Detail Scrutiny Report

JHARKHAND INDUSTRIAL AREA DEVELOPMENT AUTHORITY

Version Number: 1.0.62  
Version Date: 16/10/2020 
Report Generated On: 18-04-2022 
 
[-] Collapse All


General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictRANCHI
AuthorityJHARKHAND INDUSTRIAL AREA DEVELOPMENT AUTHORITY
Inward_NoJIADA/BP/0007/2022
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaNew Area
City Area/TPScheme NoNA
VillageMURGAGHUTU
Taluka0
Architect Details
Architect NameNikhil Jain
License No.JIADA/ARC/0001/2018
Architect AddressBothra Bhawan, Opposite Indra Place, Main Road, Hinoo
Architect EmailIDbdpranchi@gmail.com
Architect Mobile No8087667001
Plot Details
Plot Use Industrial
Plot SubUse Industrial Building
PlotNearbyReligiousStructure NA
Plot/SubPlot NoIndustrial Plot No. M-1, Survey Plot No. 55P, 70P, 76P, 77P, 78P, 79P, 80P, 81P, 82P, 83P, 84P, 88P, 59/138P, 76/139P
NorthSurvey No. - Survey Plot No. 76/139(P), 70(P), 80(P)
SouthSurvey No. - 88(P)
EastSurvey No. - 80(P), 79(P), 78(P), 82(P), 81(P)
WestSurvey No. - 76/139(P), 70(P), 76(P), 85(P), 84(P), 88(P)
Owner's Details
NameMr Madhavan Varadarajan
AddressPlot No. M-1, Mauza Murgaghutu, Block Musabini, East Singhbhum, Jharkhand
Email IDkameswaran.s@axlesindia.com
Mobile No9934123420
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 24281.10
2 Plot area as per Document by Applicant 24281.10
3 Physical area measured at site 24281.10
4 Area as per Site Visit (Site Visit Report) 24281.10
5Area as per Drawing 24281.02

Area of Plot Considered : 24281.02

[-] Table 2b
Proposal Detail :
UnitMeters
Development Detail :
PlotPLOT
Plot OccupancyIndustrial
Plot SubUse Industrial Building
Building StructureNon-Highrise
Building TypeSingle Detached House
Gross Plot Area 24281.02
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 24281.02
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 21832.69
Deductions for Balance Plot Area (from Gross Plot Area)
- Common Plot 2448.33
2448.33
Balance Plot Area 21832.69

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 50.00 % ) 12140.51
Proposed Coverage Area ( 24.74 % ) 6008.01
Total Prop. Coverage Area ( 24.74 % ) 6008.01
Balance coverage area ( 25.26 % ) 6132.50
FAR CHECK
Perm. FAR Area ( 2.00 ) 48562.04
Total Perm. FAR area 48562.04
Industrial FAR 6498.68
Proposed FAR Area 6498.68
Total Proposed FAR Area 6498.68
Consumed FAR (Factor) 0.27
Balance FAR Area 42063.36
BUA CHECK
Total Proposed BuiltUp Area 6498.68


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Exceeding 100 meter and upto 250 meter -
Existing Road Width 30.4 30.40
Proposed Road Width as per Master Plan 0 -
Road Widening Width 0 -
Plot size (as per measurement) 24281.1 24281.02
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK


[-] Plot Level Checking (Table 3)
   
[-] Common Plot Checks (Table 3b)
Name Total Area Status
Reqd Prop
Common Plot 2428.10 2448.33 OK


[-] Common Plot Checks (Table 3b)
Name Minimum Area Access Status
Reqd Prop
Normal Open Space - 123.94 No Access Provided OK
Normal Open Space - 224.56 No Access Provided OK
Normal Open Space - 778.48 No Access Provided OK
Normal Open Space - 1321.34 No Access Provided OK


   
   
[-] Tree Details (Table 3g)
Name Nos Of Trees Status
Reqd Prop
Tree 8 24 OK
   
   
   
   
   


[-] Building Details (Table 4)
   
[-] Building USE/SUBUSE Details Building USE/SUBUSE Details
Building Name Building Use Building SubUse Building Structure
A (CANTEEN) Industrial Industrial Building Non-Highrise
A (SUBSTATION) Industrial Industrial Building Non-Highrise
A (SCRAP SHED) Industrial Industrial Building Non-Highrise
A (FORK LIFT) Industrial Industrial Building Non-Highrise
A (GUARD) Industrial Industrial Building Non-Highrise
A (PRESS) Industrial Industrial Building Non-Highrise
A (MAIN FACTORY) Industrial Industrial Building Non-Highrise
   
   
   
[-] Height Details (4a)



[-] Total Height (Table 4a-1)
Building Height (From GL) Height (From Street LVL) Status
A (CANTEEN) 7.30 7.30 OK
A (SUBSTATION) 6.98 6.98 OK
A (SCRAP SHED) 5.82 5.82 OK
A (FORK LIFT) 5.82 5.82 OK
A (GUARD) 3.00 3.00 OK
A (PRESS) 14.38 14.38 OK
A (MAIN FACTORY) 9.04 9.04 OK


   
   
[-] Floor Height Check (Table 4a-2)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
A (CANTEEN) Ground Floor 2.75 - 7.30 2.75 - 7.18 2.40 - 7.03 OK
Plinth 0.45 - 0.61 - - 0.61 - - 0.61 OK
A (SUBSTATION) Ground Floor 2.75 - 6.98 2.75 - 6.85 2.40 - 6.70 OK
Plinth 0.45 - 0.61 - - 0.61 - - 0.61 OK
A (SCRAP SHED) Ground Floor 2.75 - 5.82 2.75 - 5.70 2.40 - 5.55 OK
Plinth 0.45 - 0.61 - - 0.61 - - 0.61 OK
A (FORK LIFT) Ground Floor 2.75 - 5.82 2.75 - 5.70 2.40 - 5.55 OK
Plinth 0.45 - 0.61 - - 0.61 - - 0.61 OK
A (GUARD) Ground Floor 2.75 - 3.00 2.75 - 2.88 2.40 - 2.73 OK
Plinth 0.45 - 0.61 - - 0.61 - - 0.61 OK
A (PRESS) Ground Floor 2.75 - 14.38 2.75 - 14.26 2.40 - 14.11 OK
Plinth 0.45 - 0.61 - - 0.61 - - 0.61 OK
A (MAIN FACTORY) Second Floor 2.75 - 3.04 2.75 - 2.92 2.40 - 2.77 OK
First Floor 2.75 - 3.00 2.75 - 2.88 2.40 - 2.73 OK
Ground Floor 2.75 - 3.00 2.75 - 2.88 2.40 - 2.73 OK
Plinth 0.45 - 0.61 - - 0.61 - - 0.61 OK


[-] Parapet Height Check (Table 4a-2.1)
Building Name Floor Name Height Status
Reqd Perm Prop
A (CANTEEN) Terrace Floor - - 1.00 OK
A (SUBSTATION) Terrace Floor - - 1.00 OK
A (SCRAP SHED) Terrace Floor - - 1.00 OK
A (FORK LIFT) Terrace Floor - - 1.00 OK
A (GUARD) Terrace Floor - - 1.00 OK
A (PRESS) Terrace Floor - - 1.00 OK
A (MAIN FACTORY) Terrace Floor - - 1.20 OK
   
   
   
[-] Floor Number Check (Table 4a-4)
Building Name No. of Floors No. of Tenements Status
Perm Prop Perm Prop
A (CANTEEN) - 1 - 1 OK
A (SUBSTATION) - 1 - 1 OK
A (SCRAP SHED) - 1 - 1 OK
A (FORK LIFT) - 1 - 1 OK
A (GUARD) - 1 - 1 OK
A (PRESS) - 1 - 1 OK
A (MAIN FACTORY) - 3 - 3 OK

 
   
    [-] Coverage Check (Table 4b)
Permissible Proposed Status
12140.51 6008.01 OK
50% 24.74%

[-] Individual Coverage Check
Coverage Area Perm. Prop.
  A-1 (CANTEEN) - 360.00
  A-1 (SUBSTATION) - 260.40
  A-1 (SCRAP SHED) - 96.00
  A-1 (FORK LIFT) - 96.00
  A-1 (GUARD) - 23.62
  A-1 (PRESS) - 1044.60
  A-1 (MAIN FACTORY) - 4127.39
  Total Prop. Coverage Area - 6008.01
  Total Coverage Area 12140.51 6008.01

[-] FAR & Tenement Details (Table 4c-1)
Building No. of Same Bldg Gross Built Up Area (Sq.mt.) Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Cutout Industrial
A (CANTEEN) 1 360.00 0.00 360.00 360.00 360.00 360.00 01
A (SUBSTATION) 1 260.40 0.00 260.40 260.40 260.40 260.40 01
A (SCRAP SHED) 1 96.00 0.00 96.00 96.00 96.00 96.00 01
A (FORK LIFT) 1 96.00 0.00 96.00 96.00 96.00 96.00 01
A (GUARD) 1 23.62 0.00 23.62 23.62 23.62 23.62 01
A (PRESS) 1 1332.67 288.07 1044.60 1044.60 1044.60 1044.60 01
A (MAIN FACTORY) 1 4618.06 0.00 4618.06 4618.06 4618.06 4618.06 03
Grand Total : 7 6786.75 288.07 6498.68 6498.68 6498.68 6498.68 09


[-] Buildingwise Floor FAR Details
Floor Name Building Name Total
A (CANTEEN) A (SUBSTATION) A (SCRAP SHED) A (FORK LIFT) A (GUARD) A (PRESS) A (MAIN FACTORY)
Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total Proposed Built Up Area (Sq.mt.) Total FAR Area (Sq.mt.)
Ground Floor 360.00 360.00 260.40 260.40 96.00 96.00 96.00 96.00 23.62 23.62 1044.60 1044.60 4127.39 4127.39 6008.01 6008.01
First Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 292.88 292.88 292.88 292.88
Second Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 197.79 197.79 197.79 197.79
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total : 360.00 360.00 260.40 260.40 96.00 96.00 96.00 96.00 23.62 23.62 1044.60 1044.60 4618.06 4618.06 6498.68 6498.68


[-] UnitBUA Table for Building :A (CANTEEN)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN GROUND -01 OTHER 360.00 336.91 2 1
Total: - - 360.00 336.91 2 1
[-] UnitBUA Table for Building :A (SUBSTATION) UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN GROUND -01 OTHER 260.40 245.25 0 1
Total: - - 260.40 245.25 0 1
[-] UnitBUA Table for Building :A (SCRAP SHED)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN GROUND -01 OTHER 96.00 88.06 1 1
Total: - - 96.00 88.06 1 1
[-] UnitBUA Table for Building :A (FORK LIFT)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN GROUND -01 OTHER 96.00 88.06 1 1
Total: - - 96.00 88.06 1 1
[-] UnitBUA Table for Building :A (GUARD)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN GROUND -01 OTHER 23.62 22.61 1 1
Total: - - 23.62 22.61 1 1
[-] UnitBUA Table for Building :A (PRESS)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN GROUND -01 OTHER 1044.60 992.90 3 1
Total: - - 1044.60 992.90 3 1
[-] UnitBUA Table for Building :A (MAIN FACTORY)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN GROUND -01 OTHER 4127.39 4026.29 12 1
FIRST FLOOR PLAN 03 OTHER 292.88 273.45 9 1
SECOND FLOOR PLAN FIRST OTHER 197.79 181.35 5 1
Total: - - 4618.06 4481.09 26 3


[-] Building :A (CANTEEN)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 360.00 360.00 360.00 360.00 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 360.00 360.00 360.00 360.00 01
Total Number of Same Buildings : 1
Total : 360.00 360.00 360.00 360.00 01

[-] Building :A (SUBSTATION)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 260.40 260.40 260.40 260.40 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 260.40 260.40 260.40 260.40 01
Total Number of Same Buildings : 1
Total : 260.40 260.40 260.40 260.40 01

[-] Building :A (SCRAP SHED)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 96.00 96.00 96.00 96.00 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 96.00 96.00 96.00 96.00 01
Total Number of Same Buildings : 1
Total : 96.00 96.00 96.00 96.00 01

[-] Building :A (FORK LIFT)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 96.00 96.00 96.00 96.00 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 96.00 96.00 96.00 96.00 01
Total Number of Same Buildings : 1
Total : 96.00 96.00 96.00 96.00 01

[-] Building :A (GUARD)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 23.62 23.62 23.62 23.62 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 23.62 23.62 23.62 23.62 01
Total Number of Same Buildings : 1
Total : 23.62 23.62 23.62 23.62 01

[-] Building :A (PRESS)
Floor Name Gross Builtup Area Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Cutout Industrial
Ground Floor 1332.67 288.07 1044.60 1044.60 1044.60 1044.60 01
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 00
Total : 1332.67 288.07 1044.60 1044.60 1044.60 1044.60 01
Total Number of Same Buildings : 1
Total : 1332.67 288.07 1044.60 1044.60 1044.60 1044.60 01

[-] Building :A (MAIN FACTORY)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 4127.39 4127.39 4127.39 4127.39 01
First Floor 292.88 292.88 292.88 292.88 01
Second Floor 197.79 197.79 197.79 197.79 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 4618.06 4618.06 4618.06 4618.06 03
Total Number of Same Buildings : 1
Total : 4618.06 4618.06 4618.06 4618.06 03
[-] Table 4c-2

  FAR Area
Building FAR Area:6498.68
Existing FAR Area :0.00
Perm.
48562.04
Prop.
6498.68
Status
OK




[-] Margin Checks (Table 5)
   
[-] Plot Margin (Table 5a)
Building / Wing Road Name Front Side Rear Side Side1 Side2 Status
Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop.
A-1 (CANTEEN) 30.4 M ROAD 12.00 158.25 9.00 33.22 9.00 91.01 9.00 9.81 OK
A-1 (FORK LIFT) 30.4 M ROAD 12.00 97.34 9.00 118.82 9.00 90.79 9.00 13.93 OK
A-1 (GUARD) 30.4 M ROAD 12.00 12.85 9.00 209.40 9.00 53.22 9.00 11.18 OK
A-1 (MAIN FACTORY) 30.4 M ROAD 12.00 50.75 9.00 57.68 9.00 39.74 9.00 16.05 OK
A-1 (PRESS) 30.4 M ROAD 12.00 72.90 9.00 57.64 9.00 9.04 9.00 62.76 OK
A-1 (SCRAP SHED) 30.4 M ROAD 12.00 204.09 9.00 9.41 9.00 37.86 9.00 67.59 OK
A-1 (SUBSTATION) 30.4 M ROAD 12.00 60.29 9.00 147.75 9.00 89.75 9.00 10.22 OK



[-] Building To Building Margin Check (Table 5b)
From Wing To Wing Margin Status
Reqd Prop
A-1 (CANTEEN) A-1 (PRESS) 13.50 63.02 OK
A-1 (SUBSTATION) 13.50 79.28 OK
A-1 (GUARD) 13.50 139.97 OK
A-1 (FORK LIFT) 13.50 50.08 OK
A-1 (SCRAP SHED) 13.50 53.65 OK
A-1 (MAIN FACTORY) 13.50 13.50 OK
A-1 (SUBSTATION) A-1 (PRESS) 13.50 63.82 OK
A-1 (GUARD) 13.50 47.58 OK
A-1 (FORK LIFT) 13.50 17.20 OK
A-1 (CANTEEN) 13.50 79.28 OK
A-1 (SCRAP SHED) 13.50 144.42 OK
A-1 (MAIN FACTORY) 13.50 14.01 OK
A-1 (SCRAP SHED) A-1 (PRESS) 13.50 35.09 OK
A-1 (SUBSTATION) 13.50 144.42 OK
A-1 (GUARD) 13.50 193.37 OK
A-1 (FORK LIFT) 13.50 117.57 OK
A-1 (CANTEEN) 13.50 53.65 OK
A-1 (MAIN FACTORY) 13.50 42.01 OK
A-1 (FORK LIFT) A-1 (PRESS) 13.50 63.73 OK
A-1 (SUBSTATION) 13.50 17.20 OK
A-1 (GUARD) 13.50 80.73 OK
A-1 (CANTEEN) 13.50 50.08 OK
A-1 (SCRAP SHED) 13.50 117.57 OK
A-1 (MAIN FACTORY) 13.50 14.21 OK
A-1 (GUARD) A-1 (PRESS) 13.50 69.46 OK
A-1 (SUBSTATION) 13.50 47.58 OK
A-1 (FORK LIFT) 13.50 80.73 OK
A-1 (CANTEEN) 13.50 139.97 OK
A-1 (SCRAP SHED) 13.50 193.37 OK
A-1 (MAIN FACTORY) 13.50 36.15 OK
A-1 (PRESS) A-1 (SUBSTATION) 13.50 63.82 OK
A-1 (GUARD) 13.50 69.46 OK
A-1 (FORK LIFT) 13.50 63.73 OK
A-1 (CANTEEN) 13.50 63.02 OK
A-1 (SCRAP SHED) 13.50 35.09 OK
A-1 (MAIN FACTORY) 13.50 13.52 OK
A-1 (MAIN FACTORY) A-1 (PRESS) 13.50 13.52 OK
A-1 (SUBSTATION) 13.50 14.01 OK
A-1 (GUARD) 13.50 36.15 OK
A-1 (FORK LIFT) 13.50 14.21 OK
A-1 (CANTEEN) 13.50 13.50 OK
A-1 (SCRAP SHED) 13.50 42.01 OK






[-] Inner Building Details (Table 6)
   

No OTS/Duct/VShaft/Balcony/Passage/Lift/Tenements Found.
   


[-] Parking Details (Table 7)
   
[-] Required Parking(Table 7a)
Building Name Type SubUse Area (Sq.mt.) Units Car TwoWheeler
Reqd. Prop. Reqd./Unit Reqd. Prop. Reqd./Unit Reqd. Prop.
A (CANTEEN) Industrial Industrial Building > 0 400 360.00 1 1 - - - -
> 0 400 360.00 - - - 1 2 -
A (SUBSTATION) Industrial Industrial Building > 0 400 260.40 1 1 - - - -
> 0 400 260.40 - - - 1 2 -
A (SCRAP SHED) Industrial Industrial Building > 0 400 96.00 1 1 - - - -
> 0 400 96.00 - - - 1 1 -
A (FORK LIFT) Industrial Industrial Building > 0 400 96.00 1 1 - - - -
> 0 400 96.00 - - - 1 1 -
A (GUARD) Industrial Industrial Building > 0 400 23.62 1 1 - - - -
> 0 400 23.62 - - - 1 1 -
A (PRESS) Industrial Industrial Building > 0 400 1044.60 1 2 - - - -
> 0 400 1044.60 - - - 1 6 -
A (MAIN FACTORY) Industrial Industrial Building > 0 400 4618.06 1 8 - - - -
> 0 400 4618.06 - - - 1 25 -
Total : - - - - 15 23 - 38 44

[-] Parking Check (Table 7b)
Vehicle Type Reqd. Prop. Status
No. Area No. Area
Car - - 23 287.50 OK
Total Car 15 187.50 23 287.50 OK
TwoWheeler - - 44 88.00 OK
Total TwoWheeler 38 76.00 44 88.00 OK
Total 263.50 463.50 OK

Individual Parking Checks (Table 7c)
Dimensions and Area for all Vehicle(s) are as per the Rules

[-] Driveway Parking Checks (Table 7d)
Building/Plot Name Floor Name Driveway Name Width Status
Reqd Perm Prop
PLOT - DRIVEWAY - - 5.00 OK
DRIVEWAY - - 5.00 OK
DRIVEWAY 3.00 - 3.60 OK
DRIVEWAY - - 5.00 OK

   


[-] Exemption Details (Table 8)
   


Not Required to Check StairCase Number Rule.


[-] Staircase Checks (Table 8a-1)


No Staircase Found


No Staircase Found


No Staircase Found


[-] For Building :A (MAIN FACTORY)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN Staircase -3FL 0.900 1.920 0.250 0.300 0.200 0.125 - 8 - - 0.000 OK
STAIRCASE 0.900 1.250 0.250 0.300 0.200 0.125 - 12 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.900 1.250 0.250 0.350 0.200 0.150 - 10 - - 0.000 OK
SECOND FLOOR PLAN Staircase -3FL 0.900 1.795 0.250 0.300 0.200 0.101 - 10 - - 0.000 OK

No Staircase Found


No Staircase Found


No Staircase Found


   
   
   
[-] Accessory Use Check (Table 8d)
Accessory Use Name Area Width Depth Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
RAIN WATER HARVESTING - - 16.30 - - 4.55 - - 4.56 - - 0.00 OK
WEIGH BRIDGE - - 36.00 - - 3.00 - - 12.00 - - 0.00 OK
WEIGH BRIDGE - - 12.00 - - 3.00 - - 4.00 - - 0.00 OK
METER ROOM - - 9.00 - - 3.00 - - 3.00 - - 0.00 OK
EFFLUENT TREATMENT PLANT - - 270.00 - - 15.00 - - 18.00 - - 0.00 OK
DM WATER - - 10.91 - - 2.71 - - 4.02 - - 0.00 OK
RAW WATER OHT - - 10.91 - - 2.71 - - 4.02 - - 0.00 OK
ENT.GATE - - 1.04 - - 0.37 - - 3.01 - - 0.00 OK
ENT.GATE - - 2.43 - - 0.49 - - 5.06 - - 0.00 OK
GUARD ROOM - 10.00 9.87 - - 3.13 - - 3.24 - - 0.00 OK
GUARD ROOM - 10.00 9.87 - - 3.13 - - 3.24 - - 0.00 OK
ARGON CO2 - - 270.00 - - 15.00 - - 18.00 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.02 - - 1.89 - - 2.13 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.02 - - 1.89 - - 2.13 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.02 - - 1.89 - - 2.13 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.02 - - 1.89 - - 2.13 - - 0.00 OK
SOLAR HEATING SYSTEM - - 0.16 - - 0.38 - - 0.43 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.02 - - 1.89 - - 2.13 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.02 - - 1.89 - - 2.13 - - 0.00 OK





[-] Accessory Use No. Checks
Building Name Accessory Use Name No Status
Reqd Perm Prop
A (CANTEEN) Rain Water Harvesting 1 - 1 OK
A (SUBSTATION) Rain Water Harvesting 1 - 1 OK
A (SCRAP SHED) Rain Water Harvesting 1 - 1 OK
A (FORK LIFT) Rain Water Harvesting 1 - 1 OK
A (GUARD) Rain Water Harvesting 1 - 1 OK
A (PRESS) Rain Water Harvesting 1 - 1 OK
Entrance Gate 1 - 2 OK
A (MAIN FACTORY) Rain Water Harvesting 1 - 1 OK
Entrance Gate 1 - 2 OK
   
   


[-] Floor Details (Table 9)
   

[-] Building:A (CANTEEN)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:A (FORK LIFT)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:A (GUARD)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:A (MAIN FACTORY)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:FIRST FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:SECOND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:A (PRESS)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:A (SCRAP SHED)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:A (SUBSTATION)


[-] Floor:GROUND FLOOR PLAN



No Room Found.


   


[-] Summary (Table 10)
   
Name Perm./Reqd. Proposed Status
  Plot Area - 24281.02 OK
  Plot Width - 92.16 OK
  Plot Depth - 263.48 OK
  Access Width 9.00 30.40 OK
  Plot Frontage - 185.37 OK
  Coverage Area 12140.51 6008.01 OK
  FAR Area
Bldg. FAR Area : 6498.68
Sanctioned FAR Area :0.00
48562.04 6498.68 OK





[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Width No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Depth No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Access Width The minimum width of abutting road for Institutional, administrative, assembly, industrial and other Nonresidential and commercial activities shall be 9.0 mt.{As per Rule no. 34.5 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Plot Frontage No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
FAR Area (1) For Industrial buildings non-polluting and household, the Floor Area Ratio-FAR shall be 2.0 {As per Rule No. 39.5}
(2) 0.0
Consumed FAR (1) For Industrial buildings non-polluting and household, the Floor Area Ratio-FAR shall be 2.0 {As per Rule No. 39.5}
(2) 0.0
Common Plot Area In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
Common Plot (1) ;
(2) ;
(3) ; ;
Tree Number Mini. 8 Trees shall be required for the Plot area above 1000.0 sq.mt. (As per Rule No. 20.1.6)
DriveWay Rule The minimum width of the drive way meant exclusively for 2 wheelers should be 3.0 mt {As per Rule No. 41.2}
Margin Rule For Industrial Building having plotarea 5000-30000 sq.mt., Margin required in Front shall be 12.0 mt., Rear 9.0 mt. and 9.0 mt. shall be provided on both side. {As per Rule No. 36 Table 12}
PWork to PWork Margin Reqd Building to Building margin shall be 6 mt. or 1.5 times side setback required for the taller block whichever is high {As per Rule No. 38.1}
Building Level
Floor Height (1) No rule found for Mini. reqd Floor height
(2) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
Parapet Height Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Floor Number No Rule Defined
StairCase (1) Width of Winding staircase shall be mini. 0.90 mt.,Maximum rise 0.20 mt. & Minimum tread 0.25 mt. & Cabin Height 2.1 mt. {As per Rule No. 83.18}
(2) ; No Rule Defined
Plot / Building Level
Accessory Use (1) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(2) No need to check distance from Building RAIN WATER HARVESTING
(3) Electric cabin or substation of maximum size of 4 sq.m. with minimum width or diameter of 2 m
(4) No need to check distance from Building WEIGH BRIDGE
(5) Electric cabin or substation of maximum size of 4 sq.m. with minimum width or diameter of 2 m
(6) No need to check distance from Building METER ROOM
(7) -
(8) No need to check distance from Building EFFLUENT TREATMENT PLANT
(9) -
(10) No need to check distance from Building DM WATER
(11) -
(12) No need to check distance from Building RAW WATER OHT
(13) No need to check distance from Building ENT.GATE
(14) Guard room of max. 10 sq.mt. maximum size of 5 sq.mt shall be taken Free from FAR
(15) No need to check distance from Building GUARD ROOM
(16) -
(17) No need to check distance from Building ARGON CO2
(18) -
(19) No need to check distance from Building SOLAR HEATING SYSTEM
Accessory Use Number (1) Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
(2) In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premise shall not be less than 5 (five) meters i n width in order to allow easy access to fire engine Entrance Gate
Building Level (Rooms)