No Image Found   

Failed List Report

Mineral Area Development Authority

Version Number: 1.0.66  
Version Date: 16/10/2020 
Report Generated On: 05-09-2023 
 

[-] Collapse All


General Details
RegionJHARKHAND URBAN LOCAL BODIES
DistrictDHANBAD
AuthorityMINERAL AREA DEVELOMENT AUTHORITY
Inward_NoMADA/BP/0099/2023
Application TypeGeneral Proposal
Project TypeBuilding Permission
Nature of DevelopmentNew
Location of Development AreaOld Area
City Area/TPScheme NoNA
VillageKharkabad
Taluka15
Architect Details
Architect NameANIL KUMAR CHAUDHARY
License No.MADA/ENG/0005/2019
Architect AddressFLAT NO-GR-E EKANT APPARTMENNT NEAR KALI MANDIR BEKAR BANDH DHANBAD
Architect EmailIDniketanconsultancydnb@gmail.com
Architect Mobile No9431124008
Plot Details
Plot Use Educational
Plot SubUse School
PlotNearbyReligiousStructure NA
Plot/SubPlot No1138,1502,1503,1504,1505,1506,1507,1508,1512,1593,1594,1595(OLD)2724,2740,2761,2762,2763,2765,2767,2769,2770,2771,2772,2773,2774,2775,2778,2779,2780,2781,2782,2783,2784,2791,2793,2795(NEW)
NorthRoad Width - G.T.ROAD 60
SouthPlot No. - PART OF PLOT NO-1599
EastPlot No. - PART OF PLOT NO-1510,1511,1512
WestSurvey No. - PART OF PLOT NO-1138,1140
Owner's Details
NameSAMADHAN SIKSHA DAAN KI NAI PATHSHALA SECRERARY-SRI CHANDAN SINGH
AddressBANK MORE DHANBAD
Email IDchandan7326@gmail.com
Mobile No9304477815
[-] Plot Details (Table 2)

[-] Area From Document (Table 2a)
No. Form Area
1 Deed(Sale Deed, Gift Deed and Lease Deed) or Agreement 6133.21
2 Plot area as per Document by Applicant 6112.90
3 Physical area measured at site 6112.90
4 Area as per Site Visit (Site Visit Report) 6112.90
5Area as per Drawing 6112.83

Area of Plot Considered : 6112.83

[-] Table 2b
Proposal Detail :
Unit
Development Detail :
PlotPLOT
Plot OccupancyEducational
Plot SubUse School
Building StructureNon-Highrise
Building TypeSingle Detached House
Gross Plot Area 6112.83
Net Plot Area (Gross Plot Area - Deduction from Gross Plot area) 6112.83
Balance Plot Area (Net Plot Area - Recreational/Amenity space) 5363.15
Deductions for Balance Plot Area (from Gross Plot Area)
- Common Plot 749.68
749.68
Balance Plot Area 5363.15

[-] Table 2c
COVERAGE CHECK
Permissible Coverage area ( 50.00 % ) 3056.42
Proposed Coverage Area ( 39.37 % ) 2406.73
Total Prop. Coverage Area ( 39.37 % ) 2406.73
Balance coverage area ( 10.63 % ) 649.69
FAR CHECK
Perm. FAR Area ( 2.250 ) 13753.87
Total Perm. FAR area 13753.87
Special FAR 7059.66
Proposed FAR Area 7059.66
Total Proposed FAR Area 7059.66
Consumed FAR (Factor) 1.15
Balance FAR Area 6694.21
BUA CHECK
Total Proposed BuiltUp Area 7098.30


[-] Site Visit Data Report
Details Values as per Site Visit Values as per Drawing
Lenght of Road Up to 50 meter -
Existing Road Width 60 60.00
Proposed Road Width as per Master Plan 60 -
Road Widening Width 0 -
Plot size (as per measurement) 6112.9 6112.83
[-] Extra Land Area Checks
Name Area Status
Reqd Prop
Extra Land - 0.00 OK
   



[-] Rules
Topic Rule
Plot Level
Plot Area The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
Plot Width The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
Plot Depth The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
Access Width The minimum width of abutting road for Primary/Upper Primary school category shall be 9.0 mt. {As per Rule No. 35.1, Table 7}
Plot Frontage The minimum size of plot for Primary/Upper Primary school category shall be 2000.0 sq.mt. {As per Rule No. 35.1, Table 7}
FAR Area (1) For Educational, Institutional and Assembly building above 1000 sq.mt. Plot area, the Floor Area Ratio-FAR shall be 2.25 {As per Rule No. 39.3}
(2) 0.0
Consumed FAR (1) For Educational, Institutional and Assembly building above 1000 sq.mt. Plot area, the Floor Area Ratio-FAR shall be 2.25 {As per Rule No. 39.3}
(2) 0.0
Common Plot Area In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
Common Plot (1) ; In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
(2) ;
(3) In case of multi-storied buildings/ Group Housing /Apartment building/ Industrial/ Assembly/ Educational/ Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover) {As per Rule No.33}
(4) ;
Tree Number Mini. 8 Trees shall be required for the Plot area above 1000.0 sq.mt. (As per Rule No. 20.1.6)
Margin Rule For Educational Building, Margin required in Front shall be 9.0 mt., Rear 6.0 mt. and 6.0 mt. shall be provided on both side. {As per Rule No. 38.2.1}
Building Level
Building Height For old area, on Road width above 18.30 mt., No restriction on height and number of floors however it may be regulated by the master plan/development plan/zonal plan {As per Rule No. 39.1 Table 15}
Floor Height (1) For Educational Bulding, The height of all rooms shall not be less than 3.3 m measured from the surface of the floor to the lowest point of the ceiling
(2) For Educational Bulding, The height of all rooms shall not be less than 3.3 m measured from the surface of the floor to the lowest point of the ceiling
(3) The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 0.45 mt. from the surrounding ground level {As per Rule No. 42.10}
Parapet Height (1) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(2) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
(3) Parapet of suitable height may be constructed to hide installation like water tank and for other such purpose {As per Rule No. 42.5 and Updated as per JBBL, Amendment VIII dated 16/03/2021}
Floor Number For old area location,on Road width 18.30 mt. and above, No restriction on height and number of floors however it may be regulated by the master plan/development plan/zonal plan {As per Rule No. 39.1 Table 15}
Lift Count (1) The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
(2) For Non-Residential Building, Minimum number of lifts to be 2 for all non-residential building above ground + 2 and the minimum capacity shall be 6 persons per floor. {As per Rule No. 49.2.3 and as per Notification from Govt. of Jharkhand 3141 dated 15/05/2017}
Lift (1) The area of lift well at one floor only (not the sum of total area of lift well at every floor) shall be counted for F.A.R calculation)
(2) The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
(3) The area of lift well shall not be counted for F.A.R calculation)
(4) The lift shall have a minimum width 1.7 mt. and minimum depth 1.9 mt.{As per clause no 4 and page no. 14 NBC }
(5) -
StairCase (1) Width of Winding staircase shall be mini. 0.90 mt.,Maximum rise 0.20 mt. & Minimum tread 0.25 mt. & Cabin Height 2.1 mt. {As per Rule No. 83.18}
(2) ; No Rule Defined
(3) No Rule Defined
(4) ; No Rule Defined
Plot / Building Level
Accessory Use (1) -
(2) No need to check distance from Building SUMP TANK
(3) The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sq. m. of roof area
(4) No need to check distance from Building RAIN WATER HARVESTING
(5) No need to check distance from Building ENT.GATE
(6) -
(7) No need to check distance from Building SOLAR HEATING SYSTEM
Accessory Use Number (1) Provision of Rain Water Harvesting shall be mandatory for any use {Updated as per JBBL, Amendment VIII dated 16/03/2021} Rain Water Harvesting
(2) In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premise shall not be less than 5 (five) meters i n width in order to allow easy access to fire engine Entrance Gate
Building Level (Rooms)