-
No Image Found   

Detail Scrutiny Report

JHARKHAND INDUSTRIAL AREA DEVELOPMENT AUTHORITY

Version Number: 1.0.66  
Version Date: 16/10/2020 
Report Generated On: 23-11-2023 
 
[-] Collapse All


General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictRANCHI
AuthorityJHARKHAND INDUSTRIAL AREA DEVELOPMENT AUTHORITY
Inward_NoJIADA/BP/0018/2023
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaOld Area
City Area/TPScheme NoNA
VillageROWAM
Taluka0
Architect Details
Architect NameALOK KUMAR GADIA
License No.JIADA/ENG/0016/2021
Architect AddressAC-9E, 11TH PHASE, ADARSH NAGAR SONARI, JAMSHDPUR-831011
Architect EmailIDagfibre2014@gmail.com
Architect Mobile No9431302078
Plot Details
Plot Use Industrial
Plot SubUse Industrial Building
PlotNearbyReligiousStructure NA
Plot/SubPlot NoR-02, ROYAM , SURVEY PLOT NO- 03 (P), 04 (F), 05(F), 06(F), 07(F), 08(F), 09(F), 10(F), 11(F), 12(F), 3(F), 14(F), 15(F), 16(F), 17(F), 18(P), 19 (F), 20(P), 145(F), 146(F), 147(F), 148(F), 150(F), 151(F), 152(F), 153(F), 154(F), 155(F), 156(P), 158(F), 159(F), 160(P), 161(P), 164(P), 193(P),11/1209 (F) &21/1210(F)
North -
South -
EastRoad Width - 18.30 MTR MAIN ROAD
West -
Owner's Details
NameM/S KIJALK STARCH AGRO PVT.LTD , DIRECTOR – ASHOK KUMAR VERMA
AddressPlot no R2 Industrial Area Ruam Mauza Block Musabini
Email IDkijalkagro@gmail.com
Mobile No9431115114
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 101170.56
2 Plot area as per Document by Applicant 101170.56
3 Physical area measured at site 101170.56
4 Area as per Site Visit (Site Visit Report) 93757.00
5Area as per Drawing 93756.91

Area of Plot Considered : 93756.91

[-] Table 2b
Proposal Detail :
UnitMeters
Development Detail :
PlotPLOT
Plot OccupancyIndustrial
Plot SubUse Industrial Building
Building StructureMultistoried
Building TypeSingle Detached House
Gross Plot Area 93756.91
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 93756.91
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 80203.19
Deductions for Balance Plot Area (from Gross Plot Area)
- Common Plot 13553.72
13553.72
Balance Plot Area 80203.19

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 50.00 % ) 46878.45
Proposed Coverage Area ( 15.00 % ) 14064.24
Total Prop. Coverage Area ( 15 % ) 14064.24
Balance coverage area ( 35.00 % ) 32814.21
FAR CHECK
Perm. FAR Area ( 2.000 ) 187513.81
Total Perm. FAR area 187513.81
Commercial FAR 1360.00
Industrial FAR 13384.24
Proposed FAR Area 14744.23
Total Proposed FAR Area 14744.23
Consumed FAR (Factor) 0.16
Balance FAR Area 172769.58
BUA CHECK
Total Proposed BuiltUp Area 14744.25


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Exceeding 50 meter and upto 100 meter -
Existing Road Width 20 20.00
Proposed Road Width as per Master Plan 0 -
Road Widening Width 0 -
Plot size (as per measurement) 93757 93756.91
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK


[-] Plot Level Checking (Table 3)
   
[-] Common Plot Checks (Table 3b)
Name Total Area Status
Reqd Prop
Common Plot 9375.69 13553.72 OK


[-] Common Plot Checks (Table 3b)
Name Minimum Area Coverage Area Width Angle Access Status
Reqd Prop Perm Prop Reqd Prop Reqd Prop
Tree Cover (Plantation) - 214.00 0.00 0.00 - 7.53 - 90.00 No Access Provided OK
Tree Cover (Plantation) - 232.00 0.00 0.00 - 8.00 - 90.00 No Access Provided OK
Tree Cover (Plantation) - 638.88 0.00 0.00 - 21.00 - 90.00 No Access Provided OK
Tree Cover (Plantation) - 2241.39 0.00 0.00 - 25.00 - 87.10 No Access Provided OK
Tree Cover (Plantation) - 3100.61 0.00 0.00 - 35.26 - 87.29 No Access Provided OK
Tree Cover (Plantation) - 3273.39 0.00 0.00 - 119.33 - 77.83 20.0 MTR MAINROAD OK
Tree Cover (Plantation) - 3853.45 0.00 0.00 - 27.75 - 90.00 No Access Provided OK


   
   
[-] Tree Details (Table 3g)
Name Nos Of Trees Status
Reqd Prop
Tree 8 152 OK
   
   
   
   
   


[-] Building Details (Table 4)
   
[-] Building USE/SUBUSE Details Building USE/SUBUSE Details
Building Name Building Use Building SubUse Building Structure
1 (GODOWN ) Industrial Industrial Building Non-Highrise
2 (GRAIN STORAGE) Industrial Industrial Building Multistoried
3 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) Industrial Industrial Building Multistoried
4 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) Industrial Industrial Building Multistoried
5 (IMPURE SPIRIT AND STORAGE SECTION) Industrial Industrial Building Multistoried
6 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) Industrial Industrial Building Multistoried
7 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) Industrial Industrial Building Multistoried
9 (ADMIN BUILDING) Commercial Shop Non-Highrise
8 (ETHANOL STORAGE SECTION) Industrial Industrial Building Multistoried
10 (OFFICE) Industrial Industrial Building Non-Highrise
11 (DISPENSORY AND REST ROOM) Industrial Industrial Building Multistoried
12 (EXCISE OFFICE) Industrial Industrial Building Multistoried
13 (ROOM) Industrial Industrial Building Multistoried
14 (CO2 PLANT) Industrial Industrial Building Multistoried
15 (CANTEEN) Commercial Shop Non-Highrise
16 (ASH HANDLING AND TURBINE AND DG SET BOILER) Industrial Industrial Building Non-Highrise
17 (SPARES AND TOOL ROOM ) Industrial Industrial Building Non-Highrise
   
   
   
[-] Height Details (4a)



[-] Total Height (Table 4a-1)
Building Height Height (From GL) Height (From Street LVL) Status
Perm Prop
1 (GODOWN ) 172.95 0.00 0.00 10.70 OK
2 (GRAIN STORAGE) 178.06 0.00 0.00 29.00 OK
3 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 187.58 0.00 0.00 33.90 OK
4 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 200.01 0.00 0.00 33.00 OK
5 (IMPURE SPIRIT AND STORAGE SECTION) 201.28 0.00 0.00 8.00 OK
6 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 172.74 8.50 8.50 8.50 OK
7 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 147.58 0.00 0.00 20.00 OK
9 (ADMIN BUILDING) 101.09 10.00 10.00 10.00 OK
8 (ETHANOL STORAGE SECTION) 170.74 0.00 0.00 15.00 OK
10 (OFFICE) 81.80 0.00 0.00 4.20 OK
11 (DISPENSORY AND REST ROOM) 68.29 7.80 7.80 7.80 OK
12 (EXCISE OFFICE) 52.63 0.00 0.00 4.20 OK
13 (ROOM) 53.35 0.00 0.00 4.20 OK
14 (CO2 PLANT) 90.22 20.01 20.01 20.01 OK
15 (CANTEEN) 110.70 6.60 6.60 6.60 OK
16 (ASH HANDLING AND TURBINE AND DG SET BOILER) 49.25 0.00 0.00 50.05 OK
17 (SPARES AND TOOL ROOM ) 104.84 11.80 11.80 11.80 OK


   
   
[-] Floor Height Check (Table 4a-2)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
1 (GODOWN ) Ground Floor 2.75 - 10.70 2.75 - 10.45 2.40 - 9.95 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
2 (GRAIN STORAGE) Ground Floor 2.75 - 29.00 2.75 - 28.75 2.40 - 28.25 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
3 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) Ground Floor 2.75 - 33.90 2.75 - 33.65 2.40 - 33.15 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
4 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) Ground Floor 2.75 - 33.00 2.75 - 32.75 2.40 - 32.25 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
5 (IMPURE SPIRIT AND STORAGE SECTION) Ground Floor 2.75 - 8.00 2.75 - 7.85 2.40 - 7.78 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
6 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) Ground Floor 2.75 - 8.50 2.75 - 8.35 2.40 - 8.27 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
7 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) Ground Floor 2.75 - 20.00 2.75 - 19.75 2.40 - 19.25 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
9 (ADMIN BUILDING) First Floor 2.75 - 5.00 2.75 - 4.85 2.40 - 4.78 OK
Ground Floor 2.75 - 5.00 2.75 - 4.85 2.40 - 4.78 OK
Plinth 0.45 - 0.57 - - 0.57 - - 0.57 OK
8 (ETHANOL STORAGE SECTION) Ground Floor 2.75 - 15.00 2.75 - 14.75 2.40 - 14.25 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
10 (OFFICE) Ground Floor 2.75 - 4.20 2.75 - 4.05 2.40 - 3.98 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
11 (DISPENSORY AND REST ROOM) First Floor 2.75 - 3.90 2.75 - 3.75 2.40 - 3.68 OK
Ground Floor 2.75 - 3.90 2.75 - 3.75 2.40 - 3.68 OK
Plinth 0.45 - 0.57 - - 0.57 - - 0.57 OK
12 (EXCISE OFFICE) Ground Floor 2.75 - 4.20 2.75 - 4.05 2.40 - 3.98 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
13 (ROOM) Ground Floor 2.75 - 4.20 2.75 - 4.05 2.40 - 3.98 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
14 (CO2 PLANT) Ground Floor 2.75 - 20.01 2.75 - 19.86 2.40 - 19.79 OK
Plinth 0.45 - 0.57 - - 0.57 - - 0.57 OK
15 (CANTEEN) First Floor 2.75 - 3.30 2.75 - 3.15 2.40 - 3.08 OK
Ground Floor 2.75 - 3.30 2.75 - 3.15 2.40 - 3.08 OK
Plinth 0.45 - 0.50 - - 0.50 - - 0.50 OK
16 (ASH HANDLING AND TURBINE AND DG SET BOILER) Ground Floor 2.75 - 50.05 2.75 - 49.90 2.40 - 49.83 OK
Plinth 0.45 - 0.57 - - 0.57 - - 0.57 OK
17 (SPARES AND TOOL ROOM ) Ground Floor 2.75 - 11.80 2.75 - 11.65 2.40 - 11.57 OK
Plinth 0.45 - 0.57 - - 0.57 - - 0.57 OK


[-] Parapet Height Check (Table 4a-2.1)
Building Name Floor Name Height Clear Height Beam Clear Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
9 (ADMIN BUILDING) Terrace Floor - - 1.05 - - 1.05 - - 1.05 OK
11 (DISPENSORY AND REST ROOM) Terrace Floor - - 1.06 - - 1.06 - - 1.06 OK
15 (CANTEEN) Terrace Floor - - 1.03 - - 1.03 - - 1.03 OK
   
   
   
[-] Floor Number Check (Table 4a-4)
Building Name No. of Floors No. of Tenements Status
Perm Prop Perm Prop
1 (GODOWN ) - 1 - 1 OK
2 (GRAIN STORAGE) - 1 - 1 OK
3 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) - 1 - 1 OK
4 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) - 1 - 1 OK
5 (IMPURE SPIRIT AND STORAGE SECTION) - 1 - 1 OK
6 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) - 1 - 1 OK
7 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) - 1 - 1 OK
9 (ADMIN BUILDING) - 2 - 2 OK
8 (ETHANOL STORAGE SECTION) - 1 - 1 OK
10 (OFFICE) - 1 - 1 OK
11 (DISPENSORY AND REST ROOM) - 2 - 2 OK
12 (EXCISE OFFICE) - 1 - 1 OK
13 (ROOM) - 1 - 1 OK
14 (CO2 PLANT) - 1 - 1 OK
15 (CANTEEN) - 2 - 2 OK
16 (ASH HANDLING AND TURBINE AND DG SET BOILER) - 1 - 1 OK
17 (SPARES AND TOOL ROOM ) - 1 - 1 OK

 
   
    [-] Coverage Check (Table 4b)
Permissible Proposed Status
46878.45 14064.24 OK
50% 15%

[-] Individual Coverage Check
Coverage Area Perm. Prop.
  1-1 (GODOWN ) - 0.00
  2-1 (GRAIN STORAGE) - 0.00
  3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) - 0.00
  4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) - 0.00
  5-1 (IMPURE SPIRIT AND STORAGE SECTION) - 0.00
  6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) - 189.00
  7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) - 0.00
  9-1 (ADMIN BUILDING) - 350.00
  8-1 (ETHANOL STORAGE SECTION) - 0.00
  10-1 (OFFICE) - 0.00
  11-1 (DISPENSORY AND REST ROOM) - 120.00
  12-1 (EXCISE OFFICE) - 0.00
  13-1 (ROOM) - 0.00
  14-1 (CO2 PLANT) - 1015.00
  15-1 (CANTEEN) - 210.00
  16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) - 0.00
  17-1 (SPARES AND TOOL ROOM ) - 180.00
  Total Prop. Coverage Area - 14064.24
  Total Coverage Area 46878.45 14064.24

[-] FAR & Tenement Details (Table 4c-1)
Building No. of Same Bldg Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Commercial Industrial
1 (GODOWN ) 1 976.49 0.00 976.49 976.49 976.49 01
2 (GRAIN STORAGE) 1 1707.25 0.00 1707.25 1707.25 1707.25 01
3 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 1 1773.80 0.00 1773.80 1773.80 1773.80 01
4 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 1 550.85 0.00 550.85 550.85 550.85 01
5 (IMPURE SPIRIT AND STORAGE SECTION) 1 130.00 0.00 130.00 130.00 130.00 01
6 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 1 189.00 0.00 189.00 189.00 189.00 01
7 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 1 1448.50 0.00 1448.50 1448.50 1448.50 01
9 (ADMIN BUILDING) 1 700.00 700.00 0.00 700.00 700.00 02
8 (ETHANOL STORAGE SECTION) 1 2889.80 0.00 2889.80 2889.80 2889.80 01
10 (OFFICE) 1 15.91 0.00 15.91 15.91 15.91 01
11 (DISPENSORY AND REST ROOM) 1 240.00 240.00 0.00 240.00 240.00 02
12 (EXCISE OFFICE) 1 22.01 0.00 22.01 22.01 22.01 01
13 (ROOM) 1 48.99 0.00 48.99 48.99 48.99 01
14 (CO2 PLANT) 1 1015.00 0.00 1015.00 1015.00 1015.00 01
15 (CANTEEN) 1 420.00 420.00 0.00 420.00 420.00 02
16 (ASH HANDLING AND TURBINE AND DG SET BOILER) 1 2436.65 0.00 2436.65 2436.65 2436.65 01
17 (SPARES AND TOOL ROOM ) 1 180.00 0.00 180.00 180.00 180.00 01
Grand Total : 17 14744.25 1360.00 13384.24 14744.25 14744.25 20


[-] Buildingwise Floor FAR Details
Floor Name Building Name Total
1 (GODOWN ) 2 (GRAIN STORAGE) 3 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 4 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 5 (IMPURE SPIRIT AND STORAGE SECTION) 6 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 7 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 9 (ADMIN BUILDING) 8 (ETHANOL STORAGE SECTION) 10 (OFFICE) 11 (DISPENSORY AND REST ROOM) 12 (EXCISE OFFICE) 13 (ROOM) 14 (CO2 PLANT) 15 (CANTEEN) 16 (ASH HANDLING AND TURBINE AND DG SET BOILER) 17 (SPARES AND TOOL ROOM )
Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total Proposed Built Up Area (Sq.mt.) Total FAR Area (Sq.mt.)
Ground Floor 976.49 976.49 1707.25 1707.25 1773.80 1773.80 550.85 550.85 130.00 130.00 189.00 189.00 1448.50 1448.50 350.00 350.00 2889.80 2889.80 15.91 15.91 120.00 120.00 22.01 22.01 48.99 48.99 1015.00 1015.00 210.00 210.00 2436.65 2436.65 180.00 180.00 14064.25 14064.25
First Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 350.00 350.00 0.00 0.00 0.00 0.00 120.00 120.00 0.00 0.00 0.00 0.00 0.00 0.00 210.00 210.00 0.00 0.00 0.00 0.00 680.00 680.00
Terrace Floor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total : 976.49 976.49 1707.25 1707.25 1773.80 1773.80 550.85 550.85 130.00 130.00 189.00 189.00 1448.50 1448.50 700.00 700.00 2889.80 2889.80 15.91 15.91 240.00 240.00 22.01 22.01 48.99 48.99 1015.00 1015.00 420.00 420.00 2436.65 2436.65 180.00 180.00 14744.25 14744.25


[-] UnitBUA Table for Building :1 (GODOWN )
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN GODOWN OTHER 976.49 976.02 1 1
Total: - - 976.49 976.02 1 1
[-] UnitBUA Table for Building :2 (GRAIN STORAGE) UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN STORAGE ROOM OTHER 1707.25 1705.74 1 1
Total: - - 1707.25 1705.74 1 1
[-] UnitBUA Table for Building :3 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION OTHER 1773.80 1772.64 1 1
Total: - - 1773.80 1772.64 1 1
[-] UnitBUA Table for Building :4 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION )
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION OTHER 550.85 550.46 1 1
Total: - - 550.85 550.46 1 1
[-] UnitBUA Table for Building :5 (IMPURE SPIRIT AND STORAGE SECTION)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN IMPURE SPIRIT AND STORAGE SECTION OTHER 130.00 129.61 1 1
Total: - - 130.00 129.61 1 1
[-] UnitBUA Table for Building :6 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION )
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN C T FOR DIST AND EVAPORATION AND LIQUEFACTION OTHER 189.00 188.72 1 1
Total: - - 189.00 188.72 1 1
[-] UnitBUA Table for Building :7 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION OTHER 1448.50 1448.02 1 1
Total: - - 1448.50 1448.02 1 1
[-] UnitBUA Table for Building :9 (ADMIN BUILDING)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN OFFICE OFFICE 308.48 308.30 3 1
FIRST FLOOR PLAN OFFICE OFFICE 308.48 308.40 2 1
Total: - - 616.96 616.70 5 2
[-] UnitBUA Table for Building :8 (ETHANOL STORAGE SECTION)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN ETHANOL STORAGE SECTION OTHER 2889.80 2889.41 1 1
Total: - - 2889.80 2889.41 1 1
[-] UnitBUA Table for Building :10 (OFFICE)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN OFFICE OFFICE 15.91 15.63 1 1
Total: - - 15.91 15.63 1 1
[-] UnitBUA Table for Building :11 (DISPENSORY AND REST ROOM)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN DISPENSORY OFFICE 120.00 119.65 1 1
FIRST FLOOR PLAN HALL OFFICE 120.00 119.76 7 1
Total: - - 240.00 239.41 8 2
[-] UnitBUA Table for Building :12 (EXCISE OFFICE)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN EXCISE OFFICE OTHER 22.01 21.36 1 1
Total: - - 22.01 21.36 1 1
[-] UnitBUA Table for Building :13 (ROOM)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN ROOM OTHER 48.99 48.57 1 1
Total: - - 48.99 48.57 1 1
[-] UnitBUA Table for Building :14 (CO2 PLANT)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN CO2 PLANT OTHER 1015.00 1013.92 1 1
Total: - - 1015.00 1013.92 1 1
[-] UnitBUA Table for Building :15 (CANTEEN)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
FIRST FLOOR PLAN CAFETERIA OFFICE 210.00 209.41 1 1
GROUND FLOOR PLAN CAFETERIA OFFICE 210.00 209.66 6 1
Total: - - 420.00 419.07 7 2
[-] UnitBUA Table for Building :16 (ASH HANDLING AND TURBINE AND DG SET BOILER)
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN ASH HANDLING AND TURBINE AND DG SET BOILER OTHER 2436.65 2435.85 1 1
Total: - - 2436.65 2435.85 1 1
[-] UnitBUA Table for Building :17 (SPARES AND TOOL ROOM )
UnitBUA CALCULATION
FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement
GROUND FLOOR PLAN SPARES AND TOOL ROOM OTHER 180.00 179.83 1 1
Total: - - 180.00 179.83 1 1


[-] Building :1 (GODOWN )
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 976.49 976.49 976.49 976.49 01
Total : 976.49 976.49 976.49 976.49 01
Total Number of Same Buildings : 1
Total : 976.49 976.49 976.49 976.49 01

[-] Building :2 (GRAIN STORAGE)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 1707.25 1707.25 1707.25 1707.25 01
Total : 1707.25 1707.25 1707.25 1707.25 01
Total Number of Same Buildings : 1
Total : 1707.25 1707.25 1707.25 1707.25 01

[-] Building :3 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 1773.80 1773.80 1773.80 1773.80 01
Total : 1773.80 1773.80 1773.80 1773.80 01
Total Number of Same Buildings : 1
Total : 1773.80 1773.80 1773.80 1773.80 01

[-] Building :4 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION )
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 550.85 550.85 550.85 550.85 01
Total : 550.85 550.85 550.85 550.85 01
Total Number of Same Buildings : 1
Total : 550.85 550.85 550.85 550.85 01

[-] Building :5 (IMPURE SPIRIT AND STORAGE SECTION)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 130.00 130.00 130.00 130.00 01
Total : 130.00 130.00 130.00 130.00 01
Total Number of Same Buildings : 1
Total : 130.00 130.00 130.00 130.00 01

[-] Building :6 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION )
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 189.00 189.00 189.00 189.00 01
Total : 189.00 189.00 189.00 189.00 01
Total Number of Same Buildings : 1
Total : 189.00 189.00 189.00 189.00 01

[-] Building :7 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 1448.50 1448.50 1448.50 1448.50 01
Total : 1448.50 1448.50 1448.50 1448.50 01
Total Number of Same Buildings : 1
Total : 1448.50 1448.50 1448.50 1448.50 01

[-] Building :9 (ADMIN BUILDING)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Commercial
Ground Floor 350.00 350.00 350.00 350.00 01
First Floor 350.00 350.00 350.00 350.00 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 700.00 700.00 700.00 700.00 02
Total Number of Same Buildings : 1
Total : 700.00 700.00 700.00 700.00 02

[-] Building :8 (ETHANOL STORAGE SECTION)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 2889.80 2889.80 2889.80 2889.80 01
Total : 2889.80 2889.80 2889.80 2889.80 01
Total Number of Same Buildings : 1
Total : 2889.80 2889.80 2889.80 2889.80 01

[-] Building :10 (OFFICE)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 15.91 15.91 15.91 15.91 01
Total : 15.91 15.91 15.91 15.91 01
Total Number of Same Buildings : 1
Total : 15.91 15.91 15.91 15.91 01

[-] Building :11 (DISPENSORY AND REST ROOM)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Commercial
Ground Floor 120.00 120.00 120.00 120.00 01
First Floor 120.00 120.00 120.00 120.00 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 240.00 240.00 240.00 240.00 02
Total Number of Same Buildings : 1
Total : 240.00 240.00 240.00 240.00 02

[-] Building :12 (EXCISE OFFICE)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 22.01 22.01 22.01 22.01 01
Total : 22.01 22.01 22.01 22.01 01
Total Number of Same Buildings : 1
Total : 22.01 22.01 22.01 22.01 01

[-] Building :13 (ROOM)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 48.99 48.99 48.99 48.99 01
Total : 48.99 48.99 48.99 48.99 01
Total Number of Same Buildings : 1
Total : 48.99 48.99 48.99 48.99 01

[-] Building :14 (CO2 PLANT)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 1015.00 1015.00 1015.00 1015.00 01
Total : 1015.00 1015.00 1015.00 1015.00 01
Total Number of Same Buildings : 1
Total : 1015.00 1015.00 1015.00 1015.00 01

[-] Building :15 (CANTEEN)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Commercial
Ground Floor 210.00 210.00 210.00 210.00 01
First Floor 210.00 210.00 210.00 210.00 01
Terrace Floor 0.00 0.00 0.00 0.00 00
Total : 420.00 420.00 420.00 420.00 02
Total Number of Same Buildings : 1
Total : 420.00 420.00 420.00 420.00 02

[-] Building :16 (ASH HANDLING AND TURBINE AND DG SET BOILER)
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 2436.65 2436.65 2436.65 2436.65 01
Total : 2436.65 2436.65 2436.65 2436.65 01
Total Number of Same Buildings : 1
Total : 2436.65 2436.65 2436.65 2436.65 01

[-] Building :17 (SPARES AND TOOL ROOM )
Floor Name Total Built Up Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Total Consumed Additional FAR Area (Sq.mt.) Tnmt (No.)
Industrial
Ground Floor 180.00 180.00 180.00 180.00 01
Total : 180.00 180.00 180.00 180.00 01
Total Number of Same Buildings : 1
Total : 180.00 180.00 180.00 180.00 01
[-] Table 4c-2

  FAR Area
Building FAR Area:14744.23
Existing FAR Area :0.00
Perm.
187513.81
Prop.
14744.23
Status
OK




[-] Margin Checks (Table 5)
   
[-] Plot Margin (Table 5a)
Building / Wing Road Name Front Side Rear Side Side1 Side2 Status
Reqd. Prop. Reqd. Prop. Reqd. Prop. Reqd. Prop.
1-1 (GODOWN ) 20.0 MTR MAINROAD 6.50 142.74 4.50 63.40 4.50 61.52 4.50 141.11 OK
20.0 MTR MAINROAD 9.00 71.09
20.0 MTR MAINROAD 9.00 38.29
20.0 MTR MAINROAD 7.50 60.22
20.0 MTR MAINROAD 9.00 80.70
20.0 MTR MAINROAD 15.00 74.84



[-] Building To Building Margin Check (Table 5b)
From Wing To Wing Margin Status
Reqd Prop
1-1 (GODOWN ) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 109.89 OK
15-1 (CANTEEN) 6.75 93.95 OK
10-1 (OFFICE) 6.75 244.80 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 50.22 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 231.69 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 173.02 OK
13-1 (ROOM) 6.75 204.11 OK
12-1 (EXCISE OFFICE) 6.75 257.92 OK
2-1 (GRAIN STORAGE) 6.75 9.60 OK
9-1 (ADMIN BUILDING) 6.75 208.73 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 105.20 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 134.19 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 135.00 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 84.10 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 47.40 OK
14-1 (CO2 PLANT) 6.75 123.17 OK
2-1 (GRAIN STORAGE) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 71.93 OK
15-1 (CANTEEN) 6.75 65.87 OK
10-1 (OFFICE) 6.75 213.46 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 53.25 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 201.19 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 135.07 OK
13-1 (ROOM) 6.75 178.02 OK
12-1 (EXCISE OFFICE) 6.75 229.05 OK
1-1 (GODOWN ) 6.75 9.60 OK
9-1 (ADMIN BUILDING) 6.75 174.54 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 109.75 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 96.23 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 97.04 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 46.15 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 9.44 OK
14-1 (CO2 PLANT) 6.75 92.67 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 11.62 OK
15-1 (CANTEEN) 6.75 59.33 OK
10-1 (OFFICE) 6.75 179.45 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 67.56 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 170.26 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 74.76 OK
13-1 (ROOM) 6.75 160.39 OK
12-1 (EXCISE OFFICE) 6.75 200.93 OK
2-1 (GRAIN STORAGE) 6.75 9.44 OK
1-1 (GODOWN ) 6.75 47.40 OK
9-1 (ADMIN BUILDING) 6.75 133.80 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 118.86 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 37.30 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 36.74 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 8.80 OK
14-1 (CO2 PLANT) 6.75 77.97 OK
4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 15-1 (CANTEEN) 6.75 69.00 OK
10-1 (OFFICE) 6.75 159.13 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 114.56 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 151.69 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 44.91 OK
13-1 (ROOM) 6.75 148.80 OK
12-1 (EXCISE OFFICE) 6.75 182.84 OK
2-1 (GRAIN STORAGE) 6.75 71.93 OK
1-1 (GODOWN ) 6.75 109.89 OK
9-1 (ADMIN BUILDING) 6.75 111.67 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 129.27 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 10.35 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 6.89 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 9.11 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 11.62 OK
14-1 (CO2 PLANT) 6.75 75.05 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 6.89 OK
15-1 (CANTEEN) 6.75 78.23 OK
10-1 (OFFICE) 6.75 149.30 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 134.53 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 143.13 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 28.03 OK
13-1 (ROOM) 6.75 144.85 OK
12-1 (EXCISE OFFICE) 6.75 174.28 OK
2-1 (GRAIN STORAGE) 6.75 97.04 OK
1-1 (GODOWN ) 6.75 135.00 OK
9-1 (ADMIN BUILDING) 6.75 101.15 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 128.64 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 7.69 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 15.75 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 36.74 OK
14-1 (CO2 PLANT) 6.75 74.37 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 10.35 OK
15-1 (CANTEEN) 6.75 55.40 OK
10-1 (OFFICE) 6.75 126.58 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 120.84 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 118.76 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 29.84 OK
13-1 (ROOM) 6.75 116.83 OK
12-1 (EXCISE OFFICE) 6.75 149.89 OK
2-1 (GRAIN STORAGE) 6.75 96.23 OK
1-1 (GODOWN ) 6.75 134.19 OK
9-1 (ADMIN BUILDING) 6.75 79.75 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 99.94 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 7.69 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 12.49 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 37.30 OK
14-1 (CO2 PLANT) 6.75 45.68 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 9.11 OK
15-1 (CANTEEN) 6.75 15.90 OK
10-1 (OFFICE) 6.75 126.36 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 66.32 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 115.54 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 51.33 OK
13-1 (ROOM) 6.75 102.61 OK
12-1 (EXCISE OFFICE) 6.75 145.40 OK
2-1 (GRAIN STORAGE) 6.75 46.15 OK
1-1 (GODOWN ) 6.75 84.10 OK
9-1 (ADMIN BUILDING) 6.75 85.11 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 78.12 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 12.49 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 15.75 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 8.80 OK
14-1 (CO2 PLANT) 6.75 23.90 OK
9-1 (ADMIN BUILDING) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 111.67 OK
15-1 (CANTEEN) 6.75 105.77 OK
10-1 (OFFICE) 6.75 19.72 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 177.93 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 19.17 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 49.39 OK
13-1 (ROOM) 6.75 44.26 OK
12-1 (EXCISE OFFICE) 6.75 47.27 OK
2-1 (GRAIN STORAGE) 6.75 174.54 OK
1-1 (GODOWN ) 6.75 208.73 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 70.65 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 79.75 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 101.15 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 85.11 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 133.80 OK
14-1 (CO2 PLANT) 6.75 58.20 OK
8-1 (ETHANOL STORAGE SECTION) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 44.91 OK
15-1 (CANTEEN) 6.75 85.09 OK
10-1 (OFFICE) 6.75 92.54 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 155.87 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 93.56 OK
13-1 (ROOM) 6.75 107.57 OK
12-1 (EXCISE OFFICE) 6.75 121.12 OK
2-1 (GRAIN STORAGE) 6.75 135.07 OK
1-1 (GODOWN ) 6.75 173.02 OK
9-1 (ADMIN BUILDING) 6.75 49.39 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 101.71 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 29.84 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 28.03 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 51.33 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 74.76 OK
14-1 (CO2 PLANT) 6.75 49.95 OK
10-1 (OFFICE) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 159.13 OK
15-1 (CANTEEN) 6.75 134.01 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 203.01 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 7.14 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 92.54 OK
13-1 (ROOM) 6.75 52.17 OK
12-1 (EXCISE OFFICE) 6.75 23.92 OK
2-1 (GRAIN STORAGE) 6.75 213.46 OK
1-1 (GODOWN ) 6.75 244.80 OK
9-1 (ADMIN BUILDING) 6.75 19.72 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 90.04 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 126.58 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 149.30 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 126.36 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 179.45 OK
14-1 (CO2 PLANT) 6.75 82.23 OK
11-1 (DISPENSORY AND REST ROOM) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 151.69 OK
15-1 (CANTEEN) 6.75 120.05 OK
10-1 (OFFICE) 6.75 7.14 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 188.33 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 93.56 OK
13-1 (ROOM) 6.75 35.99 OK
12-1 (EXCISE OFFICE) 6.75 14.18 OK
2-1 (GRAIN STORAGE) 6.75 201.19 OK
1-1 (GODOWN ) 6.75 231.69 OK
9-1 (ADMIN BUILDING) 6.75 19.17 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 74.90 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 118.76 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 143.13 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 115.54 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 170.26 OK
14-1 (CO2 PLANT) 6.75 67.90 OK
12-1 (EXCISE OFFICE) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 182.84 OK
15-1 (CANTEEN) 6.75 144.90 OK
10-1 (OFFICE) 6.75 23.92 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 209.54 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 14.18 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 121.12 OK
13-1 (ROOM) 6.75 50.76 OK
2-1 (GRAIN STORAGE) 6.75 229.05 OK
1-1 (GODOWN ) 6.75 257.92 OK
9-1 (ADMIN BUILDING) 6.75 47.27 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 90.03 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 149.89 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 174.28 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 145.40 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 200.93 OK
14-1 (CO2 PLANT) 6.75 92.67 OK
13-1 (ROOM) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 148.80 OK
15-1 (CANTEEN) 6.75 90.89 OK
10-1 (OFFICE) 6.75 52.17 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 152.59 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 35.99 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 107.57 OK
12-1 (EXCISE OFFICE) 6.75 50.76 OK
2-1 (GRAIN STORAGE) 6.75 178.02 OK
1-1 (GODOWN ) 6.75 204.11 OK
9-1 (ADMIN BUILDING) 6.75 44.26 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 34.01 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 116.83 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 144.85 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 102.61 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 160.39 OK
14-1 (CO2 PLANT) 6.75 41.65 OK
14-1 (CO2 PLANT) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 75.05 OK
15-1 (CANTEEN) 6.75 18.57 OK
10-1 (OFFICE) 6.75 82.23 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 90.74 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 67.90 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 49.95 OK
13-1 (ROOM) 6.75 41.65 OK
12-1 (EXCISE OFFICE) 6.75 92.67 OK
2-1 (GRAIN STORAGE) 6.75 92.67 OK
1-1 (GODOWN ) 6.75 123.17 OK
9-1 (ADMIN BUILDING) 6.75 58.20 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 19.21 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 45.68 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 74.37 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 23.90 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 77.97 OK
15-1 (CANTEEN) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 69.00 OK
10-1 (OFFICE) 6.75 134.01 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 62.16 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 120.05 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 85.09 OK
13-1 (ROOM) 6.75 90.89 OK
12-1 (EXCISE OFFICE) 6.75 144.90 OK
2-1 (GRAIN STORAGE) 6.75 65.87 OK
1-1 (GODOWN ) 6.75 93.95 OK
9-1 (ADMIN BUILDING) 6.75 105.77 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 41.22 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 55.40 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 78.23 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 15.90 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 59.33 OK
14-1 (CO2 PLANT) 6.75 18.57 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 129.27 OK
15-1 (CANTEEN) 6.75 41.22 OK
10-1 (OFFICE) 6.75 90.04 OK
17-1 (SPARES AND TOOL ROOM ) 6.75 36.50 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 74.90 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 101.71 OK
13-1 (ROOM) 6.75 34.01 OK
12-1 (EXCISE OFFICE) 6.75 90.03 OK
2-1 (GRAIN STORAGE) 6.75 109.75 OK
1-1 (GODOWN ) 6.75 105.20 OK
9-1 (ADMIN BUILDING) 6.75 70.65 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 99.94 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 128.64 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 78.12 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 118.86 OK
14-1 (CO2 PLANT) 6.75 19.21 OK
17-1 (SPARES AND TOOL ROOM ) 4-1 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) 6.75 114.56 OK
15-1 (CANTEEN) 6.75 62.16 OK
10-1 (OFFICE) 6.75 203.01 OK
11-1 (DISPENSORY AND REST ROOM) 6.75 188.33 OK
8-1 (ETHANOL STORAGE SECTION) 6.75 155.87 OK
13-1 (ROOM) 6.75 152.59 OK
12-1 (EXCISE OFFICE) 6.75 209.54 OK
2-1 (GRAIN STORAGE) 6.75 53.25 OK
1-1 (GODOWN ) 6.75 50.22 OK
9-1 (ADMIN BUILDING) 6.75 177.93 OK
16-1 (ASH HANDLING AND TURBINE AND DG SET BOILER) 6.75 36.50 OK
6-1 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) 6.75 120.84 OK
5-1 (IMPURE SPIRIT AND STORAGE SECTION) 6.75 134.53 OK
7-1 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) 6.75 66.32 OK
3-1 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) 6.75 67.56 OK
14-1 (CO2 PLANT) 6.75 90.74 OK






[-] Inner Building Details (Table 6)
   

No OTS/Duct/VShaft/Balcony/Passage/Lift/Tenements Found.
   


[-] Parking Details (Table 7)
   
[-] Required Parking(Table 7a)
Building Name Type SubUse Area (Sq.mt.) Units Car Visitors Car TwoWheeler
Reqd. Prop. Reqd./Unit Reqd. Prop. Reqd./Unit Reqd. Prop. Reqd./Unit Reqd. Prop.
1 (GODOWN ) Industrial Industrial Building > 0 400 976.49 1 2 - - - - - - -
> 0 400 976.49 - - - - - - 1 6 -
2 (GRAIN STORAGE) Industrial Industrial Building > 0 400 1707.25 1 3 - - - - - - -
> 0 400 1707.25 - - - - - - 1 9 -
3 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) Industrial Industrial Building > 0 400 1773.80 1 3 - - - - - - -
> 0 400 1773.80 - - - - - - 1 10 -
4 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) Industrial Industrial Building > 0 400 550.85 1 1 - - - - - - -
> 0 400 550.85 - - - - - - 1 3 -
5 (IMPURE SPIRIT AND STORAGE SECTION) Industrial Industrial Building > 0 400 130.00 1 1 - - - - - - -
> 0 400 130.00 - - - - - - 1 1 -
6 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) Industrial Industrial Building > 0 400 189.00 1 1 - - - - - - -
> 0 400 189.00 - - - - - - 1 1 -
7 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) Industrial Industrial Building > 0 400 1448.50 1 3 - - - - - - -
> 0 400 1448.50 - - - - - - 1 8 -
9 (ADMIN BUILDING) Commercial Shop > 0 50 653.47 1 9 - - - - - - -
> 0 50 653.47 - - - - - - 1 28 -
8 (ETHANOL STORAGE SECTION) Industrial Industrial Building > 0 400 2889.80 1 5 - - - - - - -
> 0 400 2889.80 - - - - - - 1 16 -
10 (OFFICE) Industrial Industrial Building > 0 400 15.91 1 1 - - - - - - -
> 0 400 15.91 - - - - - - 1 1 -
11 (DISPENSORY AND REST ROOM) Commercial Clinic > 0 200 212.64 1 1 - - - - - - -
> 0 200 212.64 - - - - - - 1 3 -
12 (EXCISE OFFICE) Industrial Industrial Building > 0 400 22.01 1 1 - - - - - - -
> 0 400 22.01 - - - - - - 1 1 -
13 (ROOM) Industrial Industrial Building > 0 400 48.99 1 1 - - - - - - -
> 0 400 48.99 - - - - - - 1 1 -
14 (CO2 PLANT) Industrial Industrial Building > 0 400 1015.00 1 2 - - - - - - -
> 0 400 1015.00 - - - - - - 1 6 -
15 (CANTEEN) Commercial Shop > 0 50 392.10 1 6 - - - - - - -
> 0 50 392.10 - - - - - - 1 17 -
16 (ASH HANDLING AND TURBINE AND DG SET BOILER) Industrial Industrial Building > 0 400 2436.65 1 5 - - - - - - -
> 0 400 2436.65 - - - - - - 1 13 -
17 (SPARES AND TOOL ROOM ) Industrial Industrial Building > 0 400 180.00 1 1 - - - - - - -
> 0 400 180.00 - - - - - - 1 1 -
Total : - - - - 46 50 - 0 3 - 125 142

[-] Parking Check (Table 7b)
Vehicle Type Reqd. Prop. Status
No. Area No. Area
Car - - 50 625.00 OK
Total Car 46 575.00 50 625.00 OK
Visitor's Car Parking - - 3 37.50 OK
Total Visitor Parking - - 3 37.50 OK
TwoWheeler - - 142 284.00 OK
Total TwoWheeler 125 250.00 142 284.00 OK
Heavy Vehicle - - 2 52.50 OK
Total 825.00 1283.00 OK

Individual Parking Checks (Table 7c)
Dimensions and Area for all Vehicle(s) are as per the Rules

[-] Driveway Parking Checks (Table 7d)
Building/Plot Name Floor Name Driveway Name Width Status
Reqd Perm Prop
PLOT - DRIVEWAY 4.50 - 4.70 OK

   


[-] Exemption Details (Table 8)
   


Not Required to Check StairCase Number Rule.


[-] Staircase Checks (Table 8a-1)


No Staircase Found


No Staircase Found


[-] For Building :11 (DISPENSORY AND REST ROOM)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN STAIRCASE 0.750 1.200 0.225 0.300 0.200 0.150 - 13 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.750 1.200 0.225 0.300 0.200 0.150 - 13 - - 0.000 OK
TERRACE FLOOR PLAN STAIRCASE - 1.200 - 0.300 - 0.000 - 0 2.100 - 2.440 OK

No Staircase Found


No Staircase Found


No Staircase Found


[-] For Building :15 (CANTEEN)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
FIRST FLOOR PLAN STAIRCASE 0.750 1.225 0.225 0.300 0.200 0.174 - 10 - - 0.000 OK
TERRACE FLOOR PLAN STAIRCASE - 1.225 - 0.300 - 0.000 - 0 2.100 - 2.440 OK
GROUND FLOOR PLAN STAIRCASE 0.750 1.225 0.225 0.300 0.200 0.174 - 10 - - 0.000 OK

No Staircase Found


No Staircase Found


No Staircase Found


No Staircase Found


No Staircase Found


No Staircase Found


No Staircase Found


No Staircase Found


No Staircase Found


[-] For Building :9 (ADMIN BUILDING)
Floor Name StairCase Name Flight Width Tread Width Riser Height Riser No. On Flight Cabin Ht. Status
Reqd Prop Reqd Prop Perm Prop Perm Prop Reqd Perm Prop
GROUND FLOOR PLAN STAIRCASE 0.750 1.500 0.225 0.300 0.200 0.185 - 14 - - 0.000 OK
FIRST FLOOR PLAN STAIRCASE 0.750 1.500 0.225 0.300 0.200 0.185 - 14 - - 0.000 OK
TERRACE FLOOR PLAN STAIRCASE - 1.500 - 0.300 - 0.000 - 0 2.100 - 2.440 OK

   
   
   
[-] Accessory Use Check (Table 8d)
Accessory Use Name Area Width Depth Height Status
Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop Reqd Perm Prop
Toilet - 5.00 4.21 - - 1.69 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.21 - - 1.69 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.21 - - 1.69 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.21 - - 1.69 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.21 - - 1.69 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.21 - - 1.69 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
Toilet - 5.00 4.14 - - 1.66 - - 2.50 - - 0.00 OK
COOLING TOWER - - 43.69 - - 4.68 - - 9.34 - - 0.00 OK
COMPRESSOR - - 150.00 - - 10.00 - - 15.00 - - 0.00 OK
RAIN WATER HARVESTING - - 47.87 - - 6.68 - - 7.16 - - 0.00 OK
RAIN WATER HARVESTING - - 47.87 - - 6.68 - - 7.16 - - 0.00 OK
WATER RESERVOIR - - 1620.00 - - 27.00 - - 60.00 - - 0.00 OK
ETP - - 1456.00 - - 28.00 - - 52.00 - - 0.00 OK
RAIN WATER HARVESTING - - 16.00 - - 4.00 - - 4.00 - - 0.00 OK
COOLING TOWER - - 84.00 - - 7.00 - - 12.00 - - 0.00 OK
ELECTRIC SUBSTATION - - 200.00 - - 10.00 - - 20.00 - - 0.00 OK
ENT.GATE - - 23.73 - - 1.69 - - 14.24 - - 0.00 OK
Under ground water tank - - 14.79 - - 3.14 - - 4.71 - - 0.00 OK
Under ground water tank - - 14.79 - - 3.14 - - 4.71 - - 0.00 OK
Under ground water tank - - 36.42 - - 4.61 - - 7.90 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
SECURITY ROOM - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 - - 0.00 OK
Generator Room - - 150.00 - - 10.00 - - 15.00 - - 0.00 OK





[-] Accessory Use No. Checks
Building Name Accessory Use Name No Status
Reqd Perm Prop
1 (GODOWN ) Rain Water Harvesting 1 - 5 OK
Entrance Gate 1 - 1 OK
2 (GRAIN STORAGE) Rain Water Harvesting 1 - 5 OK
Toilet 1 - 18 OK
Entrance Gate 1 - 1 OK
3 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION) Rain Water Harvesting 1 - 5 OK
Toilet 1 - 18 OK
Entrance Gate 1 - 1 OK
4 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION ) Rain Water Harvesting 1 - 5 OK
Toilet 1 - 18 OK
Entrance Gate 1 - 1 OK
5 (IMPURE SPIRIT AND STORAGE SECTION) Rain Water Harvesting 1 - 5 OK
Toilet 1 - 18 OK
Entrance Gate 1 - 1 OK
6 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION ) Rain Water Harvesting 1 - 5 OK
Toilet 1 - 18 OK
Entrance Gate 1 - 1 OK
7 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION) Rain Water Harvesting 1 - 5 OK
Toilet 1 - 18 OK
Entrance Gate 1 - 1 OK
9 (ADMIN BUILDING) Rain Water Harvesting 1 - 5 OK
Entrance Gate 1 - 1 OK
8 (ETHANOL STORAGE SECTION) Rain Water Harvesting 1 - 5 OK
Toilet 1 - 18 OK
Entrance Gate 1 - 1 OK
10 (OFFICE) Rain Water Harvesting 1 - 5 OK
11 (DISPENSORY AND REST ROOM) Rain Water Harvesting 1 - 5 OK
Toilet 1 - 18 OK
Entrance Gate 1 - 1 OK
12 (EXCISE OFFICE) Rain Water Harvesting 1 - 5 OK
Toilet 1 - 18 OK
Entrance Gate 1 - 1 OK
13 (ROOM) Rain Water Harvesting 1 - 5 OK
Toilet 1 - 18 OK
Entrance Gate 1 - 1 OK
14 (CO2 PLANT) Rain Water Harvesting 1 - 5 OK
Toilet 1 - 18 OK
Entrance Gate 1 - 1 OK
15 (CANTEEN) Rain Water Harvesting 1 - 5 OK
16 (ASH HANDLING AND TURBINE AND DG SET BOILER) Rain Water Harvesting 1 - 5 OK
Entrance Gate 1 - 1 OK
17 (SPARES AND TOOL ROOM ) Rain Water Harvesting 1 - 5 OK
   
   


[-] Floor Details (Table 9)
   

[-] Building:1 (GODOWN )


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:10 (OFFICE)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:11 (DISPENSORY AND REST ROOM)


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Floor:FIRST FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:12 (EXCISE OFFICE)


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Building:13 (ROOM)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:14 (CO2 PLANT)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:15 (CANTEEN)


[-] Floor:FIRST FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:16 (ASH HANDLING AND TURBINE AND DG SET BOILER)


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Building:17 (SPARES AND TOOL ROOM )


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Building:2 (GRAIN STORAGE)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Building:3 (MILLING SECTION AND LIQUIFICATION SECTION AND MCC ROOM FOR FERMENTATION SECTION AND FERMENTATION SECTION)


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Building:4 (DISTILLATION AND MSDH AND INTEGRATED EVAPORATION SECTION )


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Building:5 (IMPURE SPIRIT AND STORAGE SECTION)


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Building:6 (C T FOR DIST AND EVAPORATION AND LIQUEFACTION )


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Building:7 (STANDALONE EVAPORATION AND DDGS STORAGE AND DECANTATION DRYER SECTION)


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Building:8 (ETHANOL STORAGE SECTION)


[-] Floor:GROUND FLOOR PLAN



No Room Found.

[-] Building:9 (ADMIN BUILDING)


[-] Floor:GROUND FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.

[-] Floor:FIRST FLOOR PLAN



Not Required to Check Dimensions and Area of all the Rooms on this Floor Rule.


   


[-] Summary (Table 10)
   
Name Perm./Reqd. Proposed Status
  Plot Area - 93756.91 OK
  Plot Width - 406.74 OK
  Plot Depth - 230.51 OK
  Access Width 9.00 20.00 OK
  Plot Frontage - 407.27 OK
  Coverage Area 46878.45 14064.24 OK
  FAR Area
Bldg. FAR Area : 14744.23
Sanctioned FAR Area :0.00
187513.81 14744.23 OK





[-] Rules
Topic Rule
Plot Level
Plot Area No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Width No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Plot Depth No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
Access Width The minimum width of abutting road for Institutional, administrative, assembly, industrial and other Nonresidential and commercial activities shall be 9.0 mt.{As per Rule no. 34.5 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Plot Frontage No rule provided for Min. Plot size for proposed Use or Multistoried Building {Updated as per JBBL, Amendment VIII dated 16/03/2021}
FAR Area (1) For Industrial buildings non-polluting and household, the Floor Area Ratio-FAR shall be 2.0 {As per Rule No. 39.5}
(2) 0.0
Consumed FAR (1) For Industrial buildings non-polluting and household, the Floor Area Ratio-FAR shall be 2.0 {As per Rule No. 39.5}
(2) 0.0
Common Plot Area In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
Common Plot (1) ; In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
(2) ;
(3) In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
(4) ;
Tree Number Mini. 8 Trees shall be required for the Plot area above 1000.0 sq.mt. (As per Rule No. 20.1.6)
DriveWay Rule For Plor area above 2000 sq.mt., The minimum width or driveways should not be less than 4.50 mt. {As per Rule No. 41.2 and modified as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Margin Rule For Multistoried Building, having Building Height 16.40-19.25 mt.,Margin required in Front shall be 6.5 mt., Rear 4.5 mt. and 4.5 mt. shall be provided on both side. {As per Rule No. 37 Table 14}
PWork to PWork Margin Reqd Building to Building margin shall be 6 mt. or 1.5 times side setback required for the taller block whichever is high {As per Rule No. 38.1}
Building Level
Building Height For old area, on Road width above 18.30 mt., No restriction on height and number of floors however it may be regulated by the master plan/development plan/zonal plan {As per Rule No. 39.1 Table 15}
Floor Height (1) No rule found for Mini. reqd Floor height
(2) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
(3) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
(4) The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab){As per Rule No.42.2.1}
Parapet Height (1) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(2) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(3) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(4) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(5) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Floor Number For old area location,on Road width 18.30 mt. and above, No restriction on height and number of floors however it may be regulated by the master plan/development plan/zonal plan {As per Rule No. 39.1 Table 15}
StairCase (1) Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. {As per Rule No. 83.18}
(2) ; No Rule Defined
(3) Width of Winding staircase shall be mini. 0.75 mt.,Maximum rise 0.20 mt. & Minimum tread 0.225 mt. & Cabin height 2.1 mt {As per Rule No. 83.18}
(4) ; No Rule Defined
Plot / Building Level
Accessory Use (1) Common toilet of maximum size of 5 sq.mt shall be taken Free from FAR
(2) No need to check distance from Building Toilet
(3) -
(4) No need to check distance from Building COOLING TOWER
(5) -
(6) No need to check distance from Building COMPRESSOR
(7) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(8) No need to check distance from Building RAIN WATER HARVESTING
(9) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(10) No need to check distance from Building WATER RESERVOIR
(11) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(12) No need to check distance from Building ETP
(13) Electric cabin or substation of maximum size of 4 sq.m. with minimum width or diameter of 2 m
(14) No need to check distance from Building COOLING TOWER
(15) Electric cabin or substation of maximum size of 4 sq.m. with minimum width or diameter of 2 m
(16) No need to check distance from Building ELECTRIC SUBSTATION
(17) No need to check distance from Building ENT.GATE
(18) -
(19) No need to check distance from Building Under ground water tank
(20) Security Cabin of maximum size of 4 sq.m. with minimum width or diameter of 2 mt. shall be taken Free from FAR
(21) No need to check distance from Building SECURITY ROOM
(22) Electric cabin or substation of maximum size of 4 sq.m. with minimum width or diameter of 2 m
(23) No need to check distance from Building Generator Room
Accessory Use Number (1) Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
(2) In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premise shall not be less than 5 (five) meters i n width in order to allow easy access to fire engine Entrance Gate
(3) Provision of toilets for visitors and separate toilets for guards and drivers shall be provided for Multistoried for Commercial and multidwelling units including Apartments Toilet
Building Level (Rooms)