.75 - 7.50 2.75 - 7.38 2.40 - 7.23 OK
Plinth 0.45 - 0.90 - - 0.90 - - 0.90 OK
J (PACKING PLANT) Sixth Floor 2.75 - 12.83 2.75 - 12.71 2.40 - 12.56 OK
Fifth Floor 2.75 - 3.90 2.75 - 3.78 2.40 - 3.63 OK
Fourth Floor 2.75 - 4.11 2.75 - 3.99 2.40 - 3.84 OK
Third Floor 2.75 - 3.85 2.75 - 3.73 2.40 - 3.58 OK
Second Floor 2.75 - 3.00 2.75 - 2.88 2.40 - 2.84 OK
First Floor 2.75 - 3.00 2.75 - 2.88 2.40 - 2.73 OK
Ground Floor 2.75 - 3.10 2.75 - 2.98 2.40 - 2.96 OK
Plinth 0.45 - 0.90 - - 0.90 - - 0.90 OK
I (CEMENT SILO) Ground Floor 2.75 - 54.29 2.75 - 54.17 2.40 - 54.02 OK
Plinth 0.45 - 0.90 - - 0.90 - - 0.90 OK
FLY (ASH) Ground Floor 2.75 - 5.50 2.75 - 5.38 2.40 - 5.23 OK
Plinth 0.45 - 0.60 - - 0.60 - - 0.60 OK


[-] Parapet Height Check (Table 4a-2.1)
Building Name Floor Name Height Status
Reqd Perm Prop
A (ADDITIVE STOCK PILE SHED) Terrace Floor - - 1.20 OK
E (CEMENT MILL ) Terrace Floor - - 1.20 OK
D (CEMENT MILL HOPPER) Terrace Floor - - 1.20 OK
F (CEMENT MILL BAGHOUSE) Terrace Floor - - 1.20 OK
C (BRU AND TRUCK TIPPLER) Terrace Floor - - 1.20 OK
G (FBC) Terrace Floor - - 1.40 OK
M (TOILET BLOCK) Terrace Floor - - 1.20 OK
L (SITE OFFICE) Terrace Floor - - 1.00 OK
K (WORKERS REST) Terrace Floor - - 1.00 OK
J (PACKING PLANT) Terrace Floor - - 2.01 OK
I (CEMENT SILO) Terrace Floor - - 1.22 OK
FLY (ASH) Terrace Floor - - 1.20 OK
   
   
   
[-] Floor Number Check (Table 4a-4)
Building Name No. of Floors No. of Tenements Status
Perm Prop Perm Prop
A (ADDITIVE STOCK PILE SHED) - 1 - 1 OK
E (CEMENT MILL ) - 7 - 7 OK
D (CEMENT MILL HOPPER) - 7 - 7 OK
F (CEMENT MILL BAGHOUSE) - 2 - 2 OK
C (BRU AND TRUCK TIPPLER) - 1 - 1 OK
G (FBC) - 4 - 4 OK
M (TOILET BLOCK) - 1 - 0 OK
L (SITE OFFICE) - 1 - 1 OK
K (WORKERS REST) - 1 - 1 OK
J (PACKING PLANT) - 7 - 7 OK
I (CEMENT SILO) - 1 - 1 OK
FLY (ASH) - 1 - 1 OK

 
   
    [-] Coverage Check (Table 4b)
Permissible Proposed Status
31868.34 17881.39 OK
50% 28.06%

[-] Individual Coverage Check
Coverage Area Perm. Prop.
  A-1 (ADDITIVE STOCK PILE SHED) - 11832.00
  E-1 (CEMENT MILL ) - 497.69
  D-1 (CEMENT MILL HOPPER) - 288.32
  F-1 (CEMENT MILL BAGHOUSE) - 514.69
  C-1 (BRU AND TRUCK TIPPLER) - 590.17
  G-1 (FBC) - 291.52
  M-1 (TOILET BLOCK) - 26.35
  L-1 (SITE OFFICE) - 268.19
  K-1 (WORKERS REST) - 270.01
  J-1 (PACKING PLANT) - 2395.12
  I-1 (CEMENT SILO) - 579.29
  FLY-1 (ASH) - 328.04
  Total Prop. Coverage Area - 17881.39
  Total Coverage Area 31868.34 17881.39

[-] FAR & Tenement Details (Table 4c-1)
Building No. of Same Bldg Gross Built Up Area (Sq.mt.) Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Cutout Industrial
A (ADDITIVE STOCK PILE SHED) 1 11832.00 0.00 11832.00 11832.00 11832.00 11832.00 01
E (CEMENT MILL ) 1 8464.82 5137.60 3327.22 3327.23 3327.22 3327.22 07
D (CEMENT MILL HOPPER) 1 2025.39 12.26 2013.13 2013.14 2013.13 2013.13 07
F (CEMENT MILL BAGHOUSE) 1 1029.38 27.85 1001.53 1001.52 1001.53 1001.53 02
C (BRU AND TRUCK TIPPLER) 1 590.17 0.00 590.17 590.17 590.17 590.17 01
G (FBC) 1 951.85 154.96 796.89 796.89 796.89 796.89 04
M (TOILET BLOCK) 1 26.35 0.00 26.35 26.35 26.35 26.35 00
L (SITE OFFICE) 1 268.19 0.00 268.19 268.19 268.19 268.19 01
K (WORKERS REST) 1 270.01 0.00 270.01 270.01 270.01 270.01 01
J (PACKING PLANT) 1 9833.78 3281.25 6552.53 6552.53 6552.53 6552.53 07
I (CEMENT SILO) 1 579.29 0.00 579.29 579.29 579.29 579.29 01
FLY (ASH) 1 328.04 0.00 328.04 328.04 328.04 328.04 01
Grand Total : 12 36199.27 8613.92 27585.35 27585.37 27585.35 27585.35 33


[-] Buildingwise Floor FAR Details
Floor Name Building Name Total
A (ADDITIVE STOCK PILE SHED) E (CEMENT MILL ) D (CEMENT MILL HOPPER) F (CEMENT MILL BAGHOUSE) C (BRU AND TRUCK TIPPLER) G (FBC) M (TOILET BLOCK) L (SITE OFFICE) K (WORKERS REST) J (PACKING PLANT) I (CEMENT SILO) FLY (ASH)
Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total Proposed Built Up Area (Sq.mt.) Total FAR Area (Sq.mt.)
Ground Floor 11832.00 11832.00 497.69 497.69 288.32 288.32 514.69 514.69 590.17 590.17 291.52 291.52 26.35 26.35 268.19 268.19 270.01 270.01 2395.12 2395.12 579.29 579.29 328.04 328.04 17881.39 17881.39
First Floor 0.00 0.00 458.90 458.90 288.32 288.32 486.84 486.84 0.00 0.00 190.42 190.42 0.00 0.00 0.00 0.00 0.00 0.00 322.93 322.93 0.00 0.00 0.00 0.00 1747.41 1747.41
Second Floor 0.00 0.00 560.66 560.66 288.32 288.32 0.00 0.00 0.00 0.00 207.26 207.26 0.00 0.00 0.00 0.00 0.00 0.00 1388.31 1388.31 0.00 0.00 0.00 0.00 2444.55 2444.55
Third Floor 0.00 0.00 492.26 492.26 287.08 287.08 0.00 0.00 0.00 0.00 107.69 107.69 0.00 0.00 0.00 0.00 0.00 0.00 910.54 910.54 0.00 0.00 0.00 0.00 1797.57 1797.57
Fourth Floor 0.00 0.00 370.09 370.09 293.05 293.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 913.82 913.82 0.00 0.00 0.00 0.00 1576.96 1576.96
Fifth Floor 0.00 0.00 503.47 503.47 286.32 286.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 302.92 302.92 0.00 0.00 0.00 0.00 1092.71 1092.71
Sixth Floor 0.00 0.00 444.15 444.15 281.72 281.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 318.89 318.89 0.00 0.00 0.00 0.00 1044.76 1044.76
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total : 11832.00 11832.00 3327.22 3327.22 2013.13 2013.13 1001.53 1001.53 590.17 590.17 796.89 796.89 26.35 26.35 268.19 268.19 270.01 270.01 6552.53 6552.53 579.29 579.29 328.04 328.04 27585.35 27585.35


[-] UnitBUA Table for Building :A (ADDITIVE STOCK PILE SHED)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN ADDITIVE OTHER 11832.00 11781.00 1 1
Total: - - 11832.00 11781.00 1 1
[-] UnitBUA Table for Building :E (CEMENT MILL ) UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN CEMENT MILL-G OTHER 497.69 494.90 1 1
FIRST FLOOR PLAN CEMENT MILL-F OTHER 458.90 456.11 1 1
SECOND FLOOR PLAN CEMENT MILL-S OTHER 560.66 557.87 1 1
THIRD FLOOR PLAN CEMENT MILL-T OTHER 492.26 489.47 2 1
FOURTH FLOOR PLAN CEMENT MILL-F OTHER 370.09 367.30 1 1
FIFTH FLOOR PLAN CEMENT MILL-5F OTHER 503.47 500.68 1 1
SIXTH FLOOR PLAN CEMENT MILL-6S OTHER 444.15 441.36 1 1
Total: - - 3327.22 3307.69 8 7
[-] UnitBUA Table for Building :D (CEMENT MILL HOPPER)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN CEMENT MILL HOPPER-G1 OTHER 288.32 287.51 4 1
FIRST FLOOR PLAN CEMENT MILL HOPPER-F1 OTHER 288.32 287.51 2 1
SECOND FLOOR PLAN CEMENT MILL HOPPER-F2 OTHER 288.32 287.51 2 1
THIRD FLOOR PLAN CEMENT MILL HOPPER-F3 OTHER 287.08 286.27 1 1
FOURTH FLOOR PLAN CEMENT MILL HOPPER-F4 OTHER 293.05 292.24 1 1
FIFTH FLOOR PLAN CEMENT MILL HOPPER-F5 OTHER 286.32 285.51 1 1
SIXTH FLOOR PLAN CEMENT MILL HOPPER-F6 OTHER 281.72 280.91 1 1
Total: - - 2013.13 2007.46 12 7
[-] UnitBUA Table for Building :F (CEMENT MILL BAGHOUSE)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN CEMENT MILL BAGHOUSE-G OTHER 514.69 513.46 2 1
FIRST FLOOR PLAN CEMENT MILL BAGHOUSE-F OTHER 486.84 484.71 1 1
Total: - - 1001.53 998.17 3 2
[-] UnitBUA Table for Building :C (BRU AND TRUCK TIPPLER)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN BRU OTHER 590.17 589.49 2 1
Total: - - 590.17 589.49 2 1
[-] UnitBUA Table for Building :G (FBC)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN FBC OTHER 291.52 291.11 1 1
FIRST FLOOR PLAN FBC1 OTHER 190.42 190.01 1 1
SECOND FLOOR PLAN FBC-2 OTHER 207.26 206.85 1 1
THIRD FLOOR PLAN FBC-3 OTHER 107.69 107.28 1 1
Total: - - 796.89 795.25 4 4
[-] UnitBUA Table for Building :M (TOILET BLOCK)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN TOILET BLOCK OTHER 0.00 0.00 4 0
Total: - - 0.00 0.00 4 0
[-] UnitBUA Table for Building :L (SITE OFFICE)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN SITE OFFICE OTHER 268.19 254.52 20 1
Total: - - 268.19 254.52 20 1
[-] UnitBUA Table for Building :K (WORKERS REST)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN WORKERS REST OTHER 270.01 245.67 16 1
Total: - - 270.01 245.67 16 1
[-] UnitBUA Table for Building :J (PACKING PLANT)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN PACKING PLANT OTHER 2395.12 2392.82 3 1
SECOND FLOOR PLAN PACKING PLANT-1 OTHER 1388.31 1386.01 3 1
FOURTH FLOOR PLAN PACKING PLANT-4 OTHER 913.82 911.52 2 1
FIFTH FLOOR PLAN PACKING PLANT-5 OTHER 302.92 300.62 1 1
THIRD FLOOR PLAN PACKING PLANT-3 OTHER 910.54 908.24 2 1
SIXTH FLOOR PLAN PACKING PLANT-5 OTHER 318.89 316.59 1 1
FIRST FLOOR PLAN PACKING PLANT-1 OTHER 322.93 320.63 3 1
Total: - - 6552.53 6536.43 15 7
[-] UnitBUA Table for Building :I (CEMENT SILO)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN CEMENT SILO OTHER 579.29 578.65 1 1
Total: - - 579.29 578.65 1 1
[-] UnitBUA Table for Building :FLY (ASH)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN FLY OTHER 328.04 328.01 2 1
Total: - - 328.04 328.01 2 1


[-] Building :A (ADDITIVE STOCK PILE SHED)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 11832.00 11832.00 11832.00 11832.00 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 11832.00 11832.00 11832.00 11832.00 01
Total Number of Same Buildings : 1
Total : 11832.00 11832.00 11832.00 11832.00 01

[-] Building :E (CEMENT MILL )
Floor Name Gross Builtup Area Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Cutout Industrial
Ground Floor 1214.94 717.25 497.69 497.69 497.69 497.69 01
First Floor 1206.47 747.57 458.90 458.90 458.90 458.90 01
Second Floor 1206.47 645.81 560.66 560.66 560.66 560.66 01
Third Floor 1206.47 714.21 492.26 492.26 492.26 492.26 01
Fourth Floor 1206.47 836.38 370.09 370.09 370.09 370.09 01
Fifth Floor 1206.47 703.00 503.47 503.47 503.47 503.47 01
Sixth Floor 1217.53 773.38 444.15 444.15 444.15 444.15 01
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 00
Total : 8464.82 5137.60 3327.22 3327.23 3327.22 3327.22 07
Total Number of Same Buildings : 1
Total : 8464.82 5137.60 3327.22 3327.23 3327.22 3327.22 07

[-] Building :D (CEMENT MILL HOPPER)
Floor Name Gross Builtup Area Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Cutout Industrial
Ground Floor 288.32 0.00 288.32 288.32 288.32 288.32 01
First Floor 288.32 0.00 288.32 288.32 288.32 288.32 01
Second Floor 288.32 0.00 288.32 288.32 288.32 288.32 01
Third Floor 290.74 3.66 287.08 287.08 287.08 287.08 01
Fourth Floor 293.05 0.00 293.05 293.05 293.05 293.05 01
Fifth Floor 288.32 2.00 286.32 286.32 286.32 286.32 01
Sixth Floor 288.32 6.60 281.72 281.72 281.72 281.72 01
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 00
Total : 2025.39 12.26 2013.13 2013.14 2013.13 2013.13 07
Total Number of Same Buildings : 1
Total : 2025.39 12.26 2013.13 2013.14 2013.13 2013.13 07

[-] Building :F (CEMENT MILL BAGHOUSE)
Floor Name Gross Builtup Area Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Cutout Industrial
Ground Floor 514.69 0.00 514.69 514.69 514.69 514.69 01
First Floor 514.69 27.85 486.84 486.84 486.84 486.84 01
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 00
Total : 1029.38 27.85 1001.53 1001.52 1001.53 1001.53 02
Total Number of Same Buildings : 1
Total : 1029.38 27.85 1001.53 1001.52 1001.53 1001.53 02

[-] Building :C (BRU AND TRUCK TIPPLER)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 590.17 590.17 590.17 590.17 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 590.17 590.17 590.17 590.17 01
Total Number of Same Buildings : 1
Total : 590.17 590.17 590.17 590.17 01

[-] Building :G (FBC)
Floor Name Gross Builtup Area Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Cutout Industrial
Ground Floor 291.52 0.00 291.52 291.52 291.52 291.52 01
First Floor 274.58 84.16 190.42 190.42 190.42 190.42 01
Second Floor 272.87 65.61 207.26 207.26 207.26 207.26 01
Third Floor 112.88 5.19 107.69 107.69 107.69 107.69 01
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 00
Total : 951.85 154.96 796.89 796.89 796.89 796.89 04
Total Number of Same Buildings : 1
Total : 951.85 154.96 796.89 796.89 796.89 796.89 04

[-] Building :M (TOILET BLOCK)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.)
Industrial
Ground Floor 26.35 26.35 26.35 26.35
Terrace Floor 0.00 0.00 0.00 0.00
Total : 26.35 26.35 26.35 26.35
Total Number of Same Buildings : 1
Total : 26.35 26.35 26.35 26.35

[-] Building :L (SITE OFFICE)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 268.19 268.19 268.19 268.19 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 268.19 268.19 268.19 268.19 01
Total Number of Same Buildings : 1
Total : 268.19 268.19 268.19 268.19 01

[-] Building :K (WORKERS REST)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 270.01 270.01 270.01 270.01 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 270.01 270.01 270.01 270.01 01
Total Number of Same Buildings : 1
Total : 270.01 270.01 270.01 270.01 01

[-] Building :J (PACKING PLANT)
Floor Name Gross Builtup Area Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Cutout Industrial
Ground Floor 2395.12 0.00 2395.12 2395.12 2395.12 2395.12 01
First Floor 2395.37 2072.44 322.93 322.93 322.93 322.93 01
Second Floor 2395.37 1007.06 1388.31 1388.31 1388.31 1388.31 01
Third Floor 965.70 55.16 910.54 910.54 910.54 910.54 01
Fourth Floor 962.63 48.81 913.82 913.82 913.82 913.82 01
Fifth Floor 351.81 48.89 302.92 302.92 302.92 302.92 01
Sixth Floor 367.78 48.89 318.89 318.89 318.89 318.89 01
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 00
Total : 9833.78 3281.25 6552.53 6552.53 6552.53 6552.53 07
Total Number of Same Buildings : 1
Total : 9833.78 3281.25 6552.53 6552.53 6552.53 6552.53 07

[-] Building :I (CEMENT SILO)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 579.29 579.29 579.29 579.29 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 579.29 579.29 579.29 579.29 01
Total Number of Same Buildings : 1
Total : 579.29 579.29 579.29 579.29 01

[-] Building :FLY (ASH)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 328.04 328.04 328.04 328.04 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 328.04 328.04 328.04 328.04 01
Total Number of Same Buildings : 1
Total : 328.04 328.04 328.04 328.04 01
[-] Table 4c-2

  FAR Area
Building FAR Area:27585.37
Existing FAR Area :0.00
Perm.
127473.36
Prop.
27585.37
Status
OK




[-] Margin Checks (Table 5)
   
[-] Plot Margin (Table 5a)
Building / Wing Road Name Front Side Rear Side Side1 Side2 Status
Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop.
A-1 (ADDITIVE STOCK PILE SHED) 24.38 M WIDE ROAD 8.00 167.07 5.00 13.21 5.00 41.05 5.00 21.69 OK
C-1 (BRU AND TRUCK TIPPLER) 24.38 M WIDE ROAD 6.50 16.32 4.50 191.81 4.50 206.75 4.50 25.18 OK
D-1 (CEMENT MILL HOPPER) 24.38 M WIDE ROAD 10.00 120.78 6.50 100.10 6.50 240.10 6.50 10.04 OK
E-1 (CEMENT MILL ) 24.38 M WIDE ROAD 13.00 110.94 8.75 89.33 8.75 107.72 8.75 124.42 OK
F-1 (CEMENT MILL BAGHOUSE) 24.38 M WIDE ROAD 8.00 123.27 5.00 100.30 5.00 71.70 5.00 160.62 OK
FLY-1 (ASH) 24.38 M WIDE ROAD 6.50 137.45 4.50 84.73 4.50 144.21 4.50 100.38 OK
G-1 (FBC) 24.38 M WIDE ROAD 8.00 138.39 5.00 81.43 5.00 77.37 5.00 165.13 OK
I-1 (CEMENT SILO) 24.38 M WIDE ROAD 12.00 115.58 8.00 84.51 8.00 42.10 8.00 204.76 OK
J-1 (PACKING PLANT) 24.38 M WIDE ROAD 9.00 62.10 5.75 127.99 5.75 51.56 5.75 153.88 OK
K-1 (WORKERS REST) 24.38 M WIDE ROAD 6.50 15.37 4.50 209.57 4.50 18.88 4.50 223.63 OK
L-1 (SITE OFFICE) 24.38 M WIDE ROAD 6.50 15.78 4.50 210.90 4.50 83.50 4.50 160.75 OK
M-1 (TOILET BLOCK) 24.38 M WIDE ROAD 6.50 15.92 4.50 219.11 4.50 179.67 4.50 80.83 OK



[-] Building To Building Margin Check (Table 5b)
From Wing To Wing Margin Status
Reqd Prop
A-1 (ADDITIVE STOCK PILE SHED) K-1 (WORKERS REST) 7.50 138.32 OK
M-1 (TOILET BLOCK) 7.50 147.89 OK
D-1 (CEMENT MILL HOPPER) 7.50 29.14 OK
C-1 (BRU AND TRUCK TIPPLER) 7.50 120.59 OK
L-1 (SITE OFFICE) 7.50 139.66 OK
E-1 (CEMENT MILL ) K-1 (WORKERS REST) 7.50 104.19 OK
M-1 (TOILET BLOCK) 7.50 98.78 OK
D-1 (CEMENT MILL HOPPER) 7.50 97.78 OK
C-1 (BRU AND TRUCK TIPPLER) 7.50 93.65 OK
L-1 (SITE OFFICE) 7.50 83.09 OK
D-1 (CEMENT MILL HOPPER) K-1 (WORKERS REST) 7.50 216.85 OK
M-1 (TOILET BLOCK) 7.50 113.93 OK
J-1 (PACKING PLANT) 7.50 130.03 OK
F-1 (CEMENT MILL BAGHOUSE) 7.50 133.98 OK
FLY-1 (ASH) 7.50 73.74 OK
C-1 (BRU AND TRUCK TIPPLER) 7.50 74.03 OK
L-1 (SITE OFFICE) 7.50 162.63 OK
G-1 (FBC) 7.50 139.30 OK
I-1 (CEMENT SILO) 7.50 178.12 OK
A-1 (ADDITIVE STOCK PILE SHED) 7.50 29.14 OK
E-1 (CEMENT MILL ) 7.50 97.78 OK
F-1 (CEMENT MILL BAGHOUSE) K-1 (WORKERS REST) 7.50 98.55 OK
M-1 (TOILET BLOCK) 7.50 127.27 OK
D-1 (CEMENT MILL HOPPER) 7.50 133.98 OK
C-1 (BRU AND TRUCK TIPPLER) 7.50 129.50 OK
L-1 (SITE OFFICE) 7.50 95.65 OK
C-1 (BRU AND TRUCK TIPPLER) K-1 (WORKERS REST) 7.50 163.65 OK
M-1 (TOILET BLOCK) 7.50 20.86 OK
D-1 (CEMENT MILL HOPPER) 7.50 74.03 OK
J-1 (PACKING PLANT) 7.50 100.98 OK
F-1 (CEMENT MILL BAGHOUSE) 7.50 129.50 OK
FLY-1 (ASH) 7.50 100.45 OK
L-1 (SITE OFFICE) 7.50 100.77 OK
G-1 (FBC) 7.50 142.90 OK
I-1 (CEMENT SILO) 7.50 169.05 OK
A-1 (ADDITIVE STOCK PILE SHED) 7.50 120.59 OK
E-1 (CEMENT MILL ) 7.50 93.65 OK
G-1 (FBC) K-1 (WORKERS REST) 7.50 118.06 OK
M-1 (TOILET BLOCK) 7.50 142.61 OK
D-1 (CEMENT MILL HOPPER) 7.50 139.30 OK
C-1 (BRU AND TRUCK TIPPLER) 7.50 142.90 OK
L-1 (SITE OFFICE) 7.50 110.60 OK
M-1 (TOILET BLOCK) K-1 (WORKERS REST) 7.50 136.57 OK
D-1 (CEMENT MILL HOPPER) 7.50 113.93 OK
J-1 (PACKING PLANT) 7.50 85.17 OK
F-1 (CEMENT MILL BAGHOUSE) 7.50 127.27 OK
FLY-1 (ASH) 7.50 118.26 OK
C-1 (BRU AND TRUCK TIPPLER) 7.50 20.86 OK
L-1 (SITE OFFICE) 7.50 73.69 OK
G-1 (FBC) 7.50 142.61 OK
I-1 (CEMENT SILO) 7.50 157.27 OK
A-1 (ADDITIVE STOCK PILE SHED) 7.50 147.89 OK
E-1 (CEMENT MILL ) 7.50 98.78 OK
L-1 (SITE OFFICE) K-1 (WORKERS REST) 7.50 40.40 OK
M-1 (TOILET BLOCK) 7.50 73.69 OK
D-1 (CEMENT MILL HOPPER) 7.50 162.63 OK
J-1 (PACKING PLANT) 7.50 34.61 OK
F-1 (CEMENT MILL BAGHOUSE) 7.50 95.65 OK
FLY-1 (ASH) 7.50 117.70 OK
C-1 (BRU AND TRUCK TIPPLER) 7.50 100.77 OK
G-1 (FBC) 7.50 110.60 OK
I-1 (CEMENT SILO) 7.50 93.45 OK
A-1 (ADDITIVE STOCK PILE SHED) 7.50 139.66 OK
E-1 (CEMENT MILL ) 7.50 83.09 OK
K-1 (WORKERS REST) M-1 (TOILET BLOCK) 7.50 136.57 OK
D-1 (CEMENT MILL HOPPER) 7.50 216.85 OK
J-1 (PACKING PLANT) 7.50 34.38 OK
F-1 (CEMENT MILL BAGHOUSE) 7.50 98.55 OK
FLY-1 (ASH) 7.50 151.69 OK
C-1 (BRU AND TRUCK TIPPLER) 7.50 163.65 OK
L-1 (SITE OFFICE) 7.50 40.40 OK
G-1 (FBC) 7.50 118.06 OK
I-1 (CEMENT SILO) 7.50 87.24 OK
A-1 (ADDITIVE STOCK PILE SHED) 7.50 138.32 OK
E-1 (CEMENT MILL ) 7.50 104.19 OK
J-1 (PACKING PLANT) K-1 (WORKERS REST) 7.50 34.38 OK
M-1 (TOILET BLOCK) 7.50 85.17 OK
D-1 (CEMENT MILL HOPPER) 7.50 130.03 OK
C-1 (BRU AND TRUCK TIPPLER) 7.50 100.98 OK
L-1 (SITE OFFICE) 7.50 34.61 OK
I-1 (CEMENT SILO) K-1 (WORKERS REST) 7.50 87.24 OK
M-1 (TOILET BLOCK) 7.50 157.27 OK
D-1 (CEMENT MILL HOPPER) 7.50 178.12 OK
C-1 (BRU AND TRUCK TIPPLER) 7.50 169.05 OK
L-1 (SITE OFFICE) 7.50 93.45 OK
FLY-1 (ASH) K-1 (WORKERS REST) 7.50 151.69 OK
M-1 (TOILET BLOCK) 7.50 118.26 OK
D-1 (CEMENT MILL HOPPER) 7.50 73.74 OK
C-1 (BRU AND TRUCK TIPPLER) 7.50 100.45 OK
L-1 (SITE OFFICE) 7.50 117.70 OK






[-] Inner Building Details (Table 6)
   

No OTS/Duct/VShaft/Balcony/Passage/Lift/Tenements Found.
   


[-] Parking Details (Table 7)
   
[-] Required Parking(Table 7a)
Building Name Type SubUse Area (Sq.mt.) Units Car TwoWheeler
Reqd. Prop. Reqd./Unit Reqd. Prop. Reqd./Unit Reqd. Prop.
A (ADDITIVE STOCK PILE SHED) Industrial Industrial Building > 0 400 11832.00 1 20 - - - -
> 0 400 11832.00 - - - 1 62 -
E (CEMENT MILL ) Industrial Industrial Building > 0 400 3327.23 1 6 - - - -
> 0 400 3327.23 - - - 1 18 -
D (CEMENT MILL HOPPER) Industrial Industrial Building > 0 400 2013.14 1 4 - - - -
> 0 400 2013.14 - - - 1 11 -
F (CEMENT MILL BAGHOUSE) Industrial Industrial Building > 0 400 1001.52 1 2 - - - -
> 0 400 1001.52 - - - 1 6 -
C (BRU AND TRUCK TIPPLER) Industrial Industrial Building > 0 400 590.17 1 1 - - - -
> 0 400 590.17 - - - 1 4 -
G (FBC) Industrial Industrial Building > 0 400 796.89 1 2 - - - -
> 0 400 796.89 - - - 1 5 -
M (TOILET BLOCK) Industrial Industrial Building > 0 400 26.35 1 1 - - - -
> 0 400 26.35 - - - 1 1 -
L (SITE OFFICE) Industrial Industrial Building > 0 400 268.19 1 1 - - - -
> 0 400 268.19 - - - 1 2 -
K (WORKERS REST) Industrial Industrial Building > 0 400 270.01 1 1 - - - -
> 0 400 270.01 - - - 1 2 -
J (PACKING PLANT) Industrial Industrial Building > 0 400 6552.53 1 11 - - - -
> 0 400 6552.53 - - - 1 35 -
I (CEMENT SILO) Industrial Industrial Building > 0 400 579.29 1 1 - - - -
> 0 400 579.29 - - - 1 4 -
FLY (ASH) Industrial Industrial Building > 0 400 328.04 1 1 - - - -
> 0 400 328.04 - - - 1 2 -
Total : - - - - 51 61 - 152 280

[-] Parking Check (Table 7b)
Vehicle Type Reqd. Prop. Status
No. Area No. Area
Car - - 61 762.50 OK
Total Car 51 637.50 61 762.50 OK
TwoWheeler - - 280 560.00 OK
Total TwoWheeler 152 304.00 280 560.00 OK
Total 941.50 1882.50 OK

Individual Parking Checks (Table 7c)
Dimensions and Area for all Vehicle(s) are as per the Rules

[-] Driveway Parking Checks (Table 7d)
Building/Plot Name Floor Name Driveway Name Width Status
Reqd Perm Prop
PLOT - DRIVEWAY 3.00 - 12.31 OK
DRIVEWAY - - 6.10 OK
DRIVEWAY 4.50 - 20.60 OK
DRIVEWAY - - 15.24 OK
DRIVEWAY - - 13.52 OK
DRIVEWAY 4.50 - 5.00 OK
DRIVEWAY 4.50 - 5.00 OK
DRIVEWAY 3.00 - 3.60 OK
DRIVEWAY 3.00 - 3.60 OK
DRIVEWAY 3.00 - 3.60 OK
DRIVEWAY 3.00 - 3.60 OK
DRIVEWAY - - 5.00 OK
DRIVEWAY - - 13.52 OK

   


[-] Exemption Details (Table 8)
   


Not Required to Check StairCase Number Rule.


[-] Staircase Checks (Table 8a-1)


No Staircase Found


No Staircase Found


[-] For Building :D (CEMENT MILL HOPPER)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN STAIRCASE 0.900 0.963 0.250 0.250 0.200 0.140 - 16 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.900 0.963 0.250 0.250 0.200 0.141 - 16 - - 0.000 OK
SECOND FLOOR PLAN STAIRCASE 0.900 0.963 0.250 0.250 0.200 0.125 - 16 - - 0.000 OK
THIRD FLOOR PLAN STAIRCASE 0.900 0.963 0.250 0.250 0.200 0.186 - 21 - - 0.000 OK
FOURTH FLOOR PLAN STAIRCASE 0.900 0.963 0.250 0.250 0.200 0.200 - 25 - - 0.000 OK
FIFTH FLOOR PLAN STAIRCASE 0.900 0.963 0.250 0.250 0.200 0.156 - 16 - - 0.000 OK
SIXTH FLOOR PLAN STAIRCASE 0.900 0.963 0.250 0.250 0.200 0.119 - 16 - - 0.000 OK

[-] For Building :E (CEMENT MILL )
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN STAIRCASE 0.900 1.050 0.250 0.250 0.200 0.198 - 3 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.900 1.050 0.250 0.250 0.200 0.087 - 24 - - 0.000 OK
SECOND FLOOR PLAN STAIRCASE 0.900 1.050 0.250 0.250 0.200 0.104 - 24 - - 0.000 OK
THIRD FLOOR PLAN STAIRCASE 0.900 1.050 0.250 0.250 0.200 0.142 - 24 - - 0.000 OK
FOURTH FLOOR PLAN STAIRCASE 0.900 1.050 0.250 0.250 0.200 0.125 - 24 - - 0.000 OK
FIFTH FLOOR PLAN STAIRCASE 0.900 1.050 0.250 0.250 0.200 0.108 - 24 - - 0.000 OK
SIXTH FLOOR PLAN STAIRCASE 0.900 1.050 0.250 0.250 0.200 0.196 - 6 - - 0.000 OK

[-] For Building :F (CEMENT MILL BAGHOUSE)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN STAIRCASE 0.750 1.050 0.225 0.250 0.200 0.194 - 6 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.750 1.050 0.225 0.250 0.200 0.161 - 4 - - 0.000 OK

[-] For Building :FLY (ASH)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN STAIRCASE 0.750 1.150 0.225 0.250 0.200 0.196 - 14 - - 0.000 OK

[-] For Building :G (FBC)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN STAIRCASE 0.900 1.100 0.250 0.250 0.200 0.101 - 4 - - 0.000 OK
STAIRCASE 0.900 1.000 0.250 0.250 0.200 0.137 - 14 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.900 1.000 0.250 0.250 0.200 0.194 - 15 - - 0.000 OK
STAIRCASE 0.900 1.100 0.250 0.250 0.200 0.146 - 4 - - 0.000 OK
SECOND FLOOR PLAN STAIRCASE 0.900 1.000 0.250 0.250 0.200 0.189 - 14 - - 0.000 OK
STAIRCASE 0.900 1.100 0.250 0.250 0.200 0.139 - 4 - - 0.000 OK
THIRD FLOOR PLAN STAIRCASE 0.900 1.100 0.250 0.250 0.200 0.194 - 4 - - 0.000 OK

No Staircase Found


[-] For Building :J (PACKING PLANT)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN STAIRCASE 0.900 1.150 0.250 0.250 0.200 0.119 - 3 - - 0.000 OK
SECOND FLOOR PLAN STAIRCASE 0.900 1.150 0.250 0.250 0.200 0.115 - 3 - - 0.000 OK
FOURTH FLOOR PLAN STAIRCASE 0.900 1.150 0.250 0.250 0.200 0.158 - 3 - - 0.000 OK
FIFTH FLOOR PLAN STAIRCASE 0.900 1.150 0.250 0.250 0.200 0.163 - 12 - - 0.000 OK
THIRD FLOOR PLAN STAIRCASE 0.900 1.150 0.250 0.250 0.200 0.160 - 12 - - 0.000 OK
SIXTH FLOOR PLAN STAIRCASE 0.900 1.150 0.250 0.250 0.200 0.189 - 34 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.900 1.150 0.250 0.250 0.200 0.115 - 3 - - 0.000 OK

No Staircase Found


No Staircase Found


No Staircase Found


   
   
   
[-] Accessory Use Check (Table 8d)
Accessory Use Name Area Width Depth Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
CLINKER SILO - - 777.97 - - 31.42 - - 31.49 - - 0.00 OK
Toilet - 5.00 3.83 - - 1.48 - - 2.60 - - 0.00 OK
RAIN WATER HARVESTING - - 16.30 - - 4.55 - - 4.56 - - 0.00 OK
Fire SUMP - - 61.11 - - 6.13 - - 9.98 - - 0.00 OK
ENT.GATE - - 0.63 - - 0.13 - - 5.01 - - 0.00 OK
Under ground water tank - - 61.11 - - 6.13 - - 9.98 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.02 - - 1.89 - - 2.13 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.02 - - 1.89 - - 2.13 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.02 - - 1.89 - - 2.13 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.02 - - 1.89 - - 2.13 - - 0.00 OK
SOLAR HEATING SYSTEM - - 0.16 - - 0.38 - - 0.43 - - 0.00 OK
SOLAR HEATING SYSTEM - - 0.16 - - 0.38 - - 0.43 - - 0.00 OK
SOLAR HEATING SYSTEM - - 0.16 - - 0.38 - - 0.43 - - 0.00 OK
SOLAR HEATING SYSTEM - - 0.16 - - 0.38 - - 0.43 - - 0.00 OK
SOLAR HEATING SYSTEM - - 0.16 - - 0.38 - - 0.43 - - 0.00 OK
SOLAR HEATING SYSTEM - - 0.16 - - 0.38 - - 0.43 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.02 - - 1.89 - - 2.13 - - 0.00 OK





[-] Accessory Use No. Checks
Building Name Accessory Use Name No Status
Reqd Perm Prop
A (ADDITIVE STOCK PILE SHED) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
E (CEMENT MILL ) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
D (CEMENT MILL HOPPER) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
F (CEMENT MILL BAGHOUSE) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
C (BRU AND TRUCK TIPPLER) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
G (FBC) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
M (TOILET BLOCK) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
L (SITE OFFICE) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
K (WORKERS REST) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
J (PACKING PLANT) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
I (CEMENT SILO) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
FLY (ASH) Rain Water Harvesting 1 - 1 OK
Toilet 1 - 1 OK
Entrance Gate 1 - 1 OK
   
   


[-] Floor Details (Table 9)
   

[-] Building:A (ADDITIVE STOCK PILE SHED)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:C (BRU AND TRUCK TIPPLER)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:D (CEMENT MILL HOPPER)


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Floor:FIRST FLOOR PLAN



No Room Found.

[-] Floor:SECOND FLOOR PLAN



No Room Found.

[-] Floor:THIRD FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:FOURTH FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:FIFTH FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:SIXTH FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:E (CEMENT MILL )


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Floor:FIRST FLOOR PLAN



No Room Found.

[-] Floor:SECOND FLOOR PLAN



No Room Found.

[-] Floor:THIRD FLOOR PLAN



No Room Found.

[-] Floor:FOURTH FLOOR PLAN



No Room Found.

[-] Floor:FIFTH FLOOR PLAN



No Room Found.

[-] Floor:SIXTH FLOOR PLAN



No Room Found.

[-] Building:F (CEMENT MILL BAGHOUSE)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:FIRST FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:FLY (ASH)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:G (FBC)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:FIRST FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:SECOND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:THIRD FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:I (CEMENT SILO)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:J (PACKING PLANT)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:SECOND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:FOURTH FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:FIFTH FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:THIRD FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:SIXTH FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:FIRST FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:K (WORKERS REST)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:L (SITE OFFICE)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:M (TOILET BLOCK)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.


   


[-] Summary (Table 10)
   
Name Perm./Reqd. Proposed Status
  Plot Area - 63736.68 OK
  Plot Width - 266.74 OK
  Plot Depth - 238.95 OK
  Access Width 9.00 24.38 OK
  Plot Frontage - 39.53 OK
  Coverage Area 31868.34 17881.39 OK
  FAR Area
Bldg. FAR Area : 27585.37
Sanctioned FAR Area :0.00
127473.36 27585.37 OK





[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Width No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Depth No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Access Width The minimum width of abutting road for Institutional, administrative, assembly, industrial and other Nonresidential and commercial activities shall be 9.0 mt.{As per Rule no. 34.5 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Plot Frontage No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
FAR Area (1) For Industrial buildings non-polluting and household, the Floor Area Ratio-FAR shall be 2.0 {As per Rule No. 39.5}
(2) 0.0
Consumed FAR (1) For Industrial buildings non-polluting and household, the Floor Area Ratio-FAR shall be 2.0 {As per Rule No. 39.5}
(2) 0.0
Common Plot Area In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
Common Plot (1) ;
(2) ;
(3) ; ;
Tree Number Mini. 8 Trees shall be required for the Plot area above 1000.0 sq.mt. (As per Rule No. 20.1.6)
DriveWay Rule (1) The minimum width of the drive way meant exclusively for 2 wheelers should be 3.0 mt {As per Rule No. 41.2}
(2) For Plor area above 2000 sq.mt., The minimum width or driveways should not be less than 4.50 mt. {As per Rule No. 41.2 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Margin Rule (1) For Multistoried Building, having Building Height 23.10-30.0 mt.,Margin required in Front shall be 8.0 mt., Rear 5.0 mt. and 5.0 mt. shall be provided on both side. {As per Rule No. 37 Table 14}
(2) In case of buildings of more than 30m height, for every increase in height of 6.7 m. or fraction thereof or addition of two floor, 1m. in the front set back and 0.75 m. in the sides and rear setbacks shall be added {As per Rule No. 37 Table 14 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
(3) For Multistoried Building, having Building Height 16.40-19.25 mt.,Margin required in Front shall be 6.5 mt., Rear 4.5 mt. and 4.5 mt. shall be provided on both side. {As per Rule No. 37 Table 14}
PWork to PWork Margin Reqd Building to Building margin shall be 6 mt. or 1.5 times side setback required for the taller block whichever is high {As per Rule No. 38.1}
Building Level
Floor Height (1) No rule found for Mini. reqd Floor height
(2) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
Parapet Height Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Floor Number No Rule Defined
StairCase (1) Width of Winding staircase shall be mini. 0.90 mt.,Maximum rise 0.20 mt. & Minimum tread 0.25 mt. & Cabin Height 2.1 mt. {As per Rule No. 83.18}
(2) ; No Rule Defined
(3) Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. {As per Rule No. 83.18}
(4) ; No Rule Defined
Plot / Building Level
Accessory Use (1) Electric cabin or substation of maximum size of 4 sq.m. with minimum width or diameter of 2 m
(2) No need to check distance from Building CLINKER SILO
(3) Common toilet of maximum size of 5 sq.mt shall be taken Free from FAR
(4) No need to check distance from Building Toilet
(5) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(6) No need to check distance from Building RAIN WATER HARVESTING
(7) -
(8) No need to check distance from Building Fire SUMP
(9) No need to check distance from Building ENT.GATE
(10) -
(11) No need to check distance from Building Under ground water tank
(12) -
(13) No need to check distance from Building SOLAR HEATING SYSTEM
Accessory Use Number (1) Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
(2) Provision of toilets for visitors and separate toilets for guards and drivers shall be provided for Multistoried for Commercial and multidwelling units including Apartments Toilet
(3) In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premise shall not be less than 5 (five) meters i n width in order to allow easy access to fire engine Entrance Gate
Building Level (Rooms)