No Image Found   

Detail Scrutiny Report

JHARKHAND INDUSTRIAL AREA DEVELOPMENT AUTHORITY

Version Number: 1.0.64  
Version Date: 16/10/2020 
Report Generated On: 29-11-2022 
 
[-] Collapse All


General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictRANCHI
AuthorityJHARKHAND INDUSTRIAL AREA DEVELOPMENT AUTHORITY
Inward_NoJIADA/BP/0042/2022
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaOld Area
City Area/TPScheme NoNA
VillageHATHIYADIH
Taluka0
Architect Details
Architect NameNALIN GOEL
License No.JIADA/ARC/0008/2019
Architect Address3533 SATMALA VIJAYA HERITAGE PHASE 7 KADMA
Architect EmailIDshivnal@gmail.com
Architect Mobile No9334007673
Plot Details
Plot Use Industrial
Plot SubUse Industrial Building
PlotNearbyReligiousStructure NA
Plot/SubPlot NoE-57 & E-58, EMC PLOTS , SURVEY PLOT NO- 354 (PART)
NorthPlot No. - 82'-3" Wide Green Strip
SouthRoad Width - 18.0 MTR WIDE MAIN ROAD
EastRoad Width - 25.0 MTR WIDE MAIN ROAD
WestPlot No. - PLOT NO- E-56, E-51
Owner's Details
NameM/S CTC PRAEZISION TOOLS PRIVATE LIMITED, DIRECTOR – RAMESH KUMAR AGARWALLA
AddressPlot No.: E-57 and E-58, EMC Plots, Near 7th Phase, Adityapur Industrial Area, Gamharia
Email IDinfo@ctcindiatools.com
Mobile No7717739352
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 15135.13
2 Plot area as per Document by Applicant 15135.13
3 Physical area measured at site 15135.13
4 Area as per Site Visit (Site Visit Report) 15135.13
5Area as per Drawing 15135.07

Area of Plot Considered : 15135.07

[-] Table 2b
Proposal Detail :
UnitMeters
Development Detail :
PlotPLOT
Plot OccupancyIndustrial
Plot SubUse Industrial Building
Building StructureNon-Highrise
Building TypeSingle Detached House
Gross Plot Area 15135.07
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 15135.07
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 13553.81
Deductions for Balance Plot Area (from Gross Plot Area)
- Common Plot 1581.26
1581.26
Balance Plot Area 13553.81

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 50.00 % ) 7567.54
Proposed Coverage Area ( 30.67 % ) 4642.06
Total Prop. Coverage Area ( 30.67 % ) 4642.06
Balance coverage area ( 19.33 % ) 2925.48
FAR CHECK
Perm. FAR Area ( 2.000 ) 30270.14
Total Perm. FAR area 30270.14
Industrial FAR 4642.06
Proposed FAR Area 4642.06
Total Proposed FAR Area 4642.06
Consumed FAR (Factor) 0.31
Balance FAR Area 25628.08
BUA CHECK
Total Proposed BuiltUp Area 4642.06


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Up to 50 meter -
Existing Road Width 25 25.00
Proposed Road Width as per Master Plan 0 -
Road Widening Width 0 -
Plot size (as per measurement) 15135.13 15135.07
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK


[-] Plot Level Checking (Table 3)
   
[-] Common Plot Checks (Table 3b)
Name Total Area Status
Reqd Prop
Common Plot 1513.51 1581.26 OK


[-] Common Plot Checks (Table 3b)
Name Minimum Area Coverage Area Width Angle Access Status
Reqd Prop Perm Prop Reqd Prop Reqd Prop
Tree Cover (Plantation) - 1581.26 0.00 0.00 - 10.97 - 90.00 No Access Provided OK


   
   
[-] Tree Details (Table 3g)
Name Nos Of Trees Status
Reqd Prop
Tree 8 33 OK
   
   
   
   
   


[-] Building Details (Table 4)
   
[-] Building USE/SUBUSE Details Building USE/SUBUSE Details
Building Name Building Use Building SubUse Building Structure
A (CTC PRAEZISION TOOLS PRIVATE LIMITED) Industrial Industrial Building Non-Highrise
   
   
   
[-] Height Details (4a)



[-] Total Height (Table 4a-1)
Building Height Height (From GL) Height (From Street LVL) Status
Perm Prop
A (CTC PRAEZISION TOOLS PRIVATE LIMITED) 37.50 5.70 5.70 5.70 OK


   
   
[-] Floor Height Check (Table 4a-2)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
A (CTC PRAEZISION TOOLS PRIVATE LIMITED) Ground Floor 2.75 - 5.70 2.75 - 5.45 2.40 - 4.95 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK




No Floor Found.
   
   
   
[-] Floor Number Check (Table 4a-4)
Building Name No. of Floors No. of Tenements Status
Perm Prop Perm Prop
A (CTC PRAEZISION TOOLS PRIVATE LIMITED) - 1 - 1 OK

 
   
    [-] Coverage Check (Table 4b)
Permissible Proposed Status
7567.54 4642.06 OK
50% 30.67%

[-] Individual Coverage Check
Coverage Area Perm. Prop.
  A-1 (CTC PRAEZISION TOOLS PRIVATE LIMITED) - 4642.06
  Total Prop. Coverage Area - 4642.06
  Total Coverage Area 7567.54 4642.06

[-] FAR & Tenement Details (Table 4c-1)
Building No. of Same Bldg Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
A (CTC PRAEZISION TOOLS PRIVATE LIMITED) 1 4642.06 4642.06 4642.06 4642.06 01
Grand Total : 1 4642.06 4642.06 4642.06 4642.06 01


[-] Buildingwise Floor FAR Details
Floor Name Building Name Total
A (CTC PRAEZISION TOOLS PRIVATE LIMITED)
Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total Proposed Built Up Area (Sq.mt.) Total FAR Area (Sq.mt.)
Ground Floor 4642.06 4642.06 4642.06 4642.06
Total : 4642.06 4642.06 4642.06 4642.06


[-] UnitBUA Table for Building :A (CTC PRAEZISION TOOLS PRIVATE LIMITED)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN WORKSHOP OTHER 4642.06 4633.80 1 1
Total: - - 4642.06 4633.80 1 1


[-] Building :A (CTC PRAEZISION TOOLS PRIVATE LIMITED)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 4642.06 4642.06 4642.06 4642.06 01
Total : 4642.06 4642.06 4642.06 4642.06 01
Total Number of Same Buildings : 1
Total : 4642.06 4642.06 4642.06 4642.06 01
[-] Table 4c-2

  FAR Area
Building FAR Area:4642.06
Existing FAR Area :0.00
Perm.
30270.14
Prop.
4642.06
Status
OK




[-] Margin Checks (Table 5)
   
[-] Plot Margin (Table 5a)
Building / Wing Road Name Front Side Rear Side Side1 Side2 Status
Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop.
A-1 (CTC PRAEZISION TOOLS PRIVATE LIMITED) 18.0 MTR WIDE MAIN ROAD Access Road 12.00 14.00 9.00 78.22 9.00 9.18 9.00 11.31 OK






[-] Inner Building Details (Table 6)
   

No OTS/Duct/VShaft/Balcony/Passage/Lift/Tenements Found.
   


[-] Parking Details (Table 7)
   
[-] Required Parking(Table 7a)
Building Name Type SubUse Area (Sq.mt.) Units Car Visitors Car TwoWheeler
Reqd. Prop. Reqd./Unit Reqd. Prop. Reqd./Unit Reqd. Prop. Reqd./Unit Reqd. Prop.
A (CTC PRAEZISION TOOLS PRIVATE LIMITED) Industrial Industrial Building > 0 400 4642.06 1 8 - - - - - - -
> 0 400 4642.06 - - - - - - 1 25 -
Total : - - - - 8 16 - 0 3 - 25 50

[-] Parking Check (Table 7b)
Vehicle Type Reqd. Prop. Status
No. Area No. Area
Car - - 16 200.00 OK
Total Car 8 100.00 16 200.00 OK
Visitor's Car Parking - - 3 37.50 OK
Total Visitor Parking - - 3 37.50 OK
TwoWheeler - - 50 100.00 OK
Total TwoWheeler 25 50.00 50 100.00 OK
Heavy Vehicle - - 12 315.00 OK
Total 150.00 752.50 OK

Individual Parking Checks (Table 7c)
Dimensions and Area for all Vehicle(s) are as per the Rules

[-] Driveway Parking Checks (Table 7d)
Building/Plot Name Floor Name Driveway Name Width Status
Reqd Perm Prop
PLOT - DRIVEWAY 4.50 - 5.88 OK
DRIVEWAY 4.50 - 6.00 OK

   


[-] Exemption Details (Table 8)
   


Not Required to Check StairCase Number Rule.


[-] Staircase Checks (Table 8a-1)


No Staircase Found


   
   
   
[-] Accessory Use Check (Table 8d)
Accessory Use Name Area Width Depth Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
RAIN WATER HARVESTING - - 6.29 - - 2.83 - - 2.83 - - 0.00 OK
ELECTRIC SUBSTATION - - 8.05 - - 2.84 - - 2.84 - - 0.00 OK
METER ROOM - - 6.66 - - 2.58 - - 2.58 - - 0.00 OK
ENT.GATE - - 7.37 - - 1.24 - - 5.96 - - 0.00 OK
ENT.GATE - - 7.37 - - 1.24 - - 5.96 - - 0.00 OK
GUARD ROOM - 10.00 4.00 - - 2.00 - - 2.00 - - 0.00 OK
GUARD ROOM - 10.00 4.00 - - 2.00 - - 2.00 - - 0.00 OK
SOLAR HEATING SYSTEM - - 4.46 - - 1.94 - - 2.29 - - 0.00 OK
Generator Room - - 7.03 - - 2.01 - - 3.49 - - 0.00 OK





[-] Accessory Use No. Checks
Building Name Accessory Use Name No Status
Reqd Perm Prop
A (CTC PRAEZISION TOOLS PRIVATE LIMITED) Rain Water Harvesting 1 - 1 OK
Entrance Gate 1 - 2 OK
   
   


[-] Floor Details (Table 9)
   

[-] Building:A (CTC PRAEZISION TOOLS PRIVATE LIMITED)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.


   


[-] Summary (Table 10)
   
Name Perm./Reqd. Proposed Status
  Plot Area - 15135.07 OK
  Plot Width - 84.83 OK
  Plot Depth - 178.41 OK
  Access Width 9.00 25.00 OK
  Plot Frontage - 175.61 OK
  Coverage Area 7567.54 4642.06 OK
  FAR Area
Bldg. FAR Area : 4642.06
Sanctioned FAR Area :0.00
30270.14 4642.06 OK





[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Width No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Depth No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Access Width The minimum width of abutting road for Institutional, administrative, assembly, industrial and other Nonresidential and commercial activities shall be 9.0 mt.{As per Rule no. 34.5 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Plot Frontage No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
FAR Area (1) For Industrial buildings non-polluting and household, the Floor Area Ratio-FAR shall be 2.0 {As per Rule No. 39.5}
(2) 0.0
Consumed FAR (1) For Industrial buildings non-polluting and household, the Floor Area Ratio-FAR shall be 2.0 {As per Rule No. 39.5}
(2) 0.0
Common Plot Area In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
Common Plot (1) In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
(2) ;
Tree Number Mini. 8 Trees shall be required for the Plot area above 1000.0 sq.mt. (As per Rule No. 20.1.6)
DriveWay Rule For Plor area above 2000 sq.mt., The minimum width or driveways should not be less than 4.50 mt. {As per Rule No. 41.2 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Margin Rule For Industrial Building having plotarea 5000-30000 sq.mt., Margin required in Front shall be 12.0 mt., Rear 9.0 mt. and 9.0 mt. shall be provided on both side. {As per Rule No. 36 Table 12}
Building Level
Building Height For old area, on Road width above 18.30 mt., No restriction on height and number of floors however it may be regulated by the master plan/development plan/zonal plan {As per Rule No. 39.1 Table 15}
Floor Height (1) No rule found for Mini. reqd Floor height
(2) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
Floor Number For old area location,on Road width 18.30 mt. and above, No restriction on height and number of floors however it may be regulated by the master plan/development plan/zonal plan {As per Rule No. 39.1 Table 15}
Plot / Building Level
Accessory Use (1) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(2) No need to check distance from Building RAIN WATER HARVESTING
(3) Electric cabin or substation of maximum size of 4 sq.m. with minimum width or diameter of 2 m
(4) No need to check distance from Building ELECTRIC SUBSTATION
(5) Electric cabin or substation of maximum size of 4 sq.m. with minimum width or diameter of 2 m
(6) No need to check distance from Building METER ROOM
(7) No need to check distance from Building ENT.GATE
(8) Guard room of max. 10 sq.mt. maximum size of 5 sq.mt shall be taken Free from FAR
(9) No need to check distance from Building GUARD ROOM
(10) -
(11) No need to check distance from Building SOLAR HEATING SYSTEM
(12) Electric cabin or substation of maximum size of 4 sq.m. with minimum width or diameter of 2 m
(13) No need to check distance from Building Generator Room
Accessory Use Number (1) Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
(2) In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premise shall not be less than 5 (five) meters i n width in order to allow easy access to fire engine Entrance Gate
Building Level (Rooms)